Need for Comprehensive Operations Analysis Recap of Work What Did - - PowerPoint PPT Presentation

need for comprehensive operations analysis recap of work
SMART_READER_LITE
LIVE PREVIEW

Need for Comprehensive Operations Analysis Recap of Work What Did - - PowerPoint PPT Presentation

Need for Comprehensive Operations Analysis Recap of Work What Did We Hear Initially? Goals Goals (cont.) Proposed System Accomplishments Customer Service Cost Efficiencies Significantly reduces travel times for Overall cost


slide-1
SLIDE 1
slide-2
SLIDE 2

Need for Comprehensive Operations Analysis

slide-3
SLIDE 3

Recap of Work

slide-4
SLIDE 4

What Did We Hear Initially?

slide-5
SLIDE 5

Goals

slide-6
SLIDE 6

Goals (cont.)

slide-7
SLIDE 7

Proposed System Accomplishments

Cost Efficiencies

  • Overall cost reduction
  • Greater flexibility to operate routes only

when sufficient demand exists

  • Makes better use of downtime and bus

movements to maximize revenue services

  • Eliminates service to some of the lowest

ridership areas

  • Reduces peak vehicle requirement and

associated costs

Customer Service

  • Significantly reduces travel times for

the longest trips (by more than 50%)

  • Improves timely connections between

routes makes regional travel easier

  • Hourly frequencies on most routes
  • Clockface scheduling on most routes
  • Extends service coverage to identified

areas

  • Maintains current daily span of service
slide-8
SLIDE 8

Proposed Service Design

slide-9
SLIDE 9

Proposed Fare Structure

slide-10
SLIDE 10

Timeline/Calendar

Late-Fall/Early Winter Public Hearings on Proposed Service Plan and Fare Considerations Spring 2020 Design and implement marketing plan July 2020 Transition to new redesigned system

slide-11
SLIDE 11

Questions?

11

slide-12
SLIDE 12