mpo co mmitte e me e ting s no ve mb e r 2014 study
play

MPO Co mmitte e Me e ting s No ve mb e r 2014 Study Purpose Co - PowerPoint PPT Presentation

MPO Co mmitte e Me e ting s No ve mb e r 2014 Study Purpose Co lumb us Drive & 17/ 18/ 19 th Ave nue s (14 th Stre e t to 40 th Stre e t) Sc he dule d fo r re surfa c ing F Y16 - Hillsb o ro ug h Co unty Citize n & b usine ss


  1. MPO Co mmitte e Me e ting s No ve mb e r 2014

  2. Study Purpose Co lumb us Drive & 17/ 18/ 19 th Ave nue s (14 th Stre e t to 40 th Stre e t) • Sc he dule d fo r re surfa c ing F Y16 - Hillsb o ro ug h Co unty • Citize n & b usine ss re q ue st fo r re de sig n - City o f T a mpa , BOCC • T e a me d up with the MPO to study a lte rna tive s with o the r sta ke ho lde rs

  3. Community Outreach “17 th & N. 15 th is a very dangerous intersection” “Make area more pedestrian friendly with lighting” “Crosswalk that leads directly into Academy Prep.” “Street parking on Columbus is a must!” “West bound right turn lane for trucks at 40 th St” “Smoother travel across RR Crossings” “Bike lanes or sharrows” “Preserve/enhance historic lighting and install “People drive the wrong way on brick-paver crosswalks at the intersections” Columbus all day every day”

  4. When asked if supportive of the When asked thoughts on roadways being 2-way, directing more traffic to over 70% were Columbus: supportive or very This would bring in economic • supportive development and financial resources to the community People would be out at park & • walking, meeting neighbors 17/18/19 will feel more like a • neighborhood Safer if speed controlled • Worried parked cars will get hit •

  5. Traffic Analysis – Level of Service One-way Two-way

  6. Traffic Analysis – Travel Times Existing Year (2014) Morning Peak Hour Afternoon Peak Hour One-Way Two-Way One-Way Two-Way Columbus Drive 6:18 5:52 7:03 6:20 EB N/A 6:39 N/A 7:20 WB 17/18/19 N/A 4:54 N/A 4:53 EB 6:00 4:29 6:20 4:31 WB Travel Times & LOS are the same if not slightly better than the current one-way travel times.

  7. Draft Recommendations • T wo -wa y b o th c o rrido rs • Co lumb us Drive – 2/ 3 tra ffic • 17 th / 18 th / 19 th Ave nue s – ne ig hb o rho o d • On-stre e t pa rking ne e de d o n b o th • Ac c o mmo da te truc k de live rie s

  8. Columbus Drive - BEFORE

  9. Columbus Drive - AFTER

  10. 17 th /18 th /19 th - BEFORE

  11. 17 th /18 th /19 th - AFTER

  12. Next Steps • Me e t with Co unty a nd City o n c o sts • Pub lic Me e ting E a rly De c e mb e r 2014 • Pre se nte d to the MPO Bo a rd in Ja nua ry fo r a ppro va l

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend