moving forward
play

Moving Forward, Keeping Up With The Modernized Farmer Merlon - PowerPoint PPT Presentation

Moving Forward, Keeping Up With The Modernized Farmer Merlon Kidwell Watermaster Imperial Irrigation District 2 Colorado River - Hoover Dam Lake Mead 4 day water travel time to Imperial Dam 4 Days Master Order Requirement Set


  1. Moving Forward, Keeping Up With The Modernized Farmer Merlon Kidwell Watermaster Imperial Irrigation District

  2. 2

  3. Colorado River - Hoover Dam – Lake Mead • 4 day water travel time to Imperial Dam • 4 Days Master Order Requirement • Set 24-hour water order (Imperial Dam) 3

  4. Imperial Dam • Completed 1938 (BCA 1928) • AAC 15,155 CFS • IID 6,200 CFS • Yuma Water Users • Coachella Branch 1,000 CFS • 3 Desilting Basins (90% silt) • Gila Main 2,200 CFS • Republic of Mexico 4

  5. Senators Wash Reservoir 5

  6. USBR’s Brock Reservoir • 8,440 AF Max • 1,800 CFS Inlet/Outlet • 6.5 mile inlet canal • Reducing over delivery to Mexico 6

  7. All American Canal 1940 first diversion IID, Coachella Canal, Yuma Water Users 7

  8. Imperial Irrigation District • 1,440 miles of laterals • 230 miles of main canals • 479,000 acres of farmland • 5,600 delivery gates • 1,450 miles of drains • 24 hour water travel times 8

  9. Adjusting to Flexible Water Delivery • Changing from a 24 hour based system to a flexible delivery system. • Efficient irrigation/farming does not always work based on 24 hours at a time. • IID has been on a 30 year transition from 24 hour order “only” system to a more flexible 12/24 hour order system. 9

  10. Water Delivery Flexibility • Water users delivery flexibility demands have increased dramatically as farmers strive for efficiency.  >300,000 acre-feet returned annually from 12-hour deliveries • Delivery flexibility requires increased operational reservoir storage and lateral interties to manage returned water  Main Canal reservoirs, mid-lateral reservoirs, on farm reservoirs  Working on creating a economical/efficient storage combination  Intertie connections to shorten lateral transportation time.  Increase reliance on SCADA – Zanjero Laptops 10

  11. 12 Hour Delivery Total Orders 12,000 10,000 8,000 6,000 4,000 2,000 0 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec 2005 2006 2007 2008 2009 2010 2011 2012 11

  12. Interceptor Reservoir Systems 12

  13. Regulating/Interceptor Reservoirs • 11 Reservoirs • 4,000 AF of Storage • Need to double current storage in the next 10 years. 13

  14. Lateral Interties Reducing Transportation Losses 14

  15. Main Canal SCADA Control • First 40 miles of AAC – Imperial Dam Control Room (USBR Direction) • Remaining 190 miles of main canals, AAC, EHL, CM & WSM 24/7 SCADA Water Control Center (IID) • . 15

  16. 16

  17. Lateral Control - Zanjeros Water is moved using SCADA System (230 Miles)  Laterals 1,440 Miles, Over 3,000 Manual Control Structures,  5,600 delivery gates  Adding Zanjero SCADA control (Laptop control of lateral  headings & monitoring of key sites) by end of 2017. All headings are scheduled for SCADA Control (5 years)  80 headings (120 remaining) 

  18. 18

  19. Projects in Development • 2016 completed 6 new interties, 3 new ones in 2017 • Proposed 5 new main canal reservoirs, 5,000 AF of additional storage • Proposed new interceptor/reservoir system (Save 13,000 AF annually) • Expand Seepage Recovery Project (35,000 AF annually) • Groundwater Storage & Recovery • Discharge Reduction Program (Zanjero SCADA) • 19

  20. Water Conservation Agreements

  21. 21

  22. 22

  23. Home Sweet Home 23

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend