Mobile Infrastructure Project 1 MIP - Overview Arqiva appointed by DCMS to deliver the MIP 150m UK Government funded project to provide mobile phone coverage by all 4 mobile network o perators in Not Spot areas A Not Spot area


  1. Mobile Infrastructure Project 1

  2. MIP - Overview  Arqiva appointed by DCMS to deliver the MIP  £150m UK Government funded project to provide mobile phone coverage by all 4 mobile network o perators in “Not Spot” areas  A Not Spot area is one where no effective coverage is provided by any of the mobile network operators, usually because it is uneconomic to do so  The Not Spots were developed by Ofcom using data provided by the Mobile Network Operators. The Not Spot data is subject to a non-disclosure agreement  Capital cost of the MIP is publicly funded  Operating cost (Rent, Rates, Electricity, Transmission, Maintenance) to be met by the four Mobile Network Operators  All four Mobile Network Operators have agreed to occupy all MIP sites for 20 years 2

  3. Example not spots A not spot is an area (100m x 100m) containing 3 Premises, with no coverage from any operator

  4. – all on the same site! The Challenge Planning permission Economic power supply (i.e. Nearby) Access, for build and operation Economic site rental 4 Economic construction cost

  5. Typical Transmission Profile 5

  6. The transmission challenge  Arqiva is responsible for providing point-to-point radio transmission links (backhaul) to the mobile network operators’ nearest available sites  The mobile operators need to provide backhaul from there into their core networks  This requires ‘IP’ connectivity which is not yet available in some areas  Arqiva will deliver MIP sites as soon as this connectivity becomes available (& provided all the other necessary criteria can be met) 6

  7. MIP locations – Key Note: These are search centres not actual sites = Original nominal location = Revised nominal location with transmission solution = Revised nominal location with no current transmission solution 7

  8. Planned MIP locations in North Herefordshire 8

  9. Planned MIP locations in North Herefordshire 9

  10. Planned MIP locations in South Herefordshire 10

  11. Contact for MIP: Peter Wingate-Saul National Community Relations Manager Peter.wingate-saul@arqiva.com 07508 415488 Or: mip.stakeholders@arqiva.com 11

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.