Mobile Infrastructure Project 1 MIP - Overview Arqiva appointed by - - PowerPoint PPT Presentation

Mobile Infrastructure Project 1 MIP - Overview Arqiva appointed by DCMS to deliver the MIP 150m UK Government funded project to provide mobile phone coverage by all 4 mobile network o perators in Not Spot areas A Not Spot area


slide-1
SLIDE 1

1

Mobile Infrastructure Project

slide-2
SLIDE 2

2

MIP - Overview

 Arqiva appointed by DCMS to deliver the MIP  £150m UK Government funded project to provide mobile phone coverage by all 4 mobile network operators in “Not Spot” areas  A Not Spot area is one where no effective coverage is provided by any of the mobile network operators, usually because it is uneconomic to do so  The Not Spots were developed by Ofcom using data provided by the Mobile Network Operators. The Not Spot data is subject to a non-disclosure agreement  Capital cost of the MIP is publicly funded  Operating cost (Rent, Rates, Electricity, Transmission, Maintenance) to be met by the four Mobile Network Operators  All four Mobile Network Operators have agreed to occupy all MIP sites for 20 years

slide-3
SLIDE 3

3

Example not spots

A not spot is an area (100m x 100m) containing Premises, with no coverage from any operator

slide-4
SLIDE 4

4

The Challenge

Access, for build and operation Economic power supply (i.e. Nearby) Economic site rental Planning permission

– all on the same site!

Economic construction cost

slide-5
SLIDE 5

5

Typical Transmission Profile

slide-6
SLIDE 6

6

The transmission challenge

 Arqiva is responsible for providing point-to-point radio transmission links (backhaul) to the mobile network operators’ nearest available sites  The mobile operators need to provide backhaul from there into their core networks  This requires ‘IP’ connectivity which is not yet available in some areas  Arqiva will deliver MIP sites as soon as this connectivity becomes available

(& provided all the other necessary criteria can be met)

slide-7
SLIDE 7

7

MIP locations – Key Note: These are search centres not actual sites = Original nominal location

= Revised nominal location with transmission solution

= Revised nominal location with no current transmission solution

slide-8
SLIDE 8

8

Planned MIP locations in North Herefordshire

slide-9
SLIDE 9

9

Planned MIP locations in North Herefordshire

slide-10
SLIDE 10

10

Planned MIP locations in South Herefordshire

slide-11
SLIDE 11

11

Contact for MIP:

Peter Wingate-Saul National Community Relations Manager Peter.wingate-saul@arqiva.com 07508 415488 Or: mip.stakeholders@arqiva.com