SLIDE 1 MIL IT ARY OCE AN T E RMINAL SUNNY POINT JOINT L AND USE ST UDY
ADVI SORY COMMI T T E E ME E T I NG AUGUST 28, 2018
NEED SOME SORT OF IMAGE
SLIDE 2
- Study Upda te s
- Pub lic Me e ting Summa ry
- Re vie w Co mpa tib ility Ana lysis
- Se t Upc o ming Me e ting Da te s
- Ge ne ra l Disc ussio n
- Adjo urn
ME E T I NG AGE NDA
SLIDE 3 ST UDY UPDAT E S
a rme n (SDDC Co mma nde r)
- Sta ke ho lde r inte rvie w with NC DNCR
re pre se nta tive s:
– Chie f De puty Se c re ta ry – De puty Se c . fo r Arc hive s & Histo ry – Dire c to r o f Histo ric a l Re so urc e s – Dire c to r o f E
a ste rn NC Histo ric Site s
– NC Sta te Pa rks – Cle a n Wa te r Ma na g e me nt T
rust F und
– Offic e o f Sta te Arc ha e o lo g y – NC Aq ua riums
nte rvie w with c o nsulta nt pre pa ring Brunswic k Co unty E c o no mic De ve lo pme nt Pla n
SLIDE 4 PROJE CT SCHE DUL E
Date Meeting
2018
February 23 Project Team Meeting April 11 Project Kickoff, Installation Tour & Committee Meetings May 21-24 Stakeholder Interviews June Advisory Committee Meeting – Review Background Research July 30 Public Meeting – Overview & Research - 1 Day (2 locations) August Advisory Committee Meeting – Review Compatibility Analysis October Advisory Committee Meeting - Review Conflict Resolution Strategies November Policy Committee Meeting – Review Conflict Resolution Strategies December Public Meetings – Interim Findings - 1 Day (2 locations) December Advisory Committee Meeting – Draft Recommendations
2019
January Policy Committee Meeting – Draft Recommendations February Advisory Committee Meeting – Present Draft Study Documents March Advisory & Policy Committee Meetings – Finalize Study Documents April/May Public Meetings – Final Presentation - 1 Day (2 locations)
SLIDE 5
JUL Y 30 PUBL I C ME E T I NGS
SLIDE 6
COMPAT I BI L I T Y ANAL YSI S
SLIDE 7
- Purpo se -b uilt a mmunitio n tra nsshipme nt
te rmina l – SAF
E T Y
- Ammunitio n is sta g e d te mpo rarily a t the
te rmina l, while wa iting to b e shippe d.
- Co mpo se d o f thre e g e o g ra phic a lly se pa ra te
a re a s:
– Ma in T
e rmina l: 8,600 a c re s
– Ple a sure I
sla nd Buffe r Zo ne : 2,200 a c re s
– L
e la nd I nte rc ha ng e Ya rd: 650 a c re s
e rmina l linke d to L e la nd I nte rc ha ng e b y a 16 mile ra il line .
I NST AL L AT I ON CHARACT E RI ST I CS
SLIDE 8
JL US ST UDY ARE A
MAP GOES HERE MAIN TERMINAL RAIL CORRIDOR LELAND YARD BUFFER ZONE MOTSU Components
SLIDE 9
- Prima ry po ints o f po te ntia l c o mpa tib ility
c o nc e rn:
– Ma inta ining use o f the full e xte nt o f E
SQD fo r te mpo ra ry sta g ing , a s we ll a s lo a ding a nd unlo a ding ve sse ls during tra nsshipme nt
– Ma inta ining sa fe a nd e ffic ie nt
tra nspo rta tio n a c c e ss:
– Ma inta ining minima l le ve ls o f e nviro nme nta l
c o nstra int.
MI SSI ON COMPAT I BI L I T Y
SLIDE 10
SQD = E xplo sive Sa fe ty Qua ntity Dista nc e
F a c to r = Assume d de g re e o f risk use d in c a lc ula ting E SQD.
xa mple E SQD Arc s:
– Pub lic T
ra ffic Ro ute (PT RD) (K 24/ 30)
– I
nha b ite d Building (I BD) (K 40/ 50)
– K
88
– Ab so lute Sa fe Dista nc e = K
328
SQD F
W1/ 3
– D = Dista nc e (ft.) – W = Ne t E
xplo sive We ig ht (lb s.)
E XPL OSI VE S SAF E T Y ZONE S
SLIDE 11
SQD Zo ne s a re no t a pplic a b le to munitio ns during the ir tra nspo rta tio n:
– T
ruc k tra ffic o n lo c a l hig hwa ys
– Ra il tra ffic , inc luding in the L
e la nd Ya rd a nd
– Ship tra ffic in the Ca pe F
e a r Rive r
e rmina l, a mmunitio n is te mpo rarily sta g e d pe r the lic e nse a nd a pplic a b le E SQD a rc s fo r e a c h ho lding a re a .
SQD zo ne s e xpa nd a nd c o ntra c t a s munitio ns a re te mpo ra rily sta g e d a nd the n shippe d o ut.
E XPL OSI VE S SAF E T Y ZONE S
SLIDE 12 JL US ST UDY ARE A
MAP GOES HERE Inhabited Building Safety Zone
Inhabited Building Distance Arc Blast Easements
SLIDE 13
- Do D Ma nua l 6055.09 / DA Pa mphle t 385-64
e sta b lish siting c rite ria fo r c e rta in use s within the I nha b ite d Building Dista nc e (a s we ll a s
- the r sa fe ty zo ne s).
- Prima rily fo c use d o n use s typic a lly fo und o n a
milita ry insta lla tio n / a mmunitio n fa c ility.
- Be st g uida nc e a va ila b le , a nd c a n b e
tra nsla te d to a pply to c ivilia n use s.
I BD COMPAT I BI L I T Y
SLIDE 14
DA PAM 385-64 USE T ABL E S
SLIDE 15
DA PAM 385-64 USE T ABL E E XAMPL E S
RE CRE AT I ON USE S WAT E R ST ORAGE T ANK S
SLIDE 16 JL US ST UDY ARE A
MAP GOES HERE IBD Non-MOTSU Uses
Non-MOTSU Uses Inhabited Building Distance Arc Blast Easements
SLIDE 17
de ntifie d 19 site s / use s / struc ture s within the I nha b ite d Building Dista nc e E SQD a rc .
– 17 pub lic / 2 priva te – 9 o n MOT
SU la nd (e xc lude s USAF Re c . Are a )
– USAF
re c re a tio n a re a is o n US Go ve rnme nt (no t MOT SU la nd) a nd is sub je c t to a se pa ra te c o mpa tib le use a g re e me nt
– 9 within c o mpa tib le use e a se me nts – Use s o n MOT
SU la nd sub je c t to lic e nse s g ra nte d b y the De pa rtme nt o f the Army
I BD USE CHARACT E RI ST I CS
SLIDE 18
- Pub lic wo rks fa c ilitie s (wa te r / wa ste wa te r)
- Pub lic pa rk in K
ure Be a c h
Re c re a tio n Are a – no t pa rt o f MOT SU
AA Jo int Surve illa nc e Syste m Ra da r F a c ility
ishe r F e rry – la nding , a dmin b uilding , pa rking a re a , e tc .
- NCWRC Bo a t Ra mp
- Brunswic k T
- wn / F
- rt Ande rso n – histo ric site s
a nd struc ture s, visito rs c e nte r, suppo rt b ldg s.
ne rg y firing ra ng e
I BD USE CHARACT E RI ST I CS
SLIDE 19
- Co mplia nc e with Do D / DA use g uida nc e
- F
re q ue nc y o f use / time o f o c c upa tio n
- De nsity o f o c c upa tio n
- Ca n it b e re lo c a te d?
- I
s it c ritic a l to pub lic sa fe ty?
xisting mitig a tio n me a sure s / a g re e me nts
- Ab ility to impro ve c o mpa tib ility thro ug h de sig n
- r o pe ra tio na l c o nside ra tio ns.
I BD COMPAT I BI L I T Y
SLIDE 20
GL ASS F RAGME NT AT I ON HAZARDS
Do D Ma nua l 6055.09 E xtra c t
SLIDE 21 JL US ST UDY ARE A
MAP GOES HERE Tall Structure Glass Fragmentation Hazard
Inhabited Building Distance Tall Structures (5+ stories)
SLIDE 22
- Do D Ma nua l 6055.09 / DA Pa mphle t 385-64
e sta b lish ide ntic a l “E me rg e nc y Withdra wa l Dista nc e s fo r No ne sse ntia l Pe rso nne l”
- Dista nc e s a re inte nde d fo r initia l re spo nse to
a n inc ide nt invo lving a mmunitio n/ e xplo sive s.
- Sub stitute g uida nc e in the a b se nc e o f E
SQD a rc s fo r the ra il line .
- Applie s to b o th tra nspo rta tio n a nd fa c ilitie s
E ME RGE NCY E VACUAT I ON CRI T E RI A
SLIDE 23 E VACUAT I ON DI ST ANCE S
e va c ua tio n dista nc e whe n o ve r 500 lb s: 5,000 ft.
a c ility inc ide nt e va c ua tio n dista nc e whe n o ve r 55,285 lb s: D=105W1/ 3
SLIDE 24
JL US ST UDY ARE A
MAP GOES HERE 5,000 Foot Emergency Withdrawal Distance Rail Incident Withdrawal Distance
SLIDE 25
- Dista nc e a pplie s to a ny g ive n po int o n the line
whe re a n inc ide nt o c c urs, no t the e ntire line .
- Withdra wa l dista nc e ma y b e inc re a se d b a se d o n
the spe c ific situa tio n.
- Are a Cha ra c te ristic s:
– 2010 Po pula tio n: +/ - 11,200 – 2010 Dwe lling Units: +/ - 5,200
– So uth Brunswic k Sc ho o l Ca mpus – No rthwe st Distric t Pa rk – US 17 Co mme rc ia l Are a – US 74/ 76 I
ndustria l Are a
RAI L I NCI DE NT WI T HDRAWAL ARE A
SLIDE 26 JL US ST UDY ARE A
MAP GOES HERE Rail Incident Withdrawal Distance: Developed Areas
Developed Land Cover
SLIDE 27 JL US ST UDY ARE A
MAP GOES HERE Rail Incident Withdrawal Distance: Population Density (2010)
High Low Population Density
SLIDE 28
JL US ST UDY ARE A
MAP GOES HERE Facility Emergency Withdrawal Distance (D=105W1/3) Facility Incident Withdrawal Distance
SLIDE 29
- Dista nc e a pplie s to a ny g ive n fa c ility – do c ks
we re use d a s a n e xa mple .
- Withdra wa l dista nc e ma y b e inc re a se d b a se d
- n the spe c ific situa tio n.
- Are a Cha ra c te ristic s:
– 2010 Po pula tio n: +/ - 14,300 – 2010 Dwe lling Units: +/ - 10,850
– Brunswic k Nuc le a r Sta tio n – Ple a sure I
sla nd E va c ua tio n Ro ute
– So uth Brunswic k Sc ho o l Ca mpus
F ACI L I T Y I NCI DE NT WI T HDRAWAL ARE A
SLIDE 30 JL US ST UDY ARE A
MAP GOES HERE Facility Incident Withdrawal Distance: Developed Areas
Developed Land Cover
SLIDE 31 JL US ST UDY ARE A
MAP GOES HERE Facility Incident Withdrawal Distance: Population Density (2010)
High Low Population Density
SLIDE 32
E XAMPL E E VACUAT I ON PL AN
SLIDE 33
e a r ma in shipping c ha nne l a nd I CWW c ha nne l fro m Sno ws Cut (pa ss-b y tra ffic ) within sa fe ty zo ne s.
- Re g io na l tra ffic c o ng e stio n c o nc e rns
- F
lo o ding – ma inta ining ro a d a nd ra il a c c e ss
- Gra de c ro ssing s o n the ra il line to L
e la nd
- Brunswic k Nuc le a r Sta tio n
OT HE R ARE AS OF POT E NT I AL COMPAT I BI L I T Y CONCE RN
SLIDE 34
UPCOMI NG ADVI SORY COMMI T T E E ME E T I NGS
SLIDE 35 PROJE CT SCHE DUL E
Date Meeting
2018
February 23 Project Team Meeting April 11 Project Kickoff, Installation Tour & Committee Meetings May 21-24 Stakeholder Interviews June Advisory Committee Meeting – Review Background Research July 30 Public Meeting – Overview & Research - 1 Day (2 locations) August Advisory Committee Meeting – Review Compatibility Analysis October Advisory Committee Meeting - Review Conflict Resolution Strategies November Policy Committee Meeting – Review Conflict Resolution Strategies December Public Meetings – Interim Findings - 1 Day (2 locations) December Advisory Committee Meeting – Draft Recommendations
2019
January Policy Committee Meeting – Draft Recommendations February Advisory Committee Meeting – Present Draft Study Documents March Advisory & Policy Committee Meetings – Finalize Study Documents April/May Public Meetings – Final Presentation - 1 Day (2 locations)
SLIDE 36
- Oc to b e r 10: Adviso ry Co mmitte e
- No ve mb e r 8 o r 13: Po lic y Co mmitte e
- De c e mb e r 4:
– Adviso ry Co mmitte e Me e ting – Pub lic Me e ting s (Afte rno o n + E
ve ning )
PROPOSE D ME E T I NG DAT E S
SLIDE 37
GE NE RAL DI SCUSSI ON
SLIDE 38 MIL IT ARY OCE AN T E RMINAL SUNNY POINT JOINT L AND USE ST UDY
ADVI SORY COMMI T T E E ME E T I NG AUGUST 28, 2018
NEED SOME SORT OF IMAGE