MBT A Capital De live r y De par tme nt Pr oje c t De ve lopme nt Gr oup (PDG) Pr oc e ss July 17, 2019 ACEC Presentation Project Development Group (PDG) Outline MBT A Pro c e ss Cha ng e s MBT A Pro je c t Re vie ws


  1. MBT A Capital De live r y De par tme nt Pr oje c t De ve lopme nt Gr oup (PDG) Pr oc e ss July 17, 2019

  2. ACEC Presentation Project Development Group (PDG) Outline • MBT A Pro c e ss Cha ng e s • MBT A Pro je c t Re vie ws • Pro je c t De ve lo pme nt Gro up (PDG) – Who a re the y? • PDG Pro c e ss Ove rvie w - Purpo se a nd Re spo nsib ilitie s • PDG Pro c e ss Mile sto ne s • Q & A Draft for Discussion & Policy Purposes Only 2

  3. ACEC Presentation Change s and Update s OF F ICE OF T HE CHIE F E NGINE E R – Infr astr uc tur e , E ngine e r ing and Planning • Re spo nsib le fo r a sse t c o nd itio n e va lua tio n a nd c a pita l impro ve me nt pro je c t pro g ra ming • Pre limina ry d e sig n to a le ve l ne c e ssa ry to pro vid e a c o mpre he nsive pro je c t pro g ra m PROJE CT DE L IVE RABL E MIL E ST ONE S • Old De live ra ble Mile sto ne s: 15%/ 30%/ 60%/ 90%/ 100% (PS&E ) – Six Mile sto ne Sub missio ns • Ne w De live ra ble Mile sto ne s: 15%/ 30%/ 75%/ 100% (PS&E ) – F ive Mile sto ne Sub missio ns MBT A INSURANCE PROVIDE R M Glo b a l to HDI Glo b a l Insura nc e Co , o n Ma rc h 1 st 2019 • Cha ng e d fro m F • Fire loss prevention: Stations Maintenance and Storage Facilities Facilities with transportation-relevant power stations Transportation-relevant control rooms • Natural Catastrophes (Nat-Cat): Tunnels Underground stations Projects located in FEMA’s 100-year flood zone A and V Underground pumping stations Draft for Discussion & Policy Purposes Only 3

  4. ACEC Presentation MBTA Project Reviews ing - Pe rfo rme d a t the 15% a nd/ o r 30% sta g e s. Value E ngine e r Risk Analysis - Pe rfo rme d a t the 30% a nd 100% sta g e s. c e Ac c ount - Pe rfo rme d a t the 30%, 75% a nd 100% sta g e s. Inte r nal/ E xte r nal F or oup (PDG) - Pe rfo rme d a t the 15%, 30%, 75% a nd 100% sta g e s. Pr oje c t De ve lopme nt Gr De sign Submittal Re vie w - Pe rfo rme d a t the 15%, 30%, 75% a nd 100% sta g e s. Re vie w - Pe rfo rme d a t the 75% a nd 100% sta g e s. Pe e r Constr uc tability - Pe rfo rme d a t the 75% sta g e . Re vie w – I de ntifie d a t 30% a nd pe rfo rme d a t 75% Insur anc e Pr ovide r Draft for Discussion & Policy Purposes Only 4

  5. ACEC Presentation Pr oje c t De ve lopme nt Gr oup (PDG) – Who Ar e T he y? Se nio r ma na g e rs/ re pre se nta tive s fro m the va rio us MBT A d e pa rtme nts a s e sta b lishe d b y the Offic e o f the Chie f E ng ine e r (OCE ). • Environmental Affairs • Capital Delivery • Bus Operations • Office of the Chief Engineer (OCE) • Safety Department • Risk Management (insurance) • System wide Security • QA/ QC Department • Subway Operations (GL, OL, BL and RL) • Project Controls • Commuter Rail and Water Transportation • Planning/ Development Department • Budget Department • Real Estate Department • Marketing Department • Engineering & Maintenance • Government and Public Affairs • Signals Department • Community Relations Department (CRD) • Communication Department • Law Department • Maintenance of Way (MOW) Department • Police Department • Operations Support • AFC Department • Power Division • System wide Accessibility • Building Division Draft for Discussion & Policy Purposes Only 5

  6. ACEC Presentation PDG Pr oc e ss Ove r vie w oc e ss - Oc c urs a t the 15%, 30%, 75% a nd 100% sta g e s Pr oje c t De ve lopme nt Gr oup (PDG) Pr • Pro je c t De live ra b le Re vie w • PDG Me e ting s Pr oje c t De ve lopme nt Gr oup Re sponsibilitie s • Pro vide dire c tio n to the Pro je c t T e a m re g a rding pro je c t Sc o pe (@ 30%) a nd MBT A re q uire me nts. • Assist the Pro je c t T e a m in ide ntifying a lte rna tive s a nd so lutio ns to de sig n issue s tha t a ffe c t MBT A ma inte na nc e a nd o pe ra tio ns. • Mo nito r pro g re ss in a c hie ving MBT A de sig n a nd/ o r o pe ra tio na l g o a ls. De sign Consultant/ MBT A Pr oje c t Manage r PDG Re sponsibilitie s • No tify the PDG whe n me e ting s a re re q uire d. • Pre se nt the pro je c t sc o pe a nd pro g re ss. • I de ntify ma jo r issue s tha t po te ntia lly ha ve a ne g a tive a ffe c t o n c o st, sc he dule , de sig n, ma inte na nc e a nd/ o r o pe ra tio ns. • Addre ss PDG c o mme nts a nd do c ume nt o utc o me . Draft for Discussion & Policy Purposes Only 6

  7. ACEC Presentation PDG Pr oc e ss Mile stone s ING – Co nc e ptua l De sig n 15% PDG ME E T • Re vie w pro je c t pro g ra m o ptio ns a nd re c o mme nda tio ns • Pro c e ss Outc o me – Dire c tio n fo r pro je c t te a m o n pro je c t pro g ra m ING – Pre limina ry De sig n 30% PDG ME E T • Re vie w pro je c t sc o pe a nd b udg e t. Do e s it suppo rt pro je c t pro g ra m? • Pro c e ss Outc o me – Dire c tio n fo r pro je c t te a m o n sc o pe a nd b udg e t ING – De sig n Pro g re ss Re vie w 75% PDG ME E T • Re vie w pro je c t de sig n pro g re ss • Pro c e ss Outc o me – Spe c ific fo c us o n re so lutio n o f prio r PDG re vie w c o mme nts a nd b udg e t/ sc o pe c o nc urre nc e ING – Ove rvie w o f Pro je c t De sig n 100% PDG ME E T • F ina l Pro je c t Re vie w • Pro c e ss Outc o me - Spe c ific fo c us o n re so lutio n o f prio r PDG re vie w c o mme nts Draft for Discussion & Policy Purposes Only 7

  8. ACEC Presentation PDG Calendar Draft for Discussion & Policy Purposes Only 8

  9. ACEC Presentation T hank You Que stions a nd Answe rs Draft for Discussion & Policy Purposes Only 9

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.