making th the rig ight ch choices
play

Making th the Rig ight Ch Choices Presentation n Tit Title - PowerPoint PPT Presentation

Making th the Rig ight Ch Choices Presentation n Tit Title Helping Customers and Partners to Design and Implement Future Ready Laboratory Co Comp mpany Prof ofile Desi signi ning ng and d Commissi ssion oning ng La Lab b since


  1. Making th the Rig ight Ch Choices Presentation n Tit Title Helping Customers and Partners to Design and Implement Future Ready Laboratory

  2. Co Comp mpany Prof ofile Desi signi ning ng and d Commissi ssion oning ng La Lab b since over er 20 year ars • Established in 1992 (Spin-off from Saybolt) • Independent company allowing selection of the optimum solution • Over 20 years Laboratory Expertise in Oil & Gas, Petrochemical and (non-)Ferrous Lab Methods, Standards and Requirements • Specialized in Engineering & Design (FEED and Detail) and Turn-key Project Realization • ISO 9001-2008 certified and commitment to HSE • Offering a total solution within one organization and a single point of contact 2

  3. Glob Gl obal Reac each Prov oven Trac ack Record of f Suc uccess DAMIETTA LNG LNG Egypt Aktobe Plant, Kazakhstan CPF Algeria Prelude F-LNG LNG Peru GPP Algeria Wheatstone & Gorgon LNG Australia BCPL Cracker & Polymer, India LNG Nigeria RRE Refinery UAE Dahej Ethylene Cracker, India Oil UAE Petrochemicals KSA LNG Oman 3

  4. Engineerin Eng ring and and De Desig ign The e Value ue Crea eation on Wh Whee eel OPERATIONAL REQUIREMENTS DETAILED END-USER/ OWNER DESIGN REQUIREMENTS CUST STOMER MER & PARTN TNER ER PR PRODUCTI TIVIT ITY HSE WORKFLOW & REQUIREMENTS FUNCTIONALITY LABORATORY REGULATIONS 4

  5. Fr From om Cus Customer Ne Needs to o Eng Engineering A prov oven en process ess to trans nsfor orm needs eds int nto o action ons Detailed Design Customer Needs/ Design Process Pro sses Foc ocus Are reas • • Problem Definition Feasibility study • • Conceptual Design Perform technical requirements • • Preliminary Design Investment cost for the project • • Detail Design Project-specific requirements and • guidelines are defined by client Design Communication Deli eliverable les Data avail ilable le du duri ring Cu Customer r • Furniture layout and Spefification Need eeds/D s/Desi sign • • Equipment and Utilities Layout Process samples not available • • Gas and Elestrical distribution Laboratory Layout is very basic • • Analyzers definitions and optimization Equipment list is estimated and very • Full operational requirements including basic • chemical and standards requirements Utilities, Power, HVAC is not available Learn Innovate Plan Create Improve 5

  6. Ope Operation onal Requ equirements Compl plete e Anal alytical Workflo flow w Solut ution ons s Methods & Instruments/ Data Reagents Software Standards Equipment Management GC Systems Separation Method Physical Properties Spectroscopy Standards Kits 6

  7. Reso esources and and As Assets Op Optim timization on Trans nsfor orm sampl ple e measu asurements s needs eds int nto o optimized ed workflo flows s Optimized ed anal alyzers s model delling g wi with h asso sociated ed chem emical al cons nsum umpt ption on and d wast ste mana nagem ement • An approach built on years of experience packaged in a program designed to store the information correlating methods<- >technology<->reagents<->SOP. • The program used by Engineering experts size and optimize the number of systems, chemical requirements and waste management. • Very exhaustive database built on constantly updated methods literature ensure compliance to laboratory tests TEST according to standard methodology: REAGEN TOTAL FREQUE TS PER CONSU NCY PER APHA, ASTM, EPA, EN, HACH, HTAS, IFP, IP, METHOS MPTION DAY ISO, SMS, UOP etc. 7

  8. Proj oject Man Management Single e Point of Contact, Fully Suited ed PROJECT SCHEDULE PROGRESS PROJECT REPORT COMPLIANCE SHEET YOU OUR R DEDICA DEDI CATE TED INSPECTION & CHANGE / ISSUE TEST PLAN MANAGEMENT PROJEC PR JECT T MAN MANAGER ER SCOPE & DOCUMENT INTERFACES CONTROL (RACI) (VPIS/VDR) PROJECT QUALITY & CONTROL PLAN 8

  9. Part artner in n La Lab As Asset Management One e Contact | One e Contrac act | Comprehe ehens nsive e | Mu Multivend ndor or A st struc uctur ured d appr proa oach to La Lab b Asset set PLAN Ma Mana nagem emen ent backed d by year ars s of DISPOSAL ACQUIRE exper ex perienc ence of a large e team am of Service ANALYTICAL EQUIPMENT Engi gineer neers Equipme ment OPTIMIZE DEPLOY LAB Lifecycle LAB AUTOMATION DEVICES Manageme ment • Continued support post lab commissioning through comprehensive repair and MASS MANAGE REPAIR SPECTROMETRY maintenance of all laboratory equipment regardless of the manufacturer. QUALIFY MAINTAIN • Resident engineer on-site as single point of contact for all service issues and mobilize necessary resources • Leverage relationship with OEMs to provide quick service as required • Use of proprietary database to track performance & service history of all laboratory assets including spare parts inventory and usage • Quick access to large inventory of common spares & consumables stocked in-country 9

  10. 400+ 400+ References Wor orldwid ide 20+ 20+ Year ars of Exper Experie ience 1250 1250 + + Item tems pe per Proje oject M&I-Labtech B.V. . Tel: +31 10 26 307 77 Tankhoofd 7-8, 3196 KE Mob: +31 6 2972 6723 Vondelingenplaat Rotterdam Mail: info@mi-labtech.com The Netherlands Web: www.mi-labtech.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend