lower middlesex water source evaluation project update
play

Lower Middlesex Water Source Evaluation Project Update March 29, - PowerPoint PPT Presentation

Lower Middlesex Water Source Evaluation Project Update March 29, 2017 AGENDA 1. Source Evaluation/Selection 2. Distribution System Layout 3. Project Scope/Project Costs/Financing Sources 4. Proposed Rates/Connection 5. Financial


  1. Lower Middlesex Water Source Evaluation Project Update March 29, 2017

  2. AGENDA 1. Source Evaluation/Selection 2. Distribution System Layout 3. Project Scope/Project Costs/Financing Sources 4. Proposed Rates/Connection 5. Financial Sustainability Curve 6. Next Steps 7. Project Schedule 8. Questions

  3. Source Evaluation/Selection • Objective: To identify high quality sources with high yields to supply lower Middlesex County • Methodology:  77 existing wells identified and incorporated into Decision Matrix  Evaluated well yields, water quality, well construction details  Identified Rosegill Wells as very favorable for use  Conducted Groundwater Modeling of the Rosegill wells – Results favorable. Met with DEQ, response favorable.  Recommended Selection of Rosegill wells as desired source

  4. Distribution System Layout • Begins at Rosegill wells • Extends to Topping • Extends to Stingray Point • 2 Storage/Pumping Facilities • Approximately 120 fire hydrants

  5. Distribution System Layout

  6. Distribution System Layout

  7. Project Scope/Project Costs/Financing Sources • Approximately 40 miles of pipeline – 12” - 2” • 2 Storage/Pumping Facilities • Estimated Project Cost - $17,442,838 • Proposed Financing VDH USDA County County $8,133,122 $7,609,716 $1,000,000 $700,000 2.75% 2.0% 2.5% (TBD) 30 years 40 years 30 years (TBD) Fire Hydrant $401,650 $278,179 $47,778 (TBD) Grant

  8. Proposed Rates/Connection Fees Vacant Lot ¾” 1” RATES: Min. Rate per Month $20.00 $45.00 $45.00 Rate/1,000 gal (Above min. of 3,000 gal) n/a $10.00 $10.00 Rate breakpoint (gal/mo.) n/a 3,000 3,000 CONNECTION FEES: Initial Connection Fee (yr. 0) $5,000 $4,000 $12,500 Secondary Connection Fee (yrs. 1+) n/a $10,000 $25,000

  9. Subscribers Needed Meter Sizes Vacant Subscribers 3/4" 1" 1 1/2" 2" 3" Lot Previous 43 421 9 1 2 0 New 40 70 9 0 2 3 New 83 491 18 1 4 3 Subscriber Base Total Subscribers 600

  10. Financial Sustainability Curve Financial Sustainability Curve (Should never be <$0) $12,000,000 $10,000,000 $8,000,000 $6,000,000 $4,000,000 $2,000,000 $0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 Project Years

  11. Next Steps • Submit Funding Application to VDH by April 1 • Submit PER to VDH & USDA • Press release(s) • Direct mailing to potential subscribers • Conduct subscriber meetings to recruit subscribers – April-June

  12. Project Schedule

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.