C limate C hange A ction P lan LGU PROFILE Distance 532 kms. South of Manila Total Land Area 20,437.10 has. Barangays 70 Barangays ( 45 / 25 ) Natl. Census 2015 196,639 population Terrain Plain to rolling to hilly Total Land Use


slide-1
SLIDE 1

Climate Change Action Plan

slide-2
SLIDE 2

LGU PROFILE

Distance

532 kms. South of Manila

Total Land Area

20,437.10 has.

Barangays

70 Barangays (45/25)

  • Natl. Census 2015

196,639 population

Terrain

Plain to rolling to hilly

Total Land Use

Agricultural

slide-3
SLIDE 3

TURNING POINT

Typhoon Reming in 2006 1,079,891 total; 204,991 families; 1,478 casualties Php1,519,411,829.00 damages in properties, agriculture & infrastructure

slide-4
SLIDE 4

PLANS

DRRM/CCAM Plan 2013-2017 CLUP & CDP 2009-2018 MTPIP 2019-2021 and AIP 2019 COMMUNITY-BASED TECHNOLOGY PARTICIPATORY EVIDENCE-BASED Other THEMATIC PLANS GENDER-SENSITIVE

slide-5
SLIDE 5

RATIONALE

Local Government Code of 1991 (RA 7160) Climate Change Act of 2009 (RA 9729) PDRRM Act of 2010 (RA 10121) People’s Survival Fund of 2012 (RA 10174) PhilippineAgenda 21 for Sustainable Dev. Sendai Framework for DRR 2015-2030 Addis Ababa Action Agenda 2015 SustainableDevelopment Goals 2015-2030 Paris ClimateChange Agreement 2015

slide-6
SLIDE 6

CLIMATE AND DISASTER RISK ASSESSMENT

Heat Stroke Coral Bleaching

Increasing Temperature

Flooding

Increasing Seasonal Rainfall

Lahar due to torrential rains Wildfires due to El Niño & Dry Days Increase in typhoon wind and intensity

Climate Extremes

  • Agri. Pests &

Diseases Hydro Met Hazards Landslide & Erosion Disease Outbreak Earthquake Hazards Fire Hazards Transport Mishaps Volcanic Hazards Sea Level Rise

slide-7
SLIDE 7

NATURAL HAZARDS

HYDRO-METEOROLOGICAL § Tropical Cyclone/Depression

  • Strong Winds
  • Flooding
  • Rain-induced Landslide
  • Storm Surge
  • Mudflow/Lahar

§ Thunderstorm & Lightning § Tornadoes (Waterspout) GEOLOGICAL § Earthquakes

  • Ground Shaking
  • Liquefaction*
  • Earthquake-induced Landslide*
  • Tsunami*

Ground Subsidence* § Volcanic Eruption

  • Pyroclastic Flow
  • Lava Flow
  • Ashfall
slide-8
SLIDE 8

MAN-MADE HAZARDS

FIRE TRANSPORT MISHAPS DISEASE OUTBREAK AGRICULTURAL PESTS & DISEASES TERRORISM

slide-9
SLIDE 9

PROJECTED CHANGES IN CLIMATE VARIABLES

TEMPERATURE 1971-2000: 26.90C 2020: 28.10C 2050: 30.30C SEASONAL RAINFALL 1971-2000: 941.3mm 2020: 1,001.5mm 2050: 951.6mm SEA LEVEL RISE 1947-2009: 0.54 m 2010-2109: 1.08 m

  • NO. OF HOT DAYS

1971-2000: 27 2020: 683 2050: 1,393

  • NO. OF DRY DAYS

1971-2000: 6,219 2020: 3,698 2050: 3,811 EXTREME DAILY RAINFALL >300mm 1971-2000: 1 day 2020: 4 days 2050: 11 days

Source: US Natl. Oceanic & Atmospheric Adm., Mean Sea Level Trend for Legazpicity, Phil.

slide-10
SLIDE 10

CLIMATE CHANGE IMPACTS

ELEMENTS AT RISK § Population § Natural-resource based production areas § Critical point facilities § Urban use areas § Infrastructure and utilities SECTORS & SUB-SECTORS (CHAWFBEEETISM)

HLURB

CDRA

DILG

VAAM CCA-DRVR

Climate Variables

(Temperature, Seasonal Rainfall, Climate Extremes, Sea Level Rise)

slide-11
SLIDE 11

IDENTIFIED DECISION AREAS

slide-12
SLIDE 12

IDENTIFIED DECISION AREAS

slide-13
SLIDE 13

IDENTIFIED DECISION AREAS

slide-14
SLIDE 14

IDENTIFIED DECISION AREAS

slide-15
SLIDE 15

IDENTIFIED DECISION AREAS

slide-16
SLIDE 16

IDENTIFIED DECISION AREAS 19 Coastal Barangays

Storm Surge, Sea Level Rise & Tsunami

25 Urban Barangays + 3 Southern Barangays

Moderate to Severe Flooding

11 Northern Barangays + 2 Urban Barangays

Moderately - Highly Prone to Lahar/Mudflow

14 Near South & Southeastern Barangays

Moderate Drought

slide-17
SLIDE 17

LOCAL CLIMATE CHANGE ACTION PLAN 2018-2020

Program/Project/Activity Responsibility Center Amount (PhP) Resiliency thru Intensive IECs on:

  • Renewable Energy
  • CC-sensitive technologies
  • Environment-friendly alternatives
  • Climate-resilient Infra Others

CMO-CDRRMD 500,000.00 Community-based Climate Change Risk Assessment, Mapping, Analysis and Monitoring

  • Establishment of Database System for

Climate Information

  • Mapping thru Geographic Information

System CMO-CDRRMD CMO-CDRRMD 2,000,000.00 1,000,000.00

slide-18
SLIDE 18

LOCAL CLIMATE CHANGE ACTION PLAN 2018-2020

Program/Project/Activity Responsibility Center Amount (PhP)

  • Climate Change Risk Assessment
  • CCAM Capacity Building & Research

Activities CMO-CDRRMD CMO-CDRRMD 1,000,000.00 500,000.00 Risk Financing Schemes

  • Fisheries, Livestock and Agriculture
  • Financing Windows for the Community

(credits, calamity loans thru rural banks, FCs, etc.)

  • IEC on Availing Risk Financing

CMO-CDRRMD/ City Agri./ City Vet. 200,000.00 3,000,000.00 50,000.00 Climate-Responsive Food Production Systems

  • Establishment of Climate Eco-Gardens
  • Upland Rice Production
  • High Value Crop Production

City Agri 1,500,000.00 1,000,000.00 1,000,000.00

slide-19
SLIDE 19

LOCAL CLIMATE CHANGE ACTION PLAN 2018-2020

Program/Project/Activity Responsibility Center Amount (PhP)

  • Livestock and Fowl Production
  • Fishery Production
  • Marine Ecosystem

City Vet City Agri

  • Int. Coastal

Resource Mgt. 1,000,000.00 1,000,000.00 1,000,000.00 Barangay River Bank Stabilization Program City Env. Office 1,600,000.00 Coastal Resource Management

  • Coral Rehabilitation and Expansion
  • Mangrove Tree Growing in Coastal

Barangays

  • Seagrass Rehabilitation and Expansion
  • Int. Coastal

Resource Mgt. 1,000,000.00 800,000.00 300,000.00 Micro-Water Shield and Water Resource Protection City Env. Office/

  • Leg. Water

District 2,500,000.00

slide-20
SLIDE 20

LOCAL CLIMATE CHANGE ACTION PLAN 2018-2020

Program/Project/Activity Responsibility Center Amount (PhP) Feasibility Study on the Establishment of Renewable Energy Farms City Env. Office 15,000,000.00 The Greening of Legazpi City Hall City Engineering/ UAP/PICE 5,000,000.00 Preservation of the City’s Natural Drains & Wetlands City Eng’g/ UAP/PICE 15,000,000.00 Establishment of Rainwater Impounding Systems in City Government Buildings & Barangays CMO- CDRRMD/CEO/ UAP/PICE 4,000,000.00 Emissions/GHG Accounting & Inventory for Entity & Community City Env. Office/ CMO-CDRRMD 1,000,000.00 Barangay Forest Carbon Project CMO-CDRRMD/ City Env. Office 2,000,000.00

slide-21
SLIDE 21

LOCAL CLIMATE CHANGE ACTION PLAN 2018-2020

Program/Project/Activity Responsibility Center Amount (PhP) Revitalization of Urban Rivers

  • Sagumayon River
  • Macabalo River
  • Yawa River

City Env. Office/ City Engineering/ UAP 20,000,000.00 30,000,000.00 Establishment of Urban Forests and Open Spaces City Engineering/ UAP/PICE 15,000,000.00 Constructionof Additional Cells for the City Sanitary Landfill City Env. Office/ City Engineering 50,000,000.00 Legazpi City Water Septage System City Env. Office/ City Engineering

slide-22
SLIDE 22

REGULATORY MEASURES & POLICIES

slide-23
SLIDE 23