~ lelio.' Figure 2 Lower Nepon se t River PCBs - - PowerPoint PPT Presentation

lelio figure 2 lower nepon se t river pcbs boston milton
SMART_READER_LITE
LIVE PREVIEW

~ lelio.' Figure 2 Lower Nepon se t River PCBs - - PowerPoint PPT Presentation

Lower Neponset River Site Boston/Milton, MA February 2020 *644037* SEMS Doc ID 644037 Topics for Discussion Introduction MassDEP Request for EPA Involvement Area of Interest National Priorities List (NPL) Overview of


slide-1
SLIDE 1

February 2020

Lower Neponset River Site Boston/Milton, MA

*644037*

SEMS Doc ID 644037

slide-2
SLIDE 2

 Introduction  MassDEP – Request for EPA Involvement  Area of Interest  National Priorities List (NPL)  Overview of Superfund Process  Timeline of Activities  Outreach

Topics for Discussion

slide-3
SLIDE 3

Figure 2 Lower Neponset River PCBs

Boston/Milton, Massachusetts

E:PARcg1on I

Superfund TedirK.al ru~

and Aespomc- Teem (ST ART) IV

Ccn,..act Na. E.P~IS-01 TOI-01.JU16-0009

.......

3April2011

......

18Ap-il 2019

LEGE:ND

Upper Ne- RM!<

M el.her Brook to Charms lioslOn & Holingsworth Dam Area

0.2 0.4 Miles

~

~

'.A."l:•.a
lelio.'

..

,
slide-4
SLIDE 4

 Extensive USGS sampling – 2002-2006  MassDEP work _ Oversight/evaluation of

various studies and remediation of Mother Brook.

 EPA

  • Limited sampling to confirm previous results

November 2017 and September 2018

  • Preliminary Assessment – August 2018
  • Site Inspection – April 2019
  • Hazard Ranking System Package - TBD

tudies/Evaluations

slide-5
SLIDE 5

PCB Concentrations in Sediment

ve

  • nly.

m Figure 10 2018 START Sediment Sample Loo,tions and T Olal PCBs (Congener) Results M ap Lower Nepooset River PCBs Boston/Milton, Massachusetts

EMAegiar,I Supt,fund Tcd1nul ~

111d

R~Tea111(START)rl Camlci No. E P.Sl.15.01

TOl-01-1 &..(Ni.((XJg

u ....

lApil017

u ....

14 F ebrwry 201!1

LEGEND

Approx. S.1e Bcuv:bry \\'alter Bater OamAtea Br~ed CNmel heJ. Slue !-WsA~Ma

Tieston &

Hclling!w:xth Dan/vu

F airmomtiMoht' B root Area

Mocher Brook 10 ChJries

l,l,pe,Nepon,et-

BelCJ11VBadgromd

8

0.25 0.5

  • Miles
lm.igiry: [SRI. ._am1, USDA F !.A. ~ Atx, GeoE:,t.Gtlmlff""l}lwo!,,d, IGP T'1JOE Ma1IPllh

AUofiff du: START,Me!GIS, Mii.XP

slide-6
SLIDE 6

 National list of sites that EPA determines

require further detailed investigation, and potential cleanup action in accordance with CERCLA*.

 Investigations at NPL sites determine whether

long-term threats to human health & environment exist.

 Where needed, comprehensive strategy to

address threats is implemented.

*CERCLA = Comprehensive Environmental Response, Compensation and Liability Act (Often referred to as Superfund)

What is the National Priorities List (N PL)?

slide-7
SLIDE 7

 Sites on NPL subject of detailed investigation,

and cleanup where warranted.

 Only sites on the NPL are eligible to receive

federal Superfund resources for comprehensive cleanup.

 Federal resources can include monetary

support, as well as expertise/staffing.

 Absent the use of federal resources,

comprehensive cleanup strategies may not be able to be pursued.

Why Add A it To NPL?

slide-8
SLIDE 8

 Sites added to NPL through federal

rulemaking.

 Requires letter of concurrence from Governor.  Site is first proposed to the NPL.  60-day public comment period.  Site finalized to NPL, upon consideration of

public comments received.

How is a it Add d to the NPL?

slide-9
SLIDE 9

The Superfund Process:

Discovery and Cleanup

for a Long- erm Site

4iht,i

::

Discover n w

  • Choo

a

nup P n. valuate site's con min · n

and determine

cl n p '/ n

de n p program.

slide-10
SLIDE 10

 Develop a Hazard Ranking System (HRS)

package.

 Propose site to NPL – Fall 2020/Winter 2021

(tentative).

 60 day public comment period.  Finalize site to NPL – 2021 (dependent on

public comments).

 Letter of concurrence from Governor – likely

Summer 2020.

Low r N pons t Riv r

Pos ibl Tim lin for NPL

slide-11
SLIDE 11

 Meetings held to date:

  • City of Boston/Town of Milton

 March 2017  April 2017 (Boston only)  Milton Conservation Commission public mtg April 2017  November 2019

  • Federal legislative delegation briefing – Dec. 2019
  • State legislative delegation briefing – Feb. 2020
  • Boston City Council member briefing – Feb. 2020

 Planned meetings:

  • EPA sponsored public informational meeting Mattapan –
  • Feb. 24, 2020
  • EPA/MassDEP presentation at Milton BOS meeting –
  • Feb. 26, 2020

Outreach

slide-12
SLIDE 12