LCRA UNMANNED AERIAL SYSTEMS SEPTEMBER 5 - 7, 2018 LCRA UAS Program Background August 2014 - Initial Business Case Submitted February 2015 Began working with FAA on gaining flight authorizations July 2015 - Purchased first


  1. LCRA UNMANNED AERIAL SYSTEMS SEPTEMBER 5 - 7, 2018

  2. LCRA UAS Program Background • August 2014 - Initial Business Case Submitted • February 2015 – Began working with FAA on gaining flight authorizations • July 2015 - Purchased first aircraft • FAA Approvals – November/December 2015: Received FAA authorization to fly 4 LCRA owned sites in central and south Texas – April 2016: Received “333 Exemption” from FAA – May 2016: Received “BLANKET COA” (Certificate Of Authorization) from FAA which gave authorization to fly throughout the United States within G airspace and under 400 feet • FAA Part 107 – Passed in June of 2016 and went into effect August of 2016 SEPTEMBER 5 - 7, 2018

  3. Business Case Outline BENEFITS : • REDUCED COST • FACILITATE RAPID RESPONSE • GREATER COVERAGE AND DETAIL • MITIGATION OF SAFETY CONCERNS (NO OUTAGES) USES: • WATER • TRANSMISSION • GENERATION • RAIL FLEET & GAS STORAGE • PUBLIC SAFETY • CORPORATE COMMUNICATIONS • PARKS & LANDS SEPTEMBER 5 - 7, 2018

  4. Types of Drones Rotary : • VARIETY OF INTERCHANGEABLE SENSORS • CLOSER, MORE DETAILED PHOTOS • MORE PRECISE MANEUVERABILITY • ZOOM CAPABLE FIXED WING: • COVERS LARGE AREAS • SMALLER/LIGHTER AIRCRAFT • LONGER FLIGHT TIMES SEPTEMBER 5 - 7, 2018

  5. Work Products 360 ° Panoramic Composition Orthophotography Transmission Line ROW Video Detailed Inspection Photography Infrared Video and Photography Telecom Towers (future) Engineering • Point Cloud data – Site Topography, Transmission Lines & Substations • Volumetric data – Coal Piles, Reservoirs, Embankment structures 5 SEPTEMBER 5 - 7, 2018

  6. 360 ° Panoramic Composition 6 SEPTEMBER 5 - 7, 2018

  7. Orthophotography 7 SEPTEMBER 5 - 7, 2018

  8. Transmission Line ROW Video 8 SEPTEMBER 5 - 7, 2018

  9. Inspection Photography 9 SEPTEMBER 5 - 7, 2018

  10. IR Photography 10 SEPTEMBER 5 - 7, 2018

  11. 3D Models Camera Point Cloud Aspect 11 SEPTEMBER 5 - 7, 2018

  12. Engineering Applications SEPTEMBER 5 - 7, 2018 12

  13. 360 ° Panoramic Composition 13 SEPTEMBER 5 - 7, 2018

  14. 14 SEPTEMBER 5 - 7, 2018

  15. IR Photography 15 SEPTEMBER 5 - 7, 2018

  16. IR Photography 16 SEPTEMBER 5 - 7, 2018

  17. IR Photography 17 SEPTEMBER 5 - 7, 2018

  18. IR Photography 18 SEPTEMBER 5 - 7, 2018

  19. Telecom Structure 19 SEPTEMBER 5 - 7, 2018

  20. Telecom Structure 20 SEPTEMBER 5 - 7, 2018

  21. Structure Inspections 21 SEPTEMBER 5 - 7, 2018

  22. Structure Inspections 22 SEPTEMBER 5 - 7, 2018

  23. Line Inspections 23 SEPTEMBER 5 - 7, 2018

  24. Full Scale Testing of New Designs 24 SEPTEMBER 5 - 7, 2018

  25. Access Road Inspections 25 SEPTEMBER 5 - 7, 2018

  26. 3D Models 26 SEPTEMBER 5 - 7, 2018

  27. CONCLUSION • Uses for all business lines • Increased efficiency • Safety • Failure mitigation SEPTEMBER 5 - 7, 2018 27

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.