L ADOW ONGME P ARKWAY V AL UE E RING NGINE E S T UDY VE Summa ry - - PowerPoint PPT Presentation
L ADOW ONGME P ARKWAY V AL UE E RING NGINE E S T UDY VE Summa ry - - PowerPoint PPT Presentation
L ADOW ONGME P ARKWAY V AL UE E RING NGINE E S T UDY VE Summa ry Purpo se T o e nsure b e st va lue fo r the pro je c t Pro je c ts o ve r $50 millio n Va lue E ng ine e ring E va lua te s e ng ine e ring in re g a
Va lue E
ng ine e ring
E
va lua te s e ng ine e ring in re g a rds to func tio n o f a pro duc t o r se rvic e
Ge ne ra te s a lte rna tive s thro ug h the use o f c re a tive thinking I
s c o nduc te d b e twe e n Pha se I a nd Pha se I I
Re sults in c o st sa ving s a nd b e tte r va lue
VE Summa ry
VE
Wo rksho p
I
de a g e ne ra tio n - 126
Co nc e pts re vie we d & de ve lo pe d furthe r I
de a s Mo ving fo rwa rd - 23 VE wo rksho p Co mme nts b y K DOT a nd Pha se I I De sig ne rs Co mme nts b y I DOT F ina l De c isio ns
Purpo se T
- e nsure b e st va lue fo r the pro je c t
Pro je c ts o ve r $50 millio n
Pha se I
E ng ine e ring prima ry a re a s o f po te ntia l sa ving s:
Struc ture o ve r F
- x Rive r
Pa ve me nt De sig n E
a rthwo rk
Dra ina g e De sig n
VE Summa ry (c o nt.)
- Phase I Engineering Estimates
Re c o nfig ure Spa n & Supe rstruc ture
Phase I De sign: 8-span str uc tur al ste e l
E
va lua te d 5 Alte rna te De sig ns
4-spa n o ve r F
- x Rive r
Hig h Pe rfo rma nc e Co nc re te (HPC) /
Hig h F ric tio n De c k / Anti-ic ing de c k
T
wo b ridg e s se pa ra te d b y 150’ MSE Wa ll
4-la ne s
We a the ring Ste e l
Phase I De sign: Painte d ste e l gir de r s
E
limina te s initia l pa int c o st
Re duc e s life c yc le c o st - no
re -painting
Ble nds into e nviro nme nt
We a the ring Ste e l: sta b le ma te ria l tha t
g ive s a rustic a ppe a ra nc e whe n e xpo se d to we a the ring e le me nts
Ope n Pie r T ype
Phase I De sign: So lid wall pie r s
Ope n pie r, multi-c o lumn,
ha mme rhe a d c o nfig ura tio n
Re duc e s c o st o f ma te ria l
a nd ma inte na nc e
Mo re a e sthe tic a lly ple a sing
F
- ur F
- o t Wide Ra ise d Me dia n o n Bridg e
Phase I De sign: E ight fo o t wide r aise d me dian
Re duc e me dia n width b y fo ur
fe e t
De c re a se s width o f e ntire b ridg e De c re a se s b ridg e c o st
Bridg e Pro file Adjustme nt
Phase I De sign: L ar ge c uts thr u bluffs o n e ast and we st o f F
- x Rive r
E
va lua te pro file a lte rna tive s to minimize c uts
Sig nific a ntly re duc e s e a rthwo rk c ut
11 F
- o t Wide L
a ne s
Phase I De sign: 12 fo o t wide lane s
11 fo o t la ne s o n
L
- ng me a do w a nd side
ro a ds
Re duc e o ve ra ll c ro ss se c tio n Re duc e pa ve me nt a nd
e a rthwo rk c o sts
4 la ne s – Ra nda ll to I
L 62
Gra de Se pa ra tio n a t I L 31
Phase I De sign: Co nve ntio nal at-gr ade
I
mpro ve inte rse c tio n c a pa c ity
Be tte r e a rthwo rk b a la nc e I
mpro ve dra ina g e func tio n
Avo id histo ric pro pe rty
E a rth E xc a va tio n
Phase I De sign: No t dir e c tly addr e sse d
Ra g ing Buffa lo Sno wb o a rd/ Ski Pa rk K
DOT a nd K CF P mutua l b e ne fit
Re duc e s ha ul-o ff e xpe nse s Re duc e s truc k tra ffic o n I
L 31
Ope n Ditc h Dra ina g e
Co nve rt a po rtio n o f c lo se d dra ina g e
to o pe n ditc h
Re ta in c urb a nd g utte r to c o lle c t
wa te r a nd o utle t dire c tly into ditc h
E
limina te s a n e stima te d 8,000 L F
- f
sto rm se we r
E a rth Be rms
Use e xc e ss fill fo r b e rms whe re a b le
Re duc e s ha ul-o ff c o sts Se pa ra te s ro a d fro m a dja c e nt
pro pe rtie s
Co st Bre a kdo wn
Se c tio n A – Huntle y/ Bo ye r Ro a d thro ug h Ra nda ll Ro a d
$11 Million Se c tio n B – Ra nda ll Ro a d thro ug h I
llino is Ro ute 31
$29 Million Se c tio n C – I
llino is Ro ute 31 thro ug h I llino is Ro ute 25
$48 Million Se c tio n D – I
llino is Ro ute 25 thro ug h I llino is Ro ute 62
$9 Million