Kiski Area High School
Allegheny Township, PA
Sarah Haynes Architectural Engineering – CM Option Spring 2004
Kiski Area High School Allegheny Township, PA Sarah Haynes - - PowerPoint PPT Presentation
Kiski Area High School Allegheny Township, PA Sarah Haynes Architectural Engineering CM Option Spring 2004 Kiski Area High School Allegheny Township, PA Presentation Outline Introduction Project I. Project Information
Sarah Haynes Architectural Engineering – CM Option Spring 2004
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Board of Directors Architect: Canzian / Johnston & Associates General Contractor: P.J. Dick Structural Engineer: Watson Engineering Mechanical Engineer: Ray Engineering Plumbing Engineer: Pedicone Engineering Consultants Electrical Engineer: Starr Engineering Geotechnical/ Civil: Ackenheil Engineers Project Team:
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Location: Allegheny Township, Westmoreland Co. Dates of Construction: April 2003 – April 2005 Size:
Cost Information: Lump Sum Cost - $39.7 million Project Delivery Method: Design-Bid-Build w/ Single Prime Contract Project Overview:
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Project Description:
Bldg ‘C’ Bldg ‘B’ Bldg ‘A’ Bldg ‘J’ Bldg ‘E’ Bldg ‘F’ Bldg ‘G’ Bldg ‘H’ Bldg ‘D’ Bldg ‘K’
Renovations and additions to eight (8) existing buildings Demolition of one (1) existing building
Bldg ‘N’
Construct Building ‘N’ & Building ‘K’
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Project Description: Building ‘N’
Building ‘K’
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Existing Floor System: Structural steel frame 3” slab on 3” metal deck
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Goals: Decrease schedule Decrease cost
Proposed Floor System: Structural Steel Frame 8” Prestressed Concrete Plank (2” C.I.P. Topping)
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Site Layout & Access:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Confined site Erection Sequence
Sarah Haynes
Original Schedule:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Proposed Schedule: Additional 12 days to erect 15 days to erect steel – 30 days to detail 50 days total for slab pours and steel erection
Sarah Haynes
Costs:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
$42,405 $54,893 Total $35,873 $37,043 Steel $6,532 $17,850 Floor Slab Slab Prestressed Plank Total Costs
Sarah Haynes
Recommendation:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Site Layout Schedule Cost
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Existing Mechanical System: Two (2) gas-fired Boilers Total of 23 AHU’s serve Building ‘N’ AHU-4N – Largest airflow Services approx. 9,400 SF Services offices, conference rooms, etc.
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Goal: Decrease energy costs
Proposed Mechanical System: Enthalpy wheel Benefits:
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Energy Savings:
Sarah Haynes
Costs: Initial Cost: Cost Savings: Annual Maintenance Costs: $1800 /yr Lifecycle Cost (20yr, 5%): $41,930
Payback Period:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Total: 986 M BTU’s or 961 Mcf
Recommendation:
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Energy Savings Payback Period
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Introduction: Idea was suggested at PACE Roundtable
Sarah Haynes
Relevant to many projects
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Methodology:
Sarah Haynes
Developed survey Sent to design professionals within the Pittsburgh and Virginia-DC area
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Results:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Results: Asked to rank their experience working with Contractors, 1 = Bad, 10 = Good
MAX.
MIN.
MEDIAN
AVERAGE OVERALL CONSTRUCTION PRECONSTRUCTION
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Results:
POSITIVE DESCRIPTORS of EXPERIENCES with CONTRACTORS Team Perspective Helps Solve Problems Good Craftsmanship Good Project Management Pride and Ownership
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Sarah Haynes
Results:
NEGATIVE DESCRIPTORS of EXPERIENCES with CONTRACTORS
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Not a Team Player Lack of Scheduling Skills Poor Quality Craftsmanship Unfair Monetary CO’s Create Adversarial Relationships
Typical Problems Encountered when Working with Contractors
5 10 15 20 25
Un-specified Materials Lack of Communication Profit Driven Non-responsive Defer Issues Unappreciative of Design Unethical Act as Designers Unavailable Domineering Types of Problems Percentage of Responses
Sarah Haynes
Results:
LEED Bldg
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Technology
PROFIT DRIVEN COMMUNICATION UNSPECIFIED MATERIALS
Cheapen Project
1 2 3 4 5 6 7 8 9 Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership
Traits Responses
Construction Project Manager Individual in Field Supervision
Sarah Haynes
Results:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
COMMUNICATION KNOWLEDGEABLE ETHICAL COOPERATIVE PERSONABLE
Best Personal Traits of a CONSTRUCTION PROJECT MANAGER
1 2 3 4 5 6 7 8 9 Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership
Traits Responses
Design-Builders Independent Designers
Sarah Haynes
Results:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
COMMUNICATION ETHICAL LEADERSHIP COOPERATIVE KNOWLEDGEABLE
Best Personal Traits of an Individual in FIELD SUPERVISION
1 2 3 4 5 6 7 8 9
Communicative Personable Cooperative Knowledgeable Prompt Ethical Organized Leadership
Traits Responses
Design-Builders Independent Designers
Sarah Haynes
Results:
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
COMMUNICATION ETHICAL LEADERSHIP
Sarah Haynes
Results:
BEST ATTRIBUTES of a CONSTRUCTION COMPANY
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Open/Honest Communication Ethical Responsibility Client Focused/Works well with Owner Works with Architect Knowledgeable
Sarah Haynes
Results:
CRITICAL AREAS for CONTRACTOR IMPROVEMENT
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Team Perspective Open/Honest Communication Scheduling Problem Solving Managing
Conclusions: Team Perspective Open/Honest Communication Ethical Responsibility
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Conclusions: Floor System Analysis
Mechanical Analysis
Research
Sarah Haynes
Introduction Project Information Floor System Analysis Mechanical Analysis Research Conclusions
Kiski Area School District Canzian / Johnston & Associates P.J. Dick AE Faculty
Sarah Haynes
Friends and Classmates
Sarah Haynes