Kiel Area School District High School Field Review
October 23, 2017 School Board Meeting Presentation – PowerPoint
years at around $75K to $100K
12 hours
Replacement of entire field with seeded grass Stripped and adding new soil Grading work and top soil feathering to enhance drainage
Grass would be removed and field turf would be installed
Field Type Initial Investment 5 year 10 year** 15 year Total* A) Grass “ SQ” $25,000 $100,000 $100,000 $100,000 $325K B) Grass “ OH” $430,000 $25,000 $25,000 $25,000 $505K C) Synthetic $875,000 $0 $0 $0 $875K
*Does not include annual maintenance (water, mowing/repairs, striping, fertilization etc.) **$425,000-$450,000 is the estimated cost to replace synthetic field turf. May be covered by Boosters.
High School
A.
Grass – “ Status Quo” at Field
15 year Cost Estimate: $325,000 at High School
Pros: Lowest cost Cons: Does not resolve primary issues with High School field
B.
Grass – Overhaul of High School to Bring to Standards
15 year Cost Estimate: $505,000 at High School
Pros: Overhaul approach is likely to reduce recurring High School costs Cons: Does not resolve increased cost of maintenance
Does not resolve accessibility/utilization concerns
15 year Cost Estimate: $875,000 per field
Benefits: Increased accessibility/utilization & reduced annual costs Cons: Highest cost
Approval October Bid November Prep Work Strip Field November Construction April-May Ready for use August- October
Approval December Bid December- January Construction May/June – August Ready for use August
Grass Field - Overhaul Synthetic Turf
Weather Dependent Key Deadline Possible impact to spring sports
Kiel Area School District High School Field Review
Maintenance Costs
Synthetic Turf Field Maintenance - Estimate of Labor Hours SEASON ACTIVITY FREQUENCY/WHEN TIME (hours) # of Actions Total Hours Cumulative Hours Spring Pick litter off field Once 2 1 2 2 Roll magnet across field Once 2.5 1 2.5 4.5 Pick field with sweeper in two di Once 3 1 3 7.5 Rake field with times Once 2 1 2 9.5 During Playing Season Broom field Once a week (Mid April-Mid Nov 30 weeks) 1.5 30 45 54.5 Roll magnet Every 2 weeks 2.5 15 37.5 92 Pick up litter As needed 1 5 5 97 Autumn Rake field with tines Halfway through football season 2 1 2 99 Pick field with sweeper After leaves drop 2 1 2 101 End of Season Pick field with sweeper Once 2 1 2 103 Total Hours 103 Say 100 $75/hour 7,500.00 $ Assume natural turf field maintenance is 400% of synthetic turf 30,000.00 $
Kiel Area School District High School Field Review
Capital Cost Estimate
Kiel Area School District
Stadium-Based Outdoor Education/Competition Facilities Evaluation Synthetic Turf vs. Natural Turf - Cost per Use Hour Estimate - High School
October 23, 2017
Natural Turf
$482,000.00 $50,000.00 $300,000.00 $832,000.00 $83,200.00 132 $630.30 Annual Use Hours Cost per Use Hour
Capital Upgrades
(year 5 - Natural Turf only)
Item Description Capital Cost Year 1 10 Year Maintenance Cost
($7.5k/yr Synthetic; $30k/year Natural)
Total 10 year Cost Annual Cost
Synthetic Turf
$1,200,000.00 $398,000.00 $75,000.00 $1,673,000.00 $167,300.00 1637 $102.20
Natural Turf; assume double current usage of approximately 66 hours annually Synthetic Turf; assume average of 6 hours per school Natural Turf; $25K capital upgrade in years 5 and 10 Synthetic Turf; $398,000 turf replacement in year 10
Synthetic Turf includes shock pad
and alternate infill day for 180 day school calendar plus 20 hours per week community use / rentals for 12 weeks in summer and alternate infill