K e e g a n L a ndfill T e c hnic a l Upda te NJSE A Bo a rd Me e ting June 20, 2019 1 Summa ry o f Wo rk Upda te 2 Ma y 8 Mo nito ring Sta tio n Ope ra tio n Ma y 23 Sub mit Air a nd SW Pe rmit Applic a tio ns I nc


  1. K e e g a n L a ndfill T e c hnic a l Upda te NJSE A Bo a rd Me e ting June 20, 2019 1

  2. Summa ry o f Wo rk Upda te 2

  3. • Ma y 8 – Mo nito ring Sta tio n Ope ra tio n • Ma y 23 – Sub mit Air a nd SW Pe rmit Applic a tio ns • I nc lude s GCCS De sig n Dra wing s • Sub mit re spo nse to NJDE P c o mme nts • Ma y 31 – Air • June 11 –SW • June 17 – SW • Ma y 29 – Sub mit E missio ns E stima te s pe r ACO • Ma y 31 – Sub mit ACO Pro g re ss Re po rt • June 18 – Re so lutio n fo r Co nstruc tio n Co ntra c to r

  4. Co nstruc tio n Sc he dule 4

  5. GCCS Co nstruc tio n Sc he dule Activity Approximate Duration Mobilization Week of June 24 Trench Excavation 8 ‐ 10 weeks VerticalWell Drilling 2 weeks Flare Skid Installation 5 days System startup 2 days • Full ‐ time operation of GCCS expected by end of September 2019 • Ahead of ACO schedule to submit proposal by September 30, if requested 5

  6. a ndfill Ga s Co lle c tio n a nd Co ntro l Syste m L 6

  7. Ga s Co lle c tio n a nd Co ntro l (GCCS) Syste m • Ve rtic a l g a s e xtra c tio n we lls • Drille d into wa ste ma ss • Ho rizo nta l c o lle c to rs • HDPE la te ra ls a nd he a de rs • Blo we r to e xtra c t g a s fro m the we lls • F la re to c o mb ust c o lle c te d g a s • Go a l: Ma ximize L F G c o lle c tio n to re duc e o do rs 7

  8. 8

  9. ISSUED FOR PERMITTING 5/31/2019 SCS ENGINEERS SITE PLAN 1 STEARNS, CONRAD AND SCHMIDT NEW JERSEY SPORTS CONSULTING ENGINEERS, INC. & EXHIBITION AUTHORITY PH. (845) 357-1510 FAX. (845) 357-1049 1 DE KORTE PARK PLAZA, POB 640 2019 LFG COLLECTION SYSTEM LYNDHURST, NJ 07071 KEEGAN LANDFILL 4

  10. K e e g a n L a ndfill GCCS • 28 Ve rtic a l Ga s E xtra c tio n We lls -1,140 ve rtic a l fe e t • 6 ho rizo nta l c o lle c to rs • Ab o ut o ne mile o f ma in he a de r pipe • Ab o ut ¾ mile o f la te ra l pipe • Va lve s fo r iso la tio n • 5 c o nde nsa te dra ins • 1 skid-mo unte d utility fla re 10

  11. Ve rtic a l E xtra c tio n We lls De sig n Pa ra me te rs • We ll De pth 40 to 50 fe e t • Bo re ho le s 36” dia me te r • Ca sing is PVC • Bo tto m slo tte d - sta rt 20-30 fe e t b e lo w g ro und surfa c e • T ypic a l “ra dius o f influe nc e ” – 100 fe e t • ~200 fo o t spa c ing o n la ndfill

  12. Vertical Well Drilling 12

  13. 13 Extraction Well Installation

  14. 14 Extraction Well Installation

  15. 15 Wellhead

  16. Ho rizo nta l Co lle c to rs De sig n Pa ra me te rs • I nsta lle d o n fla t pla te a u o f la ndfill • Pe rfo ra te d pipe in a g ra ve l tre nc h • 6-inc h HDPEpipe • Dra in pits a t lo w po ints • So lid pipe to o utside slo pe s to pre ve nt a ir intrusio n

  17. L F G Co lle c tio n Piping • Pa thwa y fo r L F G fro m we llhe a ds to b lo we rs • Pipe ma te ria l: HDPE • Size d fo r ve lo c ity a nd pre ssure dro p • De sig n inte nt is to ha ve mo re va c uum tha n ne c e ssa ry a t a ll we lls. We llhe a d va lve is a djuste d to re duc e va c uum to ne e de d le ve l • Pipe slo pe d to pro mo te c o nde nsa te dra ina g e

  18. re nc hing T

  19. re nc h Pipe Pla c e me nt in T

  20. Co nde nsa te Ma na g e me nt • L F G is sa tura te d with wa te r. • As L F G c o o ls, wa te r c o nde nse s • T e mpe ra ture dro p is a ffe c te d b y pipe le ng th, wind, flo w ra te a nd whe the r piping is a b o ve o r b e lo w g ra de . • Qua ntity o f c o nde nsa te pro duc e d is a func tio n o f flo w ra te a nd te mpe ra ture diffe re ntia l

  21. Skid-Mo unte d Blo we r/ F la re • 15-hp b lo we r with 500 sc fm c a pa c ity • 6-inc h utility fla re with 750 sc fm c a pa c ity • 24-inc h dia me te r mo isture se pa ra to r • Auto ma tic shut-o ff va lve • F lo w me te r with c ha rt re c o rde r a nd re mo te mo nito ring • Pilo t fla me a sse mb ly a nd ig nito r • Co ntro l pa ne l fo r a uto ma tic o pe ra tio n 21

  22. 22

  23. Odo r Co ntro l Pla n 23

  24. During Co nstruc tio n • Minimize o pe n tre nc h • No o pe n b o re ho le s, tre nc he s o ve rnig ht • Odo ro us wa ste fro m drilling / tre nc hing dire c tly o nto truc ks • Sto c kpile d c o ve r ma te ria ls to c o ve r o do ro us wa ste • Mo nito ring sta tio ns a c tive during c o nstruc tio n • Odo r ne utra lizing a g e nt dire c t a pplie d • I nspe c tio n o f a ll disruptio n a c tivitie s 24

  25. Odo r Ne utra lizing Ag e nt • Ne utra le ne b y Air Ca re • Ab so rb e nt filte r • Suppre ssio n o f dust, pa rtic le s • Sa lt tha t a c ts a s so lve nt a nd surfa c ta nt • NOTa ma sking a g e nt • Use d a t Mo nmo uth Co unty a nd o the r NJ L a ndfills 25

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.