Surfa c e Wa te r De sig n Ma nua l Upda te Pla nning Co mmissio - - PowerPoint PPT Presentation

surfa c e wa te r de sig n ma nua l upda te
SMART_READER_LITE
LIVE PREVIEW

Surfa c e Wa te r De sig n Ma nua l Upda te Pla nning Co mmissio - - PowerPoint PPT Presentation

Surfa c e Wa te r De sig n Ma nua l Upda te Pla nning Co mmissio n July 7, 2016 T o nig ht s Ag e nda NPDE S Pe rmit Re q uire me nts Surfa c e Wa te r De sig n Ma nua l Optio ns Upda te Sa mma mish Adde ndum Sta ff Re


slide-1
SLIDE 1

Surfa c e Wa te r De sig n Ma nua l Upda te

Pla nning Co mmissio n July 7, 2016

slide-2
SLIDE 2

T

  • nig ht’ s Ag e nda

 NPDE

S Pe rmit Re q uire me nts

 Surfa c e Wa te r De sig n Ma nua l Optio ns

 Upda te Sa mma mish Adde ndum  Sta ff Re c o mme nda tio ns

 Curre nt Dra ina g e Re q uire me nts  F

uture Pro je c t I mpa c ts

 E

xa mple s o f Pro je c ts I mpa c ts

 Ve sting  Outre a c h a nd E

duc a tio n

 Sc he dule

slide-3
SLIDE 3

NPDE S Pe rmit

 Ma nda te d b y the De pa rtme nt o f

E c o lo g y

 Ne w sta nda rds fo r c o ntro lling

runo ff

 L

  • w I

mpa c t De ve lo pme nt

 Prio rity list o f L

I D BMPs must b e imple me nte d

slide-4
SLIDE 4

NPDE S Pe rmit Re q uire me nts

 Curre nt de sig n ma nua ls do no t c o mply with 2013-2018 pe rmit

 Re visio n Re q uire d  Must b e e q uiva le nt to 2012 Sto rmwate r Manag e me nt Manual fo r We ste rn

Washing to n (E c o lo g y Ma nua l)

 Adoption by De c e mbe r 31, 2016

slide-5
SLIDE 5

Surfa c e Wa te r De sig n Ma nua l Optio ns

  • 1. Ado pt 2016 King Co unty Surfac e Wate r

De sig n Manual (2016 K CSWDM)

  • 2. Ado pt 2012 Sto rmwate r Manag e me nt

Manual fo r We ste rn Washing to n (E c o lo g y Manual)

  • 3. Autho r a nd a do pt a Sa mma mish spe c ific

Sto rmwa te r De sig n Ma nua l

slide-6
SLIDE 6

De sig n Ma nua l Co mpa riso n

2016 KCSWDM 2012 E c ology Manual Ne w Sammamish Manual

E c o lo g y a ppro ve d E xte nsive pub lic invo lve me nt pro c e ss Co nsiste nc y in a ppro a c h b e twe e n c urre nt Sa mma mish a do pte d ma nua l (2009 K CSWDM) Sta ff a nd de ve lo pe r fa milia rity with Co re Re q uire me nts De ta ile d de sig n g uida nc e T e c hnic a l/ inte rpre ta tio n/ tra ining suppo rt F e a sib ility o f me e ting pe rmit a do ptio n de a dline o f De c 31, 2016

slide-7
SLIDE 7

Sa mma mish Adde ndum

 Simila r to c urre nt Sa mma mish Surfa c e Wa te r De sig n Ma nua l Adde ndum

 Sta te s re le va nt SMC se c tio ns  Re fe rs to a ppro pria te de pa rtme nts  I

nc lude s Sa mma mish-spe c ific inte rpre ta tio ns o f:

 De finitio ns  E

xe mptio ns

 Ge ne ra l unde rsta nding

 Will inc lude Sa mma mish flo w c o ntro l a nd wa te r q ua lity ma ps  Re q uire multi-func tio na l sto rmwa te r fa c ilitie s

slide-8
SLIDE 8

Sta ff Re c o mme nda tio ns

 Ado pt the 2016 K

CSWDM with upda te d Sa mma mish Adde ndum a nd SMC T itle 13

 F

uture wo rk ma y inc lude :

 Cre a te Critic a l Dra ina g e Are a s to

inc lude I ng le wo o d, T a ma ra c k, a nd/ o r o the r a re a s

 Additio na l pub lic a nd sta ke ho lde r

e duc a tio n a nd invo lve me nt

 Re vise a nd distrib ute te c hnic a l

a nd g e ne ra l e duc a tio na l ma te ria l a b o ut c ha ng e s

slide-9
SLIDE 9

Curre nt Dra ina g e Re q uire me nts

 Dra ina g e re vie w re q uire d whe n

 Cre a ting mo re tha n 2,000 sf o f ne w plus re pla c e d impe rvio us surfa c e  500 sf o f ne w plus re pla c e d impe rvio us surfa c e within I

ng le wo o d Histo ric a l Pla t

 Use 1998 K

CSWDM

 Pro je c ts disturb ing le ss tha n 1 a c re  No t within e ro sio n ha za rd ne a r se nsitive wa te r b o dy o ve rla y

 Use 2009 K

CSWDM

 Pro je c ts disturb ing 1 a c re o r mo re

slide-10
SLIDE 10

K e y Cha ng e s to Re q uire me nts

 2016 K

CSWDM

L

I D no w re q uire d to the ma ximum e xte nt fe a sib le

Re q uire s tie re d a ppro a c h to a sse ssing fe a sib ility o f L

I D type s

‘ Ca fe te ria me nu’ a ppro a c h to L

I D imple me nta tio n

Ma y re q uire fo rma l flo w c o ntro ls o r wa te r q ua lity

fa c ilitie s

slide-11
SLIDE 11

K e y Cha ng e s to Re q uire me nts c o nt.

 2016 K

CSWDM

Stre a mline d dra ina g e re vie w fo r sma ll pro je c ts Pro vide s le ss c re dit in mo de ling g ive fo r L

I D

All tra nspo rta tio n pro je c ts no w re q uire d to use L

I D

F

a c ility De sig n re q uire me nts a nd la ndslide pre c a utio ns upda te d

slide-12
SLIDE 12

Pro je c t I mpa c ts

 I

nc re a se in c o st a nd c o mple xity, e spe c ia lly fo r me dium-size d pro je c ts

 Additio na l do c ume nta tio n a nd

re vie w re q uire d

 L

I D re q uire d fo r rig ht-o f-wa y pro je c ts

 Ne w ma inte na nc e pe rfo rma nc e

sta nda rds fo r L I D BMPs

slide-13
SLIDE 13

E xa mple o f Sing le F a mily I n-fill

De ve lo pme nt I mpac ts

 Bac kgr

  • und

 T

e a r do wn & re b uild

 E

xisting 9,600 sf lo t

 R4 Zo ning  Curre nt ho me :1,900 sf  No c ritic a l a re a s  Ne w ho me : 2,500 sf

 600 sf ne w impe rvio us  1900 sf re pla c e d imp. Surf.

 1998 KCSWDM

 Sma ll Site Dra ina g e Re vie w

 2016 KCSWDM

 Simplifie d Dra ina g e Re vie w

slide-14
SLIDE 14

E xa mple o f 2 L

  • t Sho rt Pla t

De ve lo pme nt I mpac ts

 Bac kgr

  • und

 E

xisting 16,000 sf lo t

 R6 Zo ning  Sub divide : two 8,000 sf lo ts  No c ritic a l a re a s, No ROW, a nd

fro nta g e impro ve me nts

 E

xisting ho me : 3000 sf

 E

xisting drive wa y: 500 sf

slide-15
SLIDE 15

2 L

  • t Sho rt Pla t (CONT

I NUE D)

 De ve lope d Conditions

 Assume 4,000 sf impe rvio us surfa c e (e a c h lo t)  F

  • r sho rt pla t

 4,500 sf ne w impe rvio us  3,500 sf re pla c e d impe rvio us  8,000 sf ne w plus re pla c e d impe rvio us surfa c e  1,000 sf ne w plus re pla c e d po llutio n g e ne ra ting

impe rvio us

slide-16
SLIDE 16

2 L

  • t Sho rt Pla t (CONT

I NUE D)

 1998 KCSWDM

 Sma ll Site Dra ina g e Re vie w  No de te ntio n o r wa te r q ua lity fa c ility re q uire d  F

lo w c o ntro l BMPs re q uire d suc h a s dry we lls o r spla sh b lo c ks

 2016 KCSWDM

 F

ull Dra ina g e Re vie w

 De te ntio n a nd/ o r wa te r q ua lity fa c ility ma y b e re q uire d  L

I D BMPs re q uire d fo r a ll impe rvio us surfa c e s 8000 sf

slide-17
SLIDE 17

E xa mple o f Sub divisio n Pro je c t

De ve lo pme nt I mpac ts

 Bac kgr

  • und

 K

a mpp De ve lo pme nt

 T

  • ta l pa rc e l a re a : 31.2 a c re s

 R6 Zo ning  Site c o nta ins

 We tla nd  E

ro sio n ha za rd

 L

a ndslide ha za rd

 No c ritic a l a q uife r re c ha rg e a re a s

 De ve lope d Conditions

 Pro je c t pro po se d 121 lo ts  Re vie we d unde r 2009 K

CSWDM

slide-18
SLIDE 18

Sub divisio n Pro je c t (CONT

I NUE D)

 2009 KCSWDM

 F

ull Dra ina g e Re vie w

 De te ntio n a nd wa te r q ua lity fa c ilitie s

c o nstruc te d

 I

mpe rvio us surfa c e s fro m 10% o f e a c h lo t re q uire d to use L I D BMPs

 E

ng ine e r a nd De ve lo pe r c ho se to re duc e impe rvio us surfa c e s to me e t L I D re q uire me nts

 2016 KCSWDM

 F

ull Dra ina g e Re vie w

 De te ntio n a nd wa te r q ua lity fa c ilitie s a re still

re q uire d

 L

I D BMPs a re re q uire d fo r a ll ne w a nd re pla c e d impe rvio us surfa c e s (inc luding ROW)

 Re duc e d impe rvio us surfa c e o nly a llo we d

whe n a ll o the r L I D BMPs a re sho wn infe a sib le

slide-19
SLIDE 19

Ve sting

 Da te s se t b y NPDE

S pe rmit a nd no n ne g o tia b le

 2009 K

CSWDM o r 1998 K CSWDM

 Applic a tio ns de e me d c o mple te d

b e fo re De c e mbe r 31, 2016

 2016 K

CSWDM

 Applic a tio ns de e me d c o mple te d

  • n o r a fte r Ja nua ry 1, 2017

 Applic a tio ns de e me d c o mple te

prio r to Ja nua ry 1, 2017 tha t ha ve “ not sta rte d c onstruc tion” b y

Ja nua ry 1, 2022

slide-20
SLIDE 20

Outre a c h a nd E duc a tio n

 Co o rdina tio n a nd pub lic o utre a c h to info rm a nd g e t input fro m

 E

le c te d o ffic ia ls

 De ve lo pme nt c o mmunity  Co nsulta nts  Pub lic  City sta ff

 Ope n Ho use  Sta ke ho lde r Me e ting s (2)

slide-21
SLIDE 21

Sc he dule

Sta ff intro duc tio n to Pla nning Co mmissio n

July 7, 2016

Sta ff me e ting with individua l Co unc il me mb e rs

July 15, 18, 19, 2016

Pub lic Ope n Ho use

July 27, 2016

Sta ke ho lde rs Me e ting s (2)

August and Se pt 2016

PC Pub lic He a ring / De lib e ra tio n

Se pte mbe r 1, 2016

PC Ha ndo ff to City Co unc il

Nove mbe r 1, 2016

City Co unc il Disc ussio n

Nove mbe r 8, 2016

City Co unc il F irst Re a ding

Nove mbe r 15, 2016

City Co unc il Se c o nd Re a ding a nd Ado ptio n

De c e mbe r 6, 2016

slide-22
SLIDE 22

Que stio ns?