June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - - PowerPoint PPT Presentation

june 2018 july 2018 july 2018 july 2018 july 2018 august
SMART_READER_LITE
LIVE PREVIEW

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - - PowerPoint PPT Presentation

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 August 2018 September 2018 Electr ectric V c Vehicle C Chargi ging g Stati tations We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8


slide-1
SLIDE 1
slide-2
SLIDE 2

June 2018 July 2018

slide-3
SLIDE 3

July 2018

slide-4
SLIDE 4

July 2018

slide-5
SLIDE 5

July 2018

slide-6
SLIDE 6

August 2018

slide-7
SLIDE 7

August 2018

slide-8
SLIDE 8
slide-9
SLIDE 9

September 2018

slide-10
SLIDE 10

Electr ectric V c Vehicle C Chargi ging g Stati tations

  • We currently have 4 duel ChargePoint CT4000

charging stations with ports to charge 8 Electric Vehicles at one time.

  • Each station has a color LCD display with an

instructional video on how to use the station.

  • Multi-language: English, Spanish and French
  • Touch button interface works in rain, snow and

with gloves.

slide-11
SLIDE 11

Elect Electric ic V Vehicl ehicle Cha Chargin ing Stations s

  • Each station has two standard Level

2 charging ports with locking holsters.

  • Each port provides that can

charge any Electric Vehicle.

  • Each port is equipped with a 23ft

charging cord to increase the usability of our charging spots.

  • Charging stations are available

24/7.

7.2 kW

slide-12
SLIDE 12

November 2018

slide-13
SLIDE 13

DPUC/PUC LEAD BY EXAMPLE

  • October 2

2012 – New ew en ener ergy-effic icie ient nt HVAC S System i installe lled

  • May 2

y 2013 – Purcha hased 2 2013 T Toyo yota Camry a y and nd T Toyo yota H Hig ighland nder ( (hyb hybrid ve vehic hicles)

  • December 2

2015 – En Energy-effic icie ient nt L LED lighting ing

  • Nove

vember 2 2016 – 2 dual l Ele lectric V Vehic hicle Cha harging ng S Stations ns

  • December 2

2016 – Purcha hased 2 2016 C Che hevy V vy Volt lt ( (Ele lectric Vehic hicle)

  • October 2

2018 – Installed e ed energy gy-effic icie ient nt w water h heater

  • Nove

vember 2 2018 – Solar Carpo port a and d an addi dditional 2 2 du duel E Electric V Vehicle C Chargi ging g St Station

  • ns

s (T (Total of

  • f 4

4 duel El Electri ric V Vehicle Ch Charging St Stations)

  • Janu

nuary 2 y 2019 – Will ill be adding ing ano nothe her 2019 C Che hevy B vy Bolt lt t to o

  • ur f

fle leet (Ele lectric V Vehic hicle)

slide-14
SLIDE 14

50000 100000 150000 200000 250000 300000

Decl cline ne i in n ene nergy co cons nsumption f from Mar March ch 2003 2003 – Mar March ch 2019 ( 2019 (pr projected)

89 Jefferso rson B Boulevard rd War arwick, R RI

slide-15
SLIDE 15

Special Thanks!

Divis isio ion o

  • f Publi

lic U Utilit ilitie ies & & Carrie iers

Kevin Lynch, Deputy Administrator Al Contente, Engineer (Project Manager) Becky Harwood, Information Technology

Office o e of Energy R y Resou

  • urces

es

George Sfinarolakis – Solar Canopy Ryan Cote – Electric Vehicle Charging Stations

Divisi sion o

  • f Capi

pita tal A Asse set M t Manag ageme ment t & Mainte tenan ance

Simidele Mabray – Solar Canopy John Couture – Electric Vehicle Charging Stations

Newpo port R rt Renewab ables s

Stuart Flanagan – Co-Founder Michael Cabral – Co-Founder