june 2018 july 2018 july 2018 july 2018 july 2018 august
play

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 - PowerPoint PPT Presentation

June 2018 July 2018 July 2018 July 2018 July 2018 August 2018 August 2018 September 2018 Electr ectric V c Vehicle C Chargi ging g Stati tations We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8


  1. June 2018 July 2018

  2. July 2018

  3. July 2018

  4. July 2018

  5. August 2018

  6. August 2018

  7. September 2018

  8. Electr ectric V c Vehicle C Chargi ging g Stati tations • We currently have 4 duel ChargePoint CT4000 charging stations with ports to charge 8 Electric Vehicles at one time. • Each station has a color LCD display with an instructional video on how to use the station. • Multi-language: English, Spanish and French • Touch button interface works in rain, snow and with gloves.

  9. Elect Electric ic V Vehicl ehicle Cha Chargin ing Stations s • Each station has two standard Level 2 charging ports with locking holsters. • Each port provides that can 7.2 kW charge any Electric Vehicle. • Each port is equipped with a 23ft charging cord to increase the usability of our charging spots. • Charging stations are available 24/7.

  10. November 2018

  11. DPUC/PUC LEAD BY EXAMPLE • October 2 2012 – New ew en ener ergy-effic icie ient nt HVAC S System i installe lled • May 2 y 2013 – Purcha hased 2 2013 T Toyo yota Camry a y and nd T Toyo yota H Hig ighland nder ( (hyb hybrid ve vehic hicles) • December 2 2015 – En Energy-effic icie ient nt L LED lighting ing • Nove vember 2 2016 – 2 dual l Ele lectric V Vehic hicle Cha harging ng S Stations ns • December 2 2016 – Purcha hased 2 2016 C Che hevy V vy Volt lt ( (Ele lectric Vehic hicle) • October 2 2018 – Installed e ed energy gy-effic icie ient nt w water h heater • Nove vember 2 2018 – Solar Carpo port a and d an addi dditional 2 2 du duel E Electric V Vehicle C Chargi ging g St Station ons s (T (Total of of 4 4 duel El Electri ric V Vehicle Ch Charging St Stations) • Janu nuary 2 y 2019 – Will ill be adding ing ano nothe her 2019 C Che hevy B vy Bolt lt t to o our f fle leet (Ele lectric V Vehic hicle)

  12. Decl cline ne i in n ene nergy co cons nsumption f from Mar March ch 2003 2003 – Mar March ch 2019 ( 2019 (pr projected) 300000 89 Jefferso rson B Boulevard rd War arwick, R RI 250000 200000 150000 100000 50000 0

  13. Special Thanks! Divis isio ion o of Publi lic U Utilit ilitie ies & & Carrie iers Kevin Lynch, Deputy Administrator Al Contente, Engineer (Project Manager) Becky Harwood, Information Technology Office o e of Energy R y Resou ources es George Sfinarolakis – Solar Canopy Ryan Cote – Electric Vehicle Charging Stations Divisi sion o of Capi pita tal A Asse set M t Manag ageme ment t & Mainte tenan ance Simidele Mabray – Solar Canopy John Couture – Electric Vehicle Charging Stations Newpo port R rt Renewab ables s Stuart Flanagan – Co-Founder Michael Cabral – Co-Founder

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend