introduc ons
play

Introduc)ons Terrance DeGray, PE, CCM, LEED AP Program Director, - PowerPoint PPT Presentation

Introduc)ons Terrance DeGray, PE, CCM, LEED AP Program Director, LBCCD Bond Management Team Stephanie Lightner, PMP Program Scheduler, LBCCD Bond Management Team Nicole Soria-Velarde Project Coordinator and CommunicaBons, LBCCD Bond


  1. Introduc)ons • Terrance DeGray, PE, CCM, LEED AP Program Director, LBCCD Bond Management Team • Stephanie Lightner, PMP Program Scheduler, LBCCD Bond Management Team • Nicole Soria-Velarde Project Coordinator and CommunicaBons, LBCCD Bond Management Team 1

  2. Overview • Cordoba CorporaBon Long Beach City College Bond Program • Long Beach City College Sustainable Design and ConstrucBon • Oracle Cloud & Unifier ImplementaBon • QuesBons and Answer • 2

  3. Cordoba Corpora)on • Founded in 1983 • Mid-sized firm • 200 Employees • Ranked NaBonally by ENR • “Top 100” Professional Service Firm • “Top 50” Program Management Firm • Statewide presence • Los Angeles / Santa Ana / San Diego / San Francisco • 500+ clients • Local • Work where we live • LA and Orange CounBes for 30+ years 3

  4. Cordoba Corpora)on 4

  5. Core Services Program Management Environmental Services • Project management and controls • Permi_ng • EnBtlements and uBlity mapping • Compliance • Permi_ng support • MiBgaBon and monitoring • RemediaBon Construc)on Management • Quality assurance Specialty Services • Bid package preparaBon and evaluaBon • RelocaBon / Move management • Project controls • Commissioning and retro-commissioning • Change management • Energy efficiency consulBng Engineering •TransportaBon planning • Conceptual front-end studies • Stakeholder outreach and policy development •Development of plans, specs, and esBmates • Design/build 5

  6. Cordoba Corpora)on Project Highlights • Energy • Porbolio of pipeline safety • projects TransportaBon • Urban Roadways • Statewide Railways • EducaBon • Long Beach City College • Inglewood Unified • Oakland Unified • 6

  7. LBCC Bond Program • Long Beach City College • Current Enrollment approximately 25,000 • Long Beach EducaBon Partnership • NaBonally Recognized Long Beach College Promise • Workforce and Economic Development Programs • State of the Art VocaBonal Programs, including Culinary Arts, Nursing, Electrical 7

  8. LBCC Bond Program • Funding from Bond Measures totaling nearly $1.5 Billion • Cordoba CorporaBon provides Program and ConstrucBon Management Services • Project highlights • Building GG Student Services, Building V Math Tech, LAC Parking Structure 8

  9. LBCC Bond Program • 2041 Master Plan (Approved in May 2016) • Liberal Arts Campus: • 11 RenovaBons, 6 DemoliBon & 4 New ConstrucBon projects to be completed within the next 25 years. 9

  10. LBCC Bond Program • 2041 Master Plan (Approved in May 2016) • Pacific Coast Campus: • 2 RenovaBons, 1 DemoliBon & 3 New ConstrucBon projects to be completed within the next 25 years. 10

  11. LBCC Sustainable Design & Construc)on • Design Standards: Exceed design requirements of Title 24 by 15% • Savings by Design parBcipaBon • Two Central Plants constructed. • LAC – (2) 600 ton chillers, (1) 300 ton chiller, looking to expand. Designed for 2,400 ton capacity. • PCC – (2) 300 ton chillers, (1) 300 ton mulB- stack chiller. Designed for 900 ton capacity. • Energy Infrastructure Projects (LighBng, HVAC, Sub-metering, Infrastructure) 11

  12. LBCC Sustainable Design & Construc)on • LAC Parking Structure • Approximately 900 parking spaces • LighBng system uses high-efficiency GE ballasts • Achieve 77% beoer than 2008 Title 24 • Solar site • 450kW • Largest CSI system in Long Beach • Largest campus system in Long Beach • Revenue GeneraBon • AddiBonal revenue for LBCC is generated through parking Bcket machines 12

  13. LBCC Sustainable Design & Construc)on Building V Math Tech • CerBfied LEED PlaBnum Building • State of the art kitchen • Teaching restaurant • MathemaBcs labs • ObservaBon labs • Training spaces • 13

  14. LBCC Sustainable Design & Construc)on Building GG Student Services • CMAA 2016 Project of the Year • CerBfied LEED Silver Building • Admissions & Records, Financial Aid, • Disabled Student Programs and Services (DSPS), Extended Opportunity Programs and Services (EOPS), Student Counseling, Student Health Services • Building GG highlight 14

  15. Oracle Cloud & Unifier Implementa)on • Why Oracle Primavera Unifier • Unifier is the current upgrade from Primavera Contract Manger Financials • LBCC currently uBlized Oracle PeopleSoq and Oracle P6 • Best-in class project lifecycle management Schedule Email soluBon IntegraBon • LimitaBons of other systems Autodesk Constructware, EADOC, EcoSys, Procore • Limited CM business processes, drawing-centric, document-centric, ConstrucBon Drawings Management cloud security concerns, and limited integraBon capabiliBes 15

  16. Oracle Cloud & Unifier Implementa)on • Unifier ImplementaBon • Gaea’s soluBon team developed a successful framework, tapping into its rich resource pool consisBng of architects from Primavera and Unifier’s configuraBon specialists. • Blended Agile and Waterfall implementaBon methodology • Seamless collaboraBon in reviewing process design & configuraBon • Gaea brought in industry best pracBces from its global implementaBon experience • Custom business processes augmented OOTB processes 16

  17. Oracle Cloud & Unifier Implementa)on • SaaS vs. On-Premise • Speed of deployment, mobile applicaBons • SaaS more cost effecBve, no infrastructure to support • Reliability and scale on secure and reliable cloud service • Efficiencies in the field office with Oracle Cloud Services 17

  18. Oracle Cloud & Unifier Implementa)on • AutomaBon of Business Processes • All ConstrucBon Management acBviBes • Design through Post-ConstrucBon • Single Source for Document Control • User AdopBon of Revised Document Folder Structure within Unifier • Reduced Use of Network Folders • High Storage Capacity Removed Need for Separate Systems, DropBox etc. 18

  19. Oracle Cloud & Unifier Implementa)on • Shell Hierarchy Structure LBCC LAC Campus PCC Campus District Wide 19

  20. Oracle Cloud & Unifier Implementa)on • Project Accountability & Transparency • LBCC has had zero (0) audit findings in the last nine (9) years under Cordoba management • Project informaBon is easily retrievable within Unifier for project history, public record requests, and claims disputes • LBCC Board of Trustees Consent Items uBlize Purchase Order LisBng Board Report from Oracle PeopleSoq • Cordoba is a trusted partner for EducaBonal InsBtuBons and MunicipaliBes 20

  21. Oracle Cloud & Unifier Implementa)on • Oracle ConstrucBon and Engineering soluBons • LBCC Projects and EducaBonal opportuniBes benefit the enBre community • Oracle cloud service provides the right tools for project delivery success 21

  22. What ’ s Next • IntegraBon with Other Systems Such As P6, BIM, PeopleSoq, FaciliBes • Role Out Plaborm to Other EducaBon and FaciliBes Projects • Business Lines Within Cordoba • Program Management / Project Controls • Capital Planning 22

  23. Q&A QuesBons or Comments? Please contact Cordoba at slightner@cordobacorp.com if you have quesBons or comments related to this presentaBon. 23

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend