Introduc)ons Terrance DeGray, PE, CCM, LEED AP Program Director, - - PowerPoint PPT Presentation

introduc ons
SMART_READER_LITE
LIVE PREVIEW

Introduc)ons Terrance DeGray, PE, CCM, LEED AP Program Director, - - PowerPoint PPT Presentation

Introduc)ons Terrance DeGray, PE, CCM, LEED AP Program Director, LBCCD Bond Management Team Stephanie Lightner, PMP Program Scheduler, LBCCD Bond Management Team Nicole Soria-Velarde Project Coordinator and CommunicaBons, LBCCD Bond


slide-1
SLIDE 1

Introduc)ons

  • Terrance DeGray, PE, CCM, LEED AP

Program Director, LBCCD Bond Management Team

  • Stephanie Lightner, PMP

Program Scheduler, LBCCD Bond Management Team

  • Nicole Soria-Velarde

Project Coordinator and CommunicaBons, LBCCD Bond Management Team

1

slide-2
SLIDE 2

Overview

  • Cordoba CorporaBon
  • Long Beach City College Bond Program
  • Long Beach City College Sustainable Design and ConstrucBon
  • Oracle Cloud & Unifier ImplementaBon
  • QuesBons and Answer

2

slide-3
SLIDE 3

Cordoba Corpora)on

  • Founded in 1983
  • Mid-sized firm
  • 200 Employees
  • Ranked NaBonally by ENR
  • “Top 100” Professional Service Firm
  • “Top 50” Program Management Firm
  • Statewide presence
  • Los Angeles / Santa Ana / San Diego / San Francisco
  • 500+ clients
  • Local
  • Work where we live
  • LA and Orange CounBes for 30+ years

3

slide-4
SLIDE 4

Cordoba Corpora)on

4

slide-5
SLIDE 5

Core Services

Program Management

  • Project management and controls
  • EnBtlements and uBlity mapping
  • Permi_ng support

Construc)on Management

  • Quality assurance
  • Bid package preparaBon and evaluaBon
  • Project controls
  • Change management

Engineering

  • Conceptual front-end studies
  • Development of plans, specs, and esBmates
  • Design/build

Environmental Services

  • Permi_ng
  • Compliance
  • MiBgaBon and monitoring
  • RemediaBon

Specialty Services

  • RelocaBon / Move management
  • Commissioning and retro-commissioning
  • Energy efficiency consulBng
  • TransportaBon planning
  • Stakeholder outreach and policy development

5

slide-6
SLIDE 6

Cordoba Corpora)on

  • Project Highlights
  • Energy
  • Porbolio of pipeline safety

projects

  • TransportaBon
  • Urban Roadways
  • Statewide Railways
  • EducaBon
  • Long Beach City College
  • Inglewood Unified
  • Oakland Unified

6

slide-7
SLIDE 7
  • Long Beach City College
  • Current Enrollment approximately 25,000
  • Long Beach EducaBon Partnership
  • NaBonally Recognized Long Beach College Promise
  • Workforce and Economic Development Programs
  • State of the Art VocaBonal Programs, including Culinary Arts, Nursing, Electrical

LBCC Bond Program

7

slide-8
SLIDE 8
  • Funding from Bond Measures totaling nearly $1.5 Billion
  • Cordoba CorporaBon provides Program and ConstrucBon Management Services
  • Project highlights
  • Building GG Student Services, Building V Math Tech, LAC Parking Structure

LBCC Bond Program

8

slide-9
SLIDE 9
  • 2041 Master Plan (Approved in May 2016)
  • Liberal Arts Campus:
  • 11 RenovaBons, 6 DemoliBon & 4 New ConstrucBon projects

to be completed within the next 25 years.

LBCC Bond Program

9

slide-10
SLIDE 10
  • 2041 Master Plan (Approved in May 2016)
  • Pacific Coast Campus:
  • 2 RenovaBons, 1 DemoliBon & 3 New ConstrucBon projects

to be completed within the next 25 years.

LBCC Bond Program

10

slide-11
SLIDE 11

LBCC Sustainable Design & Construc)on

  • Design Standards: Exceed design requirements
  • f Title 24 by 15%
  • Savings by Design parBcipaBon
  • Two Central Plants constructed.
  • LAC – (2) 600 ton chillers, (1) 300 ton

chiller, looking to expand. Designed for 2,400 ton capacity.

  • PCC – (2) 300 ton chillers, (1) 300 ton mulB-

stack chiller. Designed for 900 ton capacity.

  • Energy Infrastructure Projects (LighBng, HVAC,

Sub-metering, Infrastructure)

11

slide-12
SLIDE 12

LBCC Sustainable Design & Construc)on

  • LAC Parking Structure
  • Approximately 900 parking spaces
  • LighBng system uses high-efficiency GE

ballasts

  • Achieve 77% beoer than 2008 Title 24
  • Solar site
  • 450kW
  • Largest CSI system in Long Beach
  • Largest campus system in Long Beach
  • Revenue GeneraBon
  • AddiBonal revenue for LBCC is generated

through parking Bcket machines

12

slide-13
SLIDE 13

LBCC Sustainable Design & Construc)on

  • Building V Math Tech
  • CerBfied LEED PlaBnum Building
  • State of the art kitchen
  • Teaching restaurant
  • MathemaBcs labs
  • ObservaBon labs
  • Training spaces

13

slide-14
SLIDE 14

LBCC Sustainable Design & Construc)on

  • Building GG

highlight

  • Building GG Student Services
  • CMAA 2016 Project of the Year
  • CerBfied LEED Silver Building
  • Admissions & Records, Financial Aid,

Disabled Student Programs and Services (DSPS), Extended Opportunity Programs and Services (EOPS), Student Counseling, Student Health Services

14

slide-15
SLIDE 15

Oracle Cloud & Unifier Implementa)on

  • Why Oracle Primavera Unifier
  • Unifier is the current upgrade from

Primavera Contract Manger

  • LBCC currently uBlized Oracle PeopleSoq

and Oracle P6

  • Best-in class project lifecycle management

soluBon

  • LimitaBons of other systems Autodesk

Constructware, EADOC, EcoSys, Procore

  • Limited CM business processes,

drawing-centric, document-centric, cloud security concerns, and limited integraBon capabiliBes

IntegraBon

Financials Email Drawings ConstrucBon Management Schedule

15

slide-16
SLIDE 16

Oracle Cloud & Unifier Implementa)on

  • Unifier ImplementaBon
  • Gaea’s soluBon team developed a successful framework, tapping into its rich

resource pool consisBng of architects from Primavera and Unifier’s configuraBon specialists.

  • Blended Agile and Waterfall implementaBon methodology
  • Seamless collaboraBon in reviewing process design & configuraBon
  • Gaea brought in industry best pracBces from its global implementaBon experience
  • Custom business processes augmented OOTB processes

16

slide-17
SLIDE 17

Oracle Cloud & Unifier Implementa)on

  • SaaS vs. On-Premise
  • Speed of deployment, mobile

applicaBons

  • SaaS more cost effecBve, no

infrastructure to support

  • Reliability and scale on secure and

reliable cloud service

  • Efficiencies in the field office with

Oracle Cloud Services

17

slide-18
SLIDE 18

Oracle Cloud & Unifier Implementa)on

  • AutomaBon of Business Processes
  • All ConstrucBon Management acBviBes
  • Design through Post-ConstrucBon
  • Single Source for Document Control
  • User AdopBon of Revised Document Folder Structure within Unifier
  • Reduced Use of Network Folders
  • High Storage Capacity Removed Need for Separate Systems, DropBox etc.

18

slide-19
SLIDE 19

Oracle Cloud & Unifier Implementa)on

  • Shell Hierarchy Structure

LBCC LAC Campus PCC Campus District Wide

19

slide-20
SLIDE 20

Oracle Cloud & Unifier Implementa)on

  • Project Accountability & Transparency
  • LBCC has had zero (0) audit findings in the

last nine (9) years under Cordoba management

  • Project informaBon is easily retrievable

within Unifier for project history, public record requests, and claims disputes

  • LBCC Board of Trustees Consent Items

uBlize Purchase Order LisBng Board Report from Oracle PeopleSoq

  • Cordoba is a trusted partner for

EducaBonal InsBtuBons and MunicipaliBes

20

slide-21
SLIDE 21

Oracle Cloud & Unifier Implementa)on

  • Oracle ConstrucBon and Engineering soluBons
  • LBCC Projects and EducaBonal opportuniBes benefit the enBre community
  • Oracle cloud service provides the right tools for project delivery success

21

slide-22
SLIDE 22

What’s Next

  • IntegraBon with Other Systems Such As P6, BIM, PeopleSoq, FaciliBes
  • Role Out Plaborm to Other EducaBon

and FaciliBes Projects

  • Business Lines Within Cordoba
  • Program Management / Project Controls
  • Capital Planning

22

slide-23
SLIDE 23

Q&A

QuesBons or Comments?

Please contact Cordoba at slightner@cordobacorp.com if you have quesBons or comments related to this presentaBon.