SLIDE 12 Policy Updates 01/23/2020 12
Cost Estimates
Contin ingency in in Fina Final Pl Plans ans es estim timate
IDM 20 20‐1. 1.03(03) (03) sa says all all quan antities tities sho should ld be be fin finali lized at at this this st stage
Quantities tities not not mat matchi hing ng betw tween een pla plans, s, quan quantity tity ca calcs & es estim timate
Partial dep depth pa patching hing
Pay It Item em and and/or USP USP mi missing on
non ov
proje
Pay It Item em sho should ld not not be be in included when when Hy Hydrodem
used
Polychloro roprene jo join int me membr mbranes nes use used fo for sem semi‐in integr gral end end ben bents
cluded in in the the cos cost of
Concrete, A, A, Su Substr tructur ucture per per 702. 702.28 28 of
Std Specs Specs
USP nee needed if if no no pa pay it item fo for Concr Concrete, A, A, Su Substructur ructure
Missing ssing brid bridge num numbers in in suppl pplem emen ental des descrip riptio ion fo for LSUM LSUM it items
Pay It Item fo for tem tempor
ary signa signal per per ID IDM 503 503‐7.04 7.04
Suppl pplem emen ental desc descriptio ion notin noting the the lo location fo for one
lane, tw two‐wa way ope
ions, ns, mu must st be be in included wi with th the the use use of
the fix fixed te temp mpor
signal or
portable sig signal pa pay it item.
Eliz lizabeth Phillip Phillips ephillip ephillips@in indot.in t.in.gov Ma Mark Orton Orton Mor Morton@
ndot.in.gov
Ka Katherine Sm Smutz utzer ks ksmutz tzer@ er@indot. ndot.in in.gov
Pe Pete Wh White pe pewhit ite@ e@in indot.in t.in.gov
General Email for Design Manual Inquiries DesignManualInquiries@indot.in.gov Standards andards and and Policy Policy
QUESTI QUESTIONS ONS