ICARUS vessels installation in “warm box” Steve Hahn 08/17/2018

1

slide-2
SLIDE 2

Timeline

  • Monday, July 23
  • Restricted access to Neutrino Campus
  • Removal of south wall of SBN-FD building; temporary plastic wall
  • Emmert assembly of Goldhoeffer trailer, gantry cranes, etc.
  • Thursday, August 2
  • ICARUS cold vessel 1 moved from stands to Emmert motorized, articulated trailer
  • Installation of rigging on gantries
  • Sunday, August 5
  • Trailer driven under gantries, both gantries rigged to vessel
  • Vessel lifted, trailer removed, vessel lowered to skate track
  • Vessel “skated” south on skate track
  • Wednesday, August 8
  • Alignment reflectors installed on vessel 1, vessel skated south to end and attached to south building

crane, left overnight supported by skate track and cribbing

  • Trailer was moved under cold vessel 2

2

slide-3
SLIDE 3

Timeline

  • Thursday, August 9
  • Vessel 1 attached to north building crane, vessel lifted, positioned over landing on west side
  • f “warm box”
  • While lowering found had to rotate around long axis since west wall of “warm box” had tilt

inward at top

  • Lowered to final position with help of “foot cameras”
  • Saturday, August 11
  • Vessel 2 rigged with gantries, put on skate track, trailer removed, skated into building
  • Monday, August 13
  • South end of vessel 2 rigged onto south building crane, north end rigged onto south gantry,

alignment lasers installed

  • Tuesday, August 14
  • North end of vessel 2 rigged onto north building crane, vessel lifted north and east to final

position, lowered to final position with help of “foot cameras”

3

slide-4
SLIDE 4

Photos

4

slide-5
SLIDE 5

Photos

5

slide-6
SLIDE 6

Photos

6

slide-7
SLIDE 7

Photos

7

slide-8
SLIDE 8

Photos

8

slide-9
SLIDE 9

Photos

9

slide-10
SLIDE 10

“Foot” cameras

10

slide-11
SLIDE 11

Thanks to Emmert, FNAL, INFN, CERN, ESH&Q, Alignment, VCS, and whoever I forgot

11