ICARUS vessels installation in warm box 08/17/2018 1 Timeline - - PowerPoint PPT Presentation
Steve Hahn ICARUS vessels installation in warm box 08/17/2018 1 Timeline Monday, July 23 Restricted access to Neutrino Campus Removal of south wall of SBN-FD building; temporary plastic wall Emmert assembly of
1
crane, left overnight supported by skate track and cribbing
2
inward at top
alignment lasers installed
position, lowered to final position with help of “foot cameras”
3
4