i nve st or pre se nt at i on annual ge ne ral me e t i
play

I NVE ST OR PRE SE NT AT I ON ANNUAL GE NE RAL ME E T - PowerPoint PPT Presentation

I NVE ST OR PRE SE NT AT I ON ANNUAL GE NE RAL ME E T I NG, 30 NOVE MBE R 2017 I NVE ST ME NT HI GHL I GHT S T hre e a dva nc e d, hig h-g ra de c o b a lt pro je c ts in No rth Ame ric a : Colson Cobalt Pr


  1. I NVE ST OR PRE SE NT AT I ON – ANNUAL GE NE RAL ME E T I NG, 30 NOVE MBE R 2017

  2. I NVE ST ME NT HI GHL I GHT S • T hre e a dva nc e d, hig h-g ra de c o b a lt pro je c ts in No rth Ame ric a : Colson Cobalt Pr oje c t in Idaho • Assa ys fro m sa mpling histo ric unde rg ro und wo rking s a t the inc lude : • 2.5m @ 5.33% Cu, 0.59% Co and 2.24 g/ t Au • 1.3m @ 6.16% Cu, 0.65% Co and 2.54 g/ t Au • 1.8m @ 2.99% Cu, 0.31% Co, 3.48 g/ t Au and 27.7 g/ t Ag Goodspr ings Pr oje c t in Ne vada • Ore g ra ding to 29% c obalt shippe d pre vio usly fro m the Co lumb ia Mine within the Co mpa ny’ s pro je c t a re a Haze lton Pr oje c t in Br itish Columbia • Ore fro m the histo ric Vic to ria Mine g ra de d 123.4 g/ t gold and 2.8% c obalt • Optio n to a c q uire a n 80% inte re st in the Ke e l Zinc Pr oje c t, Ir e land • I nfe rre d Re so urc e o f 6.9 Mt @ 5.6% Zn and 0.8% Pb 1 • $2.5m c ash at 30 Se pte mbe r 2017 (and ~$5.3m wor th of shor t- date d “in- the - mone y” Options) • Ne w manage me nt te am installe d on 27 Oc tobe r : • Co nc e rte d e xplo ra tio n pro g ra ms a t the Co mpa ny’ s ne w c o b a lt pro je c ts unde rwa y 1. Re fe r to ASX a nno unc e me nt da te d 07/ 03/ 2017 fo r furthe r info rma tio n re g a rding the Mine ra l Re so urc e e stima te . 2

  3. CORPORAT E OVE RVI E W Capital Struc ture ASX: L F R Shar e s 381.1M Options 10M @ $0.02 (e xpir e 31/ 12/ 17) 103.4M @ $0.05 (e xpir e 31/ 7/ 18) 10M @ $0.10 (e xpir e 10/ 5/ 20) Pe r for manc e Shar e s 23.8M Ca sh (30/ 9/ 17) $2.5M Mar ke t Cap (@ $0.11) $41.9M Board Ric har d Hill Non- E xe c . Chair man Mike Hayne s Managing Dir e c tor Bill Guy E xe c utive Dir e c tor Sc ott Mison Non- E xe c . Dir e c tor L ongfor d shar e pr ic e dur ing the past 12 months 3

  4. ACQUI SI T I ON OF NORT H AME RI CAN COBAL T ASSE T S • On Oc to b e r 27, 2017 L o ng fo rd a c q uire d unliste d c o mpa ny L ia z Pty L td (“L ia z”) • L ia z ha s b e e n b uilding a po rtfo lio o f No rth Ame ric a n c o b a lt a sse ts sinc e De c e mb e r 2016 • Ne w L o ng fo rd dire c to rs a ppo inte d: • Mike Ha yne s – Ma na g ing Dire c to r • Ric ha rd Hill – No n-E xe c utive Cha irma n • De nve r-b a se d E xplo ra tio n Ma na g e r, No rth Ame ric a a ppo inte d: • Pa tric k Sig lin L oc ation of L iaz’s Pr oje c ts in the USA and Canada 4

  5. WHY COBAL T ? • De ma nd fo r c o b a lt is inc re a sing a t 6.9% CAGR • 49% o f c o b a lt use d in the ma nufa c ture o f b a tte rie s • I n 2016 47,200 to nne s o f c o b a lt we re use d in b a tte rie s • De ma nd fo re c a st to do ub le to 94,800 to nne s b y 2026 • Curre ntly a supply de fic it • F o re c a st to wo rse n in c o ming ye a rs – susta ine d hig h c o b a lt pric e s a re pro b a b le • T he c o b a lt pric e pe a ke d a t US$52.30/ lb in 2008 whe n the re wa s a supply de fic it c o mpa ra b le to Cobalt pr ic e ove r the past 10 ye ar s and supply-de mand balanc e tha t fo re c a st fo r 2020 (vs c urre nt pric e o f US$27/ lb ) • 65% o f wo rld c o b a lt mine d in the DRC • Po litic a lly unsta b le • I nc re a sing de ma nd fo r e thic a lly mine d c o b a lt • Only 2% o f the wo rld’ s c o b a lt is de rive d fro m mine s whe re c o b a lt is the prima ry e le me nt mine d • Mo st c o b a lt is pro duc e d a s a b y-pro duc t in c o ppe r a nd nic ke l mine s • E xpa nsio n o f the se mine s wo n’ t ne c e ssa rily b e drive n b y a rising c o b a lt pric e 5

  6. T HE I DAHO COBAL T BE L T – T HE PRE MI E R COBAL T DI ST RI CT I N T HE USA • A 60km-lo ng b e lt ho sting the la rg e st kno wn hig h-g ra de c o b a lt re so urc e s in the US • 1949 – 1960: 5Mt of or e mine d fr om the Blac kbir d Mine @ 1.5% Cu and 0.6% Co • Curre nt a c tivity: e Cobalt Solutions Inc . (T SX:E CS) • De ve lo ping the fully pe rmitte d Ra m De po sit • Ho sts re so urc e s o f 4.7Mt @ 0.53% Co, 0.73% Cu and 0.48g/ t Au • F irst pro duc tio n ta rg e te d fo r 2019 • Ma rke t c a p. C$146m US Cobalt Inc . (T SXV:USCO) • Prima ry pro je c t is the I ro n Cre e k De po sit • Histo ric re so urc e o f 1.16Mt @ 0.59% Co • Curre ntly drilling 41 ho le s fo r ~ 12,000m • Ma rke t c a p. C$35m L oc ation of de posits in the Idaho Cobalt Be lt, Idaho 6

  7. T HE COL SON COPPE R-COBAL T PROJE CT , I DAHO COBAL T BE L T • Ce ntre d o n the Sa lmo n Ca nyo n Co ppe r-Co b a lt De po sit – o ne o f fe w a dva nc e d pro spe c ts in the I da ho Co b a lt Be lt • L o c a te d 25km a lo ng strike (NW) fro m the histo ric Bla c kb ird Co b a lt Mine • Dire c t ro a d a c c e ss to e Co b a lt So lutio ns’ Ra m De po sit Co lso n Pro je c t c o mprise s two la ndho lding s: 1. Option to Ac quir e the Salmon Canyon Coppe r - Cobalt De posit • L ia z ha s the e xc lusive rig ht to a c q uire 100% o f the Sa lmo n Ca nyo n Co ppe r-Co b a lt De po sit • T his a re a c o mprise s 10 BL M c la ims c o ve ring ~200 a c re s 2. 100% - owne d BL M c laims • L ia z ha s se c ure d a 100% inte re st in the a re a Cur r e nt e xte nts of the Colson Coppe r -Cobalt Pr oje c t surro unding the Sa lmo n Ca nyo n De po sit b y sta king 46 BL M c la ims c o ve ring a n a dditio na l 920 a c re s 7

  8. T HE COL SON COPPE R-COBAL T PROJE CT HI ST ORY OF T HE SAL MON CANYON DE POSI T • Disc o ve re d in the e a rly 1960s • 700m o f unde rg ro und de ve lo pme nt b e twe e n 1964 a nd 1979 • 500m-lo ng unde rg ro und drift a nd 3 ra ise s • Se ve ra l hundre d to nne s o f o re we re mine d, mille d, c o nc e ntra te d a nd sme lte d a t Ana c o nda ’ s sme lte r in Mo nta na • Virtua lly no wo rk unde rta ke n sinc e 1980 • De po sit still o wne d b y the pro spe c to r who disc o ve re d it (no w 82 ye a rs o ld) Or e , c onc e ntr ate and c oppe r me tal fr om the Salmon Canyon Coppe r -Cobalt De posit 8 Por tal to the Salmon Canyon Coppe r -Cobalt De posit

  9. T HE SAL MON CANYON DE POSI T – PRE VI OUS WORK • T wo pa ra lle l, sub -ho rizo nta l ho rizo ns o f stra tifo rm c o ppe r-c o b a lt mine ra lisa tio n (c ha lc o pyrite , c o b a ltite , a rse no pyrite a nd pyrite ) within me ta mo rpho se d se dime nts (g a rne t g ne iss) • Mine ra lisa tio n ma ppe d o ve r >300m o f strike a nd drille d o ve r >600m do wn-dip • ille d fro m surfa c e a nd unde rg ro und: Only 18 hole s dr • Ma ny (e a rly) ho le s we re n’ t a ssa ye d fo r c o b a lt • Assa y re sults inc lude • 2.5m @ 5.33% Cu, 0.59% Co, 2.24 g / t Au • 1.3m @ 6.16% Cu, 0.65% Co, 2.54 g / t Au • 1.8m @ 2.99% Cu, 0.31% Co, 3.48 g / t Au a nd 27.7 g / t Ag • Mine r alisation r e mains ope n in all dir e c tions • Gr ade appe ar s to be inc r e asing to the nor th and we st Plan vie w showing unde r gr ound wor kings and pr e vious 9 dr illing at the Salmon Canyon Coppe r -Cobalt De posit

  10. T HE COL SON COPPE R-COBAL T PROJE CT , I DAHO – F ORWARD PL ANS Q4 2017 • Syste ma tic so il sa mpling o ve r so uthe rn po rtio n o f Pro je c t a re a • Co ppe r-c o b a lt mine ra lisa tio n re po rte dly o utc ro ps to the so uth o f the Sa lmo n Ca nyo n De po sit • I nitia l sa mple a c q uisitio n pro g ra m ne a ring c o mple tio n; Assa y re sults a ntic ipa te d Q1 2018 • Drill pe rmit a pplic a tio ns b e ing a dva nc e d Q1/ Q2 2018 • F o llo w-up ma pping a nd infill so il sa mpling o ve r a re a s with a no ma lo us so il g e o c he mistry • Ma pping a nd re -sa mpling unde rg ro und wo rking s to re fine drill ta rg e ts • Gro und g e o physic s a s a ppro pria te • I nitia l drill-te sting o f ta rg e ts g e ne ra te d fro m the Co mpa ny’ s wo rk - c e rta inly fro m surfa c e a nd po ssib ly fro m unde rg ro und Old building and r ail at the e ntr anc e to the Salmon Canyon Uppe r adit at the Salmon L adde r in r aise at the Salmon 10 Coppe r -Cobalt De posit Canyon Coppe r -Cobalt De posit Canyon Coppe r -Cobalt De posit

  11. T HE GOODSPRI NGS COPPE R-COBAL T PROJE CT , NE VADA • Nume ro us sma ll-sc a le c o ppe r mine s o pe ra te d in the e a rly 1900s • L ittle to no a tte ntio n pa id to the c o b a lt po te ntia l a t the time o f mining • Histor ic pr oduc tion of e xtr e me ly high- gr ade c obalt or e fr om multiple c oppe r de posits in the distr ic t: Co lumb ia Mine • 3 shipme nts o f o re in 1921: • 249kg @ 29.18% Co • 1,720kg @ 13.42% Co Vie w fr om the Columbia De posit to Goodspr ings • 2,190kg @ 5.13% Co Co ppe r Chie f Mine • 3 shipme nts o f ha nd-so rte d o re re c o ve re d fro m the wa ste dumps in 1921: • 868kg @ 20.0% Co • 5,881kg @ 10.86% Co • 4,893kg @ 7.20% Co Hig hline Mine • 2 shipme nts o f ha nd-so rte d o re re c o ve re d fro m the wa ste dumps in 1921: • 544kg @ 12.45% Co • 2,186kg @ 6.35% Co • T e c hnic a l re po rts a sse rt the re is c o b a lt po te ntia l a t mo st/ a ll o f the histo ric 11 c o ppe r de po sits

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend