SLIDE 1 I-71/I-270/Stringtown Road Interchanges
PUBLIC INFORMATION MEETING FRA‐71‐7.45, PID 92615 May 1, 2014
SLIDE 2 Project Background
Project Goals:
- Improve safety
- Reduce congestion
Contributing factors:
- Traffic volumes will exceed
capacity
Stringtown
- Weaving on the ramps at the
I‐71/I‐270 interchange
- Backup on I‐71 at Stringtown
SLIDE 3
SLIDE 4
I-71/I-270 Interchange Existing Conditions
SLIDE 5
I-71/I-270 Interchange Fully Directional
SLIDE 6
I-71/I-270 Interchange Double Flyover
SLIDE 7
I-71/I-270 Interchange Single Flyover
SLIDE 8
I-71/I-270 Interchange Evaluation Matrix
SLIDE 9
I-71 between I-270 and Stringtown Road Existing Conditions
SLIDE 10
I-71 between I-270 and Stringtown Road Express Lanes
SLIDE 11
I-71 between I-270 and Stringtown Road Evaluation Matrix
SLIDE 12
I-71/Stringtown Road Interchange Existing Conditions
SLIDE 13
I-71/Stringtown Road Interchange Partial Cloverleaf (Modified Parclo-A)
SLIDE 14
I-71/Stringtown Road Interchange Modified Diamond
SLIDE 15
I-71/Stringtown Road Interchange Evaluation Matrix
SLIDE 16 Next Steps
- Complete environmental documentation – Fall 2014
- Stringtown Road east of I‐71 construction – Summer 2015
- I‐71/I‐270/Stringtown Road interchange design – 2015/2016
- Construction date to be determined based on funding
SLIDE 17 Stations
- Station 1 – Sign‐In Table & Study Area
- Station 2 – I‐71/I‐270 Interchange
- Station 3 – I‐71 between I‐270 & Stringtown Road
- Station 4 – I‐71/Stringtown Road Interchange
- Station 5 – Information on Creeks, Streams, & Noise
- Station 6 – Comment Forms
Comment forms are available at the sign‐in table & comment
- table. You may submit your comments today or mail to the
address on the back. All comments must be received by May 15, 2014 For more information, please visit www.transportation.ohio.gov/dist6