I-635 LBJ EAST PROJECT Texas Transportation Commission May 24, 2018 - PowerPoint PPT Presentation

I-635 LBJ EAST PROJECT Texas Transportation Commission May 24, 2018 I-635 LBJ East Project May 24, 2018 I-635 LBJ East Project Minute Order authorization Summary of Commission actions: Approve TxDOTs determination to exercise its


  1. I-635 LBJ EAST PROJECT Texas Transportation Commission May 24, 2018 I-635 LBJ East Project May 24, 2018

  2. I-635 LBJ East Project – Minute Order authorization Summary of Commission actions:  Approve TxDOT’s determination to exercise its option to develop, finance, construct and operate the I-635 LBJ East Project.  Authorize TxDOT to issue a request for qualifications (RFQ) to design, develop, construct and potentially maintain the I-635 LBJ East Project in the Dallas District. I-635 LBJ East Project May 24, 2018 2

  3. I-635 LBJ East Project – Purpose  Project purpose: – Improve safety and mobility – Relieve congestion – Reduce travel time – Accommodate projected growth through the region I-635 LBJ East Project May 24, 2018 3

  4. I-635 LBJ East Project – Project limit  Project limit: from US 75 to I-30, including I-30 interchange  Total length: 11 miles  Design-build cost: $1.6 B  Approved funding (2018 UTP): $0.7 B  Anticipated funding (2019 UTP adoption): $0.9 B  Total funding: $1 $1.6 B 6 B *Figures are rounded I-635 LBJ East Project May 24, 2018 4

  5. I-635 LBJ East Project – Overview EXISTING TYPICAL SECTION  Increased capacity: – Addition of one general purpose lane in each direction – Construction of two new continuous frontage roads in each direction – Reconstruction of existing tolled PROPOSED DESIGN-BUILD TYPICAL SECTION managed lane in each direction – I-635/I-30 interchange improvements Note: Additional capacity shown in purple. I-635 LBJ East Project May 24, 2018 5

  6. I-635 LBJ East Project – Decision tool  Decision support tool – Used to determine best delivery method: • Design-bid-build • Design-build – Tool considers TxDOT’s goals and specific project characteristics.  Results – Tool indicates design-build as most appropriate delivery method with a score of 0.79 (scale of -1.00 to 1.00). I-635 LBJ East Project May 24, 2018 6

  7. I-635 LBJ East Project – Current procurement timeline Milestone Date Commission action to issue RFQ May 24, 2018 Qualification statements due July 2018 Commission action to issue RFP July/Aug. 2018 Proposals due Spring 2019 Commission action for conditional award Summer 2019 Contract execution Summer 2019 Construction completion 2024 I-635 LBJ East Project May 24, 2018 7

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.