B RIDGE 1-438 N ICH OLAS D EAN D EL D OT B RID GE D ESIGN T IME IS OF THE E SSENCE E XISTING S ITE C ONDITIONS T IMING P RECAST I TEMS H IGH E ARLY S TRENGTH C ONCRETE & UHPC C ONNECTIONS UHPC O VERLAYS P ROSPECTIVE B

0 downloads 5 Views 9,14 MB Size Report
  1. B RIDGE 1-438 N ICH OLAS D EAN D EL D OT B RID GE D ESIGN

  2. • T IME IS OF THE E SSENCE • E XISTING S ITE C ONDITIONS • T IMING • P RECAST I TEMS • H IGH E ARLY S TRENGTH C ONCRETE & UHPC C ONNECTIONS • UHPC O VERLAYS

  3. • P ROSPECTIVE B IDDER N OTE #11 • A RMY C ORPS OF E NGINEERS N ATIONWIDE P ERMIT P ROGRAM E XPIRES 3/ 17/ 17 M UST HAVE EXECUTED CONTRACT , WHICH ALLOWS APPROVED PERMITS • A 1 YEAR EXTENSION

  4. • E XISTING C ONCRETE W EIR AND USGS M ONITORING S TATION • USGS C ONTACT • A NTHONY T ALLMAN • 302-734-2506 EXT . 223

  5. • U TILITY P OLES AND TREES IN CLOSE PROXIMITY TO ROADWAY • C RANE C ONSIDERATIONS M AY NOT BE ABLE TO SWING BOOM • L ARGER CRANE MAY BE REQUIRED • • S TAGING C ONSIDERATIONS S TORAGE OF EQUIPMENT • D ELIVERIES •

  6. • 7 D AYS FOR C LEARING AND G RUBBING IN ADVANCE OF U TILITY R ELOCATIONS ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • 42 C ALENDAR D AYS FOR U TILITY R ELOCATIONS ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • 33 C ALENDAR D AYS FOR B RIDGE C ONSTRUCTION ( FULL ROAD CLOSURE PROVIDED BY CONTRACTOR ) 4 WEATHER DAYS ALLOTTED SPECIFICALLY FOR BRIDGE CONSTRUCTION • • 7 C ALENDAR D AYS AFTER BRIDGE CONSTRUCTION IS COMPLETED FOR D ELMARVA P OWER TO RE - ENERGIZE ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • C ONTRACTOR NEEDS TO COMMUNICATE WITH UTILITY COMPANIES ABOUT TIMING C AN BRIDGE WORK OCCUR CONCURRENTLY WITH UTILITY WORK ? • R ELOCATIONS MAY NOT REQUIRE ENTIRE ALLOTTED TIME •

  7. • 100% P RECAST B RIDGE E LEMENTS T IGHTER TOLERANCES • P LACEMENT OF E LEMENTS MUST BE PRECISE / ACCURATE • • 14” X 14” PRECAST PILES T IGHTER TOLERANCE FOR DRIVING (2” IN ANY DIRECTION AT TOP OF PILE ) • • 24” X 48” P RECAST A DJACENT B OX B EAMS • E XTERIOR B EAM – P RECAST B ARRIER H EAVY , ECCENTRICALLY LOADED LIFTS • • S HEAR K EY C ONNECTIONS UHPC S HEAR K EYS • • P RECAST A BUTMENTS • S HIPPED IN TWO SECTIONS PER ABUTMENT • H EAVY LIFTS • P RECAST W INGWALLS • W INGWALL SECTIONS TO BE CANTILEVERED OFF OF ABUTMENTS

  8. • A BUTMENT / P ILE C LOSURE P OUR • W INGWALL / A BUTMENT C ONNECTION

  9. • D IFFERENT SHEAR KEY THAN TYPICAL • S URFACE PREPARATION AND INSTALLATION ARE KEY • R EACH OUT TO UHPC M ANUFACTURERS BEFORE CONSTRUCTION BEGINS • D IFFERENT MATERIAL PROPERTIES THAN NORMAL CONCRETE OR GROUT • UHPC R EPRESENTATIVE HAS A GREAT DEAL OF EXPERIENCE AND KNOWLEDGE • S ATURATED S URFACE D RY (SSD) & W ATER TIGHTNESS

  10. • UHPC B ACKWALL TO BE POURED SIMULTANEOUSLY WITH SHEAR KEY JOINT • B ACKWALL TO BE POURED TO TOP OF BEAM

  11. • N EW P RODUCT • D IFFERENT MATERIAL PROPERTIES THAN NORMAL CONCRETE AND GROUT • S TIFFER THAN THE UHPC MIX FOR JOINTS • S URFACE PREPARATION AND INSTALLATION ARE KEY • R EACH OUT TO UHPC M ANUFACTURERS BEFORE CONSTRUCTION BEGINS • D EFER TO UHPC R EPRESENTATIVE ’ S EXPERTISE

  12. • T IMING • 33 C ALENDAR D AYS FOR BRIDGE CONSTRUCTION • P RECISION • A CCURACY IN FIELD MEASUREMENTS AND PRECAST ELEMENT PLACEMENT ARE KEY • UHPC • N EWER M ATERIAL • Q UALITY C ONTROL • F OLLOW UHPC R EPRESENTATIVE ’ S A DVICE • P REPARE A PLACEMENT P LAN PRIOR TO PRE - CONSTRUCTION MEETING

Recommend Documents


01 24 2019
01/24/2019 L OW -D ENSITY C ELLULAR C

01/24/2019 L OW -D ENSITY C ELLULAR C ONCRETE (LDCC) L OW -D ENSITY C ELLULAR C

applications of uhpc
Applications of UHPC Pakistan Academy

Applications of UHPC Pakistan Academy of Engineering December 28, 2019 Tariq

f inding s trength in d iversity
F INDING S TRENGTH IN D IVERSITY : C

F INDING S TRENGTH IN D IVERSITY : C RAFTING A N EW N ARRATIVE M ICHELLE B EE ,

e arly warning syste m and disaste r e arly warning syste
E ARLY WARNING SYSTE M AND DISASTE R

E ARLY WARNING SYSTE M AND DISASTE R E ARLY WARNING SYSTE M AND DISASTE

m ay 2 0 1 1
M AY 2 0 1 1 F I NANCI AL S TRENGTH

SELECTIVE INSURANCE GROUP , INC. I NVESTOR P RESENTATI ON M AY 2 0 1 1 F I

debra hoffos i love you l ord my s trength the l ord is
Debra Hoffos I love You, L ORD , my s

Debra Hoffos I love You, L ORD , my s trength . The L ORD is my rock , my

7 27 2017
7/27/2017 E ARLY M ATHEMATICS : O

7/27/2017 S UPPORTING E ARLY M ATHEMATICS WITH C REATIVE I NVESTIGATIONS B ASED

t he r ole of bekp s trength on its
T HE R OLE OF BEKP S TRENGTH ON ITS M

T HE R OLE OF BEKP S TRENGTH ON ITS M ARKET S HARE Paulo Csar Pavan 1

uhpc for accelerated bridge construction dot experience
UHPC for Accelerated Bridge

1 UHPC for Accelerated Bridge Construction (DOT Experience) Mathew Royce PE

each school has a math science academic mission all
Each school has a math & science

N ATIONAL E ARLY C OLLEGE C ONFERENCE O CTOBER 29, 2013 E ARLY C OLLEGE B

background
Background History of the Clayton

A CCELERATED B RIDGE C ONSTRUCTION THE C LAYTON S TREET B RIDGE R EPLACEMENT

load test of load test of high capacity micropile
Load Test of Load Test of High

Load Test of Load Test of High Capacity Micropile Micropile High Capacity

vessel ss william a irvin relocation
Vessel SS William A. Irvin Relocation

Vessel SS William A. Irvin Relocation Duluth, MN CHASE DEWHIRST, PE AMI

harrisburg overpass construction update
Harrisburg Overpass Construction Update

Harrisburg Overpass Construction Update March 7, 2016 Activity Progress Since

town of norwich
TOWN OF NORWICH Norwich Pool Dam and

TOWN OF NORWICH Norwich Pool Dam and Recreation Area PRESENTATION by Shawn

significance since according to the patient his father
significance since, according to the

CASE REPORT Nisal S et al.: Management of Pier Abutment Using Non Rigid

wearing surface replacem ent
WEARING SURFACE REPLACEM ENT Public

KINGFIELD CENTENNIAL BRIDGE #5852 WEARING SURFACE REPLACEM ENT Public Meeting

author
Author: Jojok Widodo Soetjipto Tri

The 4 th International Conference on Rehabilitation and Maintenance in Civil

iowa accelerated bridge construction
IOWA ACCELERATED BRIDGE CONSTRUCTION

IOWA ACCELERATED BRIDGE CONSTRUCTION Norm McDonald, PE 2014 ASCE

study of parameters that influence i girder bridge
STUDY OF PARAMETERS THAT INFLUENCE

STUDY OF PARAMETERS THAT INFLUENCE I-GIRDER BRIDGE BEHAVIOR DURING FIRE

sr 73 loudon county bridge sr73 bridge history
SR 73 Loudon County Bridge SR73 Bridge

SR 73 Loudon County Bridge SR73 Bridge History Several alternates were

pedestrian bridge and connecting trail over arizona
Pedestrian Bridge and Connecting Trail

Pedestrian Bridge and Connecting Trail Over Arizona Avenue, NW Public Meeting