  1. B RIDGE 1-438 N ICH OLAS D EAN D EL D OT B RID GE D ESIGN

  2. • T IME IS OF THE E SSENCE • E XISTING S ITE C ONDITIONS • T IMING • P RECAST I TEMS • H IGH E ARLY S TRENGTH C ONCRETE & UHPC C ONNECTIONS • UHPC O VERLAYS

  3. • P ROSPECTIVE B IDDER N OTE #11 • A RMY C ORPS OF E NGINEERS N ATIONWIDE P ERMIT P ROGRAM E XPIRES 3/ 17/ 17 M UST HAVE EXECUTED CONTRACT , WHICH ALLOWS APPROVED PERMITS • A 1 YEAR EXTENSION

  4. • E XISTING C ONCRETE W EIR AND USGS M ONITORING S TATION • USGS C ONTACT • A NTHONY T ALLMAN • 302-734-2506 EXT . 223

  5. • U TILITY P OLES AND TREES IN CLOSE PROXIMITY TO ROADWAY • C RANE C ONSIDERATIONS M AY NOT BE ABLE TO SWING BOOM • L ARGER CRANE MAY BE REQUIRED • • S TAGING C ONSIDERATIONS S TORAGE OF EQUIPMENT • D ELIVERIES •

  6. • 7 D AYS FOR C LEARING AND G RUBBING IN ADVANCE OF U TILITY R ELOCATIONS ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • 42 C ALENDAR D AYS FOR U TILITY R ELOCATIONS ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • 33 C ALENDAR D AYS FOR B RIDGE C ONSTRUCTION ( FULL ROAD CLOSURE PROVIDED BY CONTRACTOR ) 4 WEATHER DAYS ALLOTTED SPECIFICALLY FOR BRIDGE CONSTRUCTION • • 7 C ALENDAR D AYS AFTER BRIDGE CONSTRUCTION IS COMPLETED FOR D ELMARVA P OWER TO RE - ENERGIZE ( SINGLE LANE CLOSURE PROVIDED BY CONTRACTOR ) • C ONTRACTOR NEEDS TO COMMUNICATE WITH UTILITY COMPANIES ABOUT TIMING C AN BRIDGE WORK OCCUR CONCURRENTLY WITH UTILITY WORK ? • R ELOCATIONS MAY NOT REQUIRE ENTIRE ALLOTTED TIME •

  7. • 100% P RECAST B RIDGE E LEMENTS T IGHTER TOLERANCES • P LACEMENT OF E LEMENTS MUST BE PRECISE / ACCURATE • • 14” X 14” PRECAST PILES T IGHTER TOLERANCE FOR DRIVING (2” IN ANY DIRECTION AT TOP OF PILE ) • • 24” X 48” P RECAST A DJACENT B OX B EAMS • E XTERIOR B EAM – P RECAST B ARRIER H EAVY , ECCENTRICALLY LOADED LIFTS • • S HEAR K EY C ONNECTIONS UHPC S HEAR K EYS • • P RECAST A BUTMENTS • S HIPPED IN TWO SECTIONS PER ABUTMENT • H EAVY LIFTS • P RECAST W INGWALLS • W INGWALL SECTIONS TO BE CANTILEVERED OFF OF ABUTMENTS

  8. • A BUTMENT / P ILE C LOSURE P OUR • W INGWALL / A BUTMENT C ONNECTION

  9. • D IFFERENT SHEAR KEY THAN TYPICAL • S URFACE PREPARATION AND INSTALLATION ARE KEY • R EACH OUT TO UHPC M ANUFACTURERS BEFORE CONSTRUCTION BEGINS • D IFFERENT MATERIAL PROPERTIES THAN NORMAL CONCRETE OR GROUT • UHPC R EPRESENTATIVE HAS A GREAT DEAL OF EXPERIENCE AND KNOWLEDGE • S ATURATED S URFACE D RY (SSD) & W ATER TIGHTNESS

  10. • UHPC B ACKWALL TO BE POURED SIMULTANEOUSLY WITH SHEAR KEY JOINT • B ACKWALL TO BE POURED TO TOP OF BEAM

  11. • N EW P RODUCT • D IFFERENT MATERIAL PROPERTIES THAN NORMAL CONCRETE AND GROUT • S TIFFER THAN THE UHPC MIX FOR JOINTS • S URFACE PREPARATION AND INSTALLATION ARE KEY • R EACH OUT TO UHPC M ANUFACTURERS BEFORE CONSTRUCTION BEGINS • D EFER TO UHPC R EPRESENTATIVE ’ S EXPERTISE

  12. • T IMING • 33 C ALENDAR D AYS FOR BRIDGE CONSTRUCTION • P RECISION • A CCURACY IN FIELD MEASUREMENTS AND PRECAST ELEMENT PLACEMENT ARE KEY • UHPC • N EWER M ATERIAL • Q UALITY C ONTROL • F OLLOW UHPC R EPRESENTATIVE ’ S A DVICE • P REPARE A PLACEMENT P LAN PRIOR TO PRE - CONSTRUCTION MEETING

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.