government of the federation
play

GOVERNMENT OF THE FEDERATION PRESENTS THE STATUS OF IMPLEMENTATION - PowerPoint PPT Presentation

OFFICE OF THE SECRETARY TO GOVERNMENT OF THE FEDERATION PRESENTS THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 BY BOSS MUSTAPHA CONTENT 1.0 INTRODUCTION Vision, Mission


  1. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT FUNDS NO OF & ACCESSED STATUS OF JOBS PROJECT DATE OF USER REMARKS (PROSPECTS OF SN PROCUREM BY THE IMPLEMENT CREATED TITTLE APPROVAL AGENCY COMPLETION) ENT PROJECT ATION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: (i) Dam/Dyke Construction; (ii) Spillway, Stilling Basin and Bottom outlet; (iii) 5 Nos Reinforced concrete Culverts construction; (iv) Canal Construction. Erosion/Flood The Status is 40% and it is On- Control Project of Ecological 13 March, 2017 15 Months N/A 50% 45 going. Rice Field, Suru Fund Office Challenge: The flood from River LGA, Kebbi State Niger due to heavy downpour at the peak of raining season forced the Contractor to suspend works at site for about 3 months. the Contractor is back on site and has submitted a new work plan which is still within the project time frame. The Scope of works include: i. Rehabilitation of Sabke Treatment Plant; ii. Completion of Distribution Sabke/Dutsi and Fed. Min. of Network (Reticulation); Mashi Water 14 March, 2017 Water 19 Months N/A 70% 45 iii. Completion of Dutsi Water Supply Project, Resources Supply and Irrigation Plant; Katsina State iv. Completion of Mashi Water Supply and Irrigation Plant; and v. Associated Works. The Project is 59.9% On-going. The Scope of work include: Ecological (i) Site clearance Work; (ii) 2 Nos. Culvert and 850m length Challenges at Alex Ekwueme Ecological of Drains; 15 April, 2017 8 Months N/A 100% 45 University, Ndufu Fund Office (iii) 2.7km Pavement and Surfacing . Alike Ikwo, Ebonyi The project is 100% completed. State Awaiting Commissioning and 9 Handing Over.

  2. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT FUNDS NO OF & ACCESSED STATUS OF JOBS DATE OF USER REMARKS (PROSPECTS OF SN PROJECT TITTLE PROCUREM BY THE IMPLEMENT CREATED APPROVAL AGENCY COMPLETION) ENT PROJECT ATION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: Gully Erosion (i) Site clearance Work; Control and (ii) Rehabilitation of 2.9km Flood Ecological Access Road and Drains . 16 Improvement April, 2017 Fund 10 Months N/A 100% 40 The Status is 100% completed. Works at Awlaw, Office Awaiting commissioning and Oji-River LGA, handing over Enugu State Rijau, Dugge, The Scope of work include: Dukku, (i) Site Clearance and T/Magajiya and Earthworks; Genu, Rijau Local Ecological (ii) 5 Nos. Culverts and 950m 17 Government April, 2017 Fund 12 Months N/A 100% 38 length of drains; Erosion and Office (iii) Pavement and surfacing Flood Control The Status is 100% completed. Project, Niger It is yet to be commissioned State and handed over. The scope of work include: . i. Site Clearance; ii. Earthworks and Excavation; Erosion Control iii. Construction of Concrete Works at Odo Ecological Drains and Culverts; and 18 Alaamo, April, 2017 Fund 10 Months N/A 100% 40 iv. Road work and Pavement Ogbomoso, Oyo Office Construction. State The project is 100% completed and awaiting commissioning and handing over. 10

  3. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT FUNDS NO OF & ACCESSED STATUS OF JOBS PROJECT DATE OF USER REMARKS (PROSPECTS OF SN PROCUREM BY THE IMPLEMENT CREATED TITTLE APPROVAL AGENCY COMPLETION) ENT PROJECT ATION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: (i) Site Clearance; (ii) Construction of 150m Erosion Control Spillway; on the Drainage (iii) Desilting of reservoir; Basin of Ecological (iv) Reinstatement of Dam 19 Ahmadu Bello April, 2017 Fund 8 Months N/A 95% 38 Embankment; University, Zaria Office (v) Provision of 275m Toe Lake/Dam, Drain; Kaduna State (vi) Provision of intake structure. The Status is 95% and it is on- going. The Scope of work include: Nkari Erosion (i) Site clearance Work; Control and (ii) Rehabilitation of 2.5km Ecological Road Access Road and Drains . 20 April, 2017 Fund 9 Months N/A 72% 40 Improvement The Status is 72% and it is on- Office Works, Ini LGA, going. Communal clashes Akwa Ibom State slowed down the progress of work. The Scope of work include: Gully Erosion (i) Construction of Drains for and Road flood and racketed structures Improvement Ecological (800m) 21 Works, April, 2017 Fund 10 Months N/A 80% 40 (ii) 1.3km Road Improvement Nasarawa Town Office Works . (Phase I), The Status is 80% completed Nasarawa State and it is on-going. 11

  4. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS NO OF JOBS STATUS OF DATE OF USER PROCUREME ACCESSED CREATED REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT APPROVAL AGENCY NT BY THE SKILLED/ COMPLETION) ION (%) DURATION PROJECT (%) UNSKILLED The Scope of work include: (i) Site clearance Work; University of (ii) Concrete Work. Calabar (iii) Construction of 1,283m Erosion & reinforced Concrete Ecological 22 Flood Control May, 2017 Fund 9 Months N/A 100% 38 drainage; Office Works, (iv) Construction of 6 Nos. Calabar, Cross Concrete catchment pit. The River State Status is 100% completed. Awaiting commissioning and handing over. The Scope of work include: (i) Clearance and Fumigation; (ii) Shaping and compaction of cleared section; (iii) Reclamation of eroded section; Erosion (iv) Construction of draining Control and chambers; Ecological Project at (v) Construction of 350m 23 June, 2017 Fund 6 Months N/A 85% 38 State House length Retaining walls Office Presidential (vi) Embankment of Villa, Abuja protection chutes, stone pitching. The Status is 70% and it is on-going. Challenge: The Security clearance from State House delayed the early commencement of the 12 project.

  5. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS NO OF JOBS STATUS OF PROJECT DATE OF USER PROCUREME ACCESSED CREATED REMARKS (PROSPECTS OF SN IMPLEMENTAT TITTLE APPROVAL AGENCY NT BY THE SKILLED/ COMPLETION) ION (%) DURATION PROJECT (%) UNSKILLED Flood And Erosion The Scope of work include: Control Of (i) Excavation Ecological Damaturu- (ii) 7,250m Concrete Drains and 24 June 2017 Fund 9 Months N/A 50% 45 Balmari- 7 Nos. of Culvert . Office Gashua Road, The Status is 50% and it is on- Damaturu LGA, going. Yobe State The Scope of work include: Ondo (i) Site Clearance and Township Ecological Earthworks; November, Contractor 25 Erosion Fund 9 Months N/A 40 (ii) Culverts and drains; 2017 Mobilized Control Works, Office (iii) Pavement and surfacing. Ondo State Construction work is on-going. The project is 15% Ongoing. Erosion Control and Road The Scope of work include: Improvement (i) Site clearing Work; Ecological Works of November, (ii) Culvert and Drains; 26 Fund 9 Months N/A 45% 40 OORA/AAYO 2017 (iii) Pavement and Surfacing . Office River, Oke- Construction work is on-going. Ayo Area, The project is 45% Ongoing. Ilesha, Osun State 13

  6. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS NO OF JOBS STATUS OF PROJECT DATE OF USER PROCUREME ACCESSED CREATED REMARKS (PROSPECTS OF SN IMPLEMENTAT TITTLE APPROVAL AGENCY NT BY THE SKILLED/ COMPLETION) ION (%) DURATION PROJECT (%) UNSKILLED Project Development The Scope of work include: Institute (i) Excavation Enugu Ecologica (ii) 765m Concrete Drains (PRODA) November, 27 l Fund 8 Months N/A 50% 40 and 5 Nos. Culvert. Federal 2017 Office Construction work is on- Ministry of going. Science & The project is 50% Ongoing. Technology, Enugu State Gandu, The Scope of work include: Tukuntawa (i)Site clearance and earth and Zoo Road Ecologica November, Contractor work 28 Erosion and l Fund 6 Months N/A 40 2017 Mobilized (ii) Culverts and drains; Flood Control Office (iii) Pavement and surfacing. Project, Kano The project is 15% Ongoing. State 14

  7. ECOLOGICAL FUND OFFICE THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT FUNDS NO OF & ACCESSED STATUS OF JOBS PROJECT DATE OF USER REMARKS (PROSPECTS OF SN PROCUREM BY THE IMPLEMENT CREATED TITTLE APPROVAL AGENCY COMPLETION) ENT PROJECT ATION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: (i)Construction of Old Cemetery Drains; Tundun (ii)Construction of new Magayaki/Ce Cemetery Drains; metery/ Gully (iii) Construction of Drains Erosion and Ecologica November, Contractor along Dallatu Road. 29 Flood l Fund 6 Months N/A 40 2017 Mobilized (iv)Repair to completed Control, Office section of main drain; Sokoto (v)Extending of drains from South LGA, other roads to main drains Sokoto State Construction of main drain at Magayaki, The project is 15% Ongoing. The Scope of work include: i. 100m Shoreline Shoreline protection; and Ecologica Protection, November, ii sand filling. 30 l Fund 8 Months N/A 70% 45 Alebiri, 2017 Dredging Machine moved to Office Bayelsa State site and work has began in earnest. The project is 70% Ongoing. 15

  8. ECOLOGICAL FUND OFFICE (EFO) PROJECTS BELOW FEDERAL EXECUTIVE COUNCIL (FEC) THRESHHOLD FROM MAY 2015 TO DECEMBER 2017 ARE IN ANNEX (I) Total Numbers of Projects : 64 Numbers of Completed Projects: 55 Numbers of Ongoing Projects: 9 JOB CREATION ➢ Skilled Jobs 357 ➢ Unskilled Jobs 1,350 16

  9. ESTIMATED NUMBER OF JOBS CREATED BY EFO PROJECTS FROM MAY 2015 TO DECEMBER 2017 ▪ Though the projects are short termed but during the period, several jobs were created ▪ The following are the types of Skilled and Unskilled Employees employed by Contractors/Consultants; Skilled Unskilled ➢ Civil Engineers Labourers ➢ Structural Engineers ➢ Highway Engineers ➢ Water Engineers ➢ Mechanical/Electrical Engineers ➢ Technicians ➢ Welders ➢ Carpenters ➢ Masons ➢ Painters 17

  10. ▪ In addition, these projects also impacted lives in the Communities in many ways; ➢ Increase in economic productivity ➢ Safety of lives and properties ➢ Improvement in the standard of living ➢ Access to Farmlands and Markets ➢ Reduction in prices of food items ➢ Increased Inter-Communal relationship and peace ➢ Reduction in cost of transportation ➢ Federal Government’s presence being felt ➢ Improved security within the Communities ➢ Value of properties improved/enhanced ➢ Communities have extended appreciation to Federal Government ▪ For Small and Medium size projects, about 90 lives are impacted which translate to about 5,760 lives in 64 projects executed ▪ For Bigger projects, about 120 lives are impacted which translate to about 3,600 lives in 30 projects executed ▪ About 8,820 lives were directly impacted and empowered 18

  11. ESTIMATED NUMBER OF JOBS CREATED BY EFO PROJECTS FROM MAY 2015 TO DECEMBER 2017 ▪ Out of 64 projects which fall within the EFO Tenders Board approval limit, about 357 skilled employees were engaged ▪ The Unskilled labours were about 1,409 Labourers ▪ Out of 30 projects which fall within the Federal Executive Council (FEC) approval, 270 skilled employees were engaged The Unskilled labour were about 1,350 ▪ 3,386 Professionals and Unskilled labour were created 19

  12. ESTIMATED NUMBER OF JOBS CREATED BY EFO PROJECTS FROM MAY 2015 TO DECEMBER 2017 Nos of Jobs Created by EFO Projects from May, 2015 to Dec., 2017 Key: 2759 Skilled Employees Civil Engineers Structural Engineers Highway Engineers Water Engineers Mechanical Engineers Technicians Welders Carpenters Painters Masons Unskilled Labour Labourers 627 20 Skilled Unskilled

  13. 2.2 CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) S/N MEETING OF REFERENCE NUMBER AND IMPLEMENTING DECISION TAKEN IN COUNCIL DETAILS OF ACTION FEC AND SUBJECT OF MEMORANDUM MDAS TAKEN DATE EC(2015)14 TH 1. AOB: CAO Conclusion 8 i. Implemented MEETING OF ii. Report on the Residential Accommodation for i. The President directed that 7 DECEMBER, Residential Ministers proposals be made to address 2015 Accommodation for Ministers’ accommodation Ministers has been challenge approved by the Federal Executive Council and awaiting implementation EC(2016) 3 RD 2. 1. EC(2016)3: Report of the Cabinet CAO Conclusion 4 i. Cabinet Committee Committee on Nigeria’s accession to MEETING of Assignment i. Approved the recommendations 17 the (Budapest) Convention on completed and of the Committee as highlighted in FEBRUARY, Cybercrime, (CET NO.185). Report submitted paragraph 9 (i to iii) of the 2016. memorandum EC(2017)12 TH 1. EC(2017)78: Approval for the Report of 3 CAO Conclusion 5 Cabinet Committee MEETING OF the Cabinet Committee to Resolve the 1. Approved the following Assignment 29 MARCH , Issue of Ministerial oversight of the ICT recommendations of the Cabinet completed and 2017 Sector in Nigeria Committee: Report submitted Section 148(1) of the Constitution gives the President the power to assign responsibilities and mandates to Ministers and this discretion cannot be constrained by any existing laws, 21

  14. CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) President to direct the Business of Government should be accepted as the basis of authority for the assignment of mandates to MDAs. The mandates of MDAs are determined by the direction of Government Policy and Extant Laws should be reviewed to support the implementation of Government policy. The Laws regulating the operations of NITDA, NIGCOMSAT Ltd. and Galaxy Backbone Ltd should be reviewed and brought in line with the policy intentions of Government The Policy of Government on the mandates of the Ministries of Science & Technology and Communications is as stipulated in the extant circular conveying the approved responsibilities, structure and parastatals of the two Ministries which is SGF Circular ref. No. 59386/IV/760 of 15 August, 2011. This Circular should be re-issued by this Administration for the avoidance of doubt. The mandate to drive information Technology given to the Ministry of Communications was a deliberate decision of Government to create a specialized sector to leverage the emerging potentials in ICT and this should be kept separate from the MS&T, in accordance with global best practices and the wishes of ICT professional bodies in Nigeria. The Ministry of Communications, which is the rightful agency in which the Presidential Council proposed on e-Government is to be domiciled, should review the composition of the proposed Council and include all critical stakeholders before resubmitting the memorandum to Council. 22

  15. CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) The Federal MS&T presently has oversight of 17 parastatals, which are mostly research Agencies. It is not optimal for its span of control and effective supervision to further increase the number of parastatals under it and therefore, the status quo should be maintained. There is need for greater collaboration and harmonious working relationship between the Ministries of Communications and Science & Technology to ensure that the end result of innovation is applied to develop the ICT sector. The full functional review of the mandates of all Ministries should be immediately undertaken and the report presented to the Federal Executive Council for consideration and approval. Since the Committee did not find any reason to support the objection by the Minister of Science & Technology that the subjects of the memoranda revolve around the statutory mandates of that Ministry, the Minister of Communications should represent the following two memoranda for Council’s consideration. the Nigeria e-Government Master-Plan 2016-2020. the Nigeria ICT Sector Roadmap 2016-2019. 23

  16. CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) EC(2017)14 TH 4 AOB: CAO Conclusion 8(ix) i. Completed . MEETING OF ii. Directory of Re-activation of the Website of i. Directed that every Ministry 12 APRIL, functional official Ministries should submit to Cabinet Affairs 2017 websites of MDAs Office the upgrade on the status already compiled of their official websites, by the Cabinet including the names of their Affairs Office with appropriate Desk Officers, for the Desk Officers presentation to Council. also listed 5 EC(2017)17 TH AOB: CAO Conclusion 13(xi) Complied with . MEETING OF Need to Adhere to the Rules Guiding i. Directed that, henceforth, 10 MAY, 2017 the Processing of Council memoranda to be considered at Memoranda Council meetings must be circulated on or before Friday preceding the meeting EC(2017)30 TH 6 1. EC(2017)186: Approval for the CAO Conclusion 8 Complied with . MEETING OF 9 Award of Contract for the Engineering i. Directed the Cabinet Affairs Office AUGUST, 2017 Procurement and Construction of the to convey the directive of Council 3,050mw Mambilla Hydroelectric to the AGF/MoJ to enable him Power Project, Gembu, Taraba State propose a suitable date for the meeting with the Minister of Power, Works and Housing within a few days to resolve the likely legal issues that may arise on the matter 24

  17. CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) EC(2017)33 RD 7 1. EC(2017)184: Approval for the CAO Conclusion 5 i. Cabinet committee . MEETING OF passage into law of the: constituted and i. Stepped down Memorandum 13 Constitution (alteration) Bill, 2017: assignment is on- EC(2017)184 to enable the Vice SEPTEMBER, Electoral Act (Amendment) Bill, going President and the Attorney 2017 2017; Political Parties and General of the Federation & Electoral Offences Commission Minister of Justice to constitute Bill, 2017; and constituency a Cabinet Committee that delimitation centre bill, 2017 would examine the Bills, with a view to addressing the issues raised by the Vice president, and submit a Report to Council. EC(2017)35 TH 8 1. EC(2017)180: Approval of the CAO Conclusion 4 i. Cabinet committee . MEETING OF Draft National Policy on Internally constituted and i. Stepped down Memorandum 27 Displaced Persons In Nigeria, 2017 assignment is on- EC(2017)180 on the Draft SEPTEMBER, going National Policy on Internally 2017 Displaced Persons in Nigeria 2017, for members to further study the policy document and to enable the National Commission for Refugees, Migrants & Internally Displaced Persons to address the issues raised by members and re-present to Council within 2 weeks. i. Directed the Ministry of Interior to put in place mechanisms for effective monitoring of the activities of all organisations assisting the IDPs, and that a Committee should be set up to 25 check the activities of those organisations

  18. CABINET AFFAIRS OFFICE 9. 2. EC(2017)209: Approval for the CAO Conclusion 5 i. Cabinet committee Report And Recommendations of the constituted and i. Stepped down Memorandum Inter-Ministerial Working Committee assignment is on- EC(2017)209 to enable members to on the Status of Nigeria’s Membership going aggregate their views on the Report of International Organisations and and re-present same to Council Associated Financial Obligations within 2 weeks. i. Directed the Minister of Finance to include all the external statutory obligations in the budget for onward transmission to the National Assembly (NASS) for approval, to avoid the embarrassment which the non- payment of Nigeria’s assessed financial obligations to the IOs might cause the country EC(2017)37 TH 1. EC(2017)228: Approval of the Report 10 CAO Conclusion 4 i. The White Paper of the Technical Committee on Industrial . MEETING OF 11 Drafting Committee is Relations Matters in the Federal Public i. Directed the Acting Secretary to the OCTOBER, 2017 chaired by Minister of Service Government of the Federation to Labour & Employment. constitute a White Paper Drafting Committee to examine the Report of i. The assignment is on- the Technical Committee on Industrial going and the Relations Matters in the Federal Public Committee would soon Service and submit its report back to Council. recommendations to Council. i. Directed members to critically study the Report and submit their inputs to the Office of the Secretary to the Government of the Federation. i. Directed that the Yayale Ahmed Committee Report be circulated to members for their information and guidance 26

  19. CABINET AFFAIRS OFFICE PROGRESS REPORT ON THE IMPLEMENTATION OF THE DECISIONS OF THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM THE CABINET AFFAIRS OFFICE (CAO) EC(2017)44 TH AOB: 11 CAO Conclusion 9(vii) i. Complied with MEETING OF ii. Actionable Need to modify the Reporting of i. Directed the Council Secretariat 29 decisions/directive Council Discussions Under any to modify its rendition of AOB NOVEMBER, s are now reflected Other Business (AOB) in the discussions to capture 2017 under AOB Conclusions, to Reflect Actionable actionable decisions and Decisions/Directives directives of Council as appropriate. 27

  20. 2.3 FEDERAL ROAD SAFETY CORPS (FRSC) THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL FROM 2015 TO DATE FUNDS CONTRACT & STATUS OF REMARKS DATE OF USER ACCESSED BY S/N PROJECT TITLE PROCUREMENT IMPLEMENTATION (PROSPECTS OF APPROVAL AGENCY THE PROJECT DURATION (%) COMPLETION) (%) APPROVAL FOR THE AWARD VEHICLES OF CONTRACT FOR THE 1 23/11/2016 FRSC 30 DAYS 100 100 DISTRIBUTED AS DIRECT PROCUREMENT OF ATTACHED OPERATIONAL VEHICLES FOR THE FEDERAL ROAD SAFETY CORPS 28

  21. LIST OF FEDERAL ROAD SAFETY CORPS VEHICLES ACQUIRED IN DECEMBER 2016 DATE OF NEW REG S/N MAKE/TYPE COMMAND CHASSIS NO PURCHASE/ CONDITION PURPOSE NO ALLOCATION 1 IVM P/UP A01 459 RS RSHQ TSD FKZSR31B2ET110079 DEC 2016 FUNCTIONAL PATROL 2 IVM P/UP A01 542 RS RS 5.14 IGARA UNIT FKZSR31B2ET030051 DEC 2016 FUNCTIONAL PATROL 3 IVM P/UP A01 79 RS RS 6.2 A ODUKPANI OUTPOST FKZSR31B2ET110039 DEC 2016 FUNCTIONAL PATROL 4 IVM P/UP A01 842 RS RS 8.36 OGORIMAGONGO UNIT FKZSR31B2ET030160 DEC 2016 FUNCTIONAL PATROL 5 IVM P/UP A01 868 RS RS 4.14 BUKURU UNIT FKZSR31B2ET110021 DEC 2016 FUNCTIONAL PATROL 6 IVM P/UP A01 869 RS RS 7.18 YANGOJI UNIT FKZSR31B2ET030022 DEC 2016 FUNCTIONAL PATROL 7 IVM P/UP A01 870 RS RS 5.12 BENIN TOLL GATE UNIT FKZSR31B2ET110128 DEC 2016 FUNCTIONAL PATROL 8 IVM P/UP A01 887 RS RS 10.31 TALATA MAFARA UNIT FKZSR31B2ET110093 DEC 2016 FUNCTIONAL PATROL 9 IVM P/UP A01 919 RS RS 8.37 OKENE UNIT FKZSR31B2ET030021 DEC 2016 FUNCTIONAL PATROL 10 IVM P/UP A01 920 RS RS 2.28 A ILARO OUTPOST FKZSR31B2ET030091 DEC 2016 FUNCTIONAL PATROL 11 IVM P/UP A01 921 RS RS 2.23 A IBAFO OUTPOST FKZSR31B2ET110092 DEC 2016 FUNCTIONAL PATROL 12 IVM P/UP A01 922 RS RS 2.23 MOWE UNIT FKZSR31B2ET030095 DEC 2016 FUNCTIONAL PATROL 13 IVM P/UP A01 923 RS RS 7.111 B BWARI OUTPOST FKZSR31B2ET030132 DEC 2016 FUNCTIONAL PATROL 14 IVM P/UP A01 924 RS RS 6.13 ISIOKPO UNIT FKZSR31B2ET110013 DEC 2016 FUNCTIONAL PATROL 15 IVM P/UP A01 925 RS RS 12.21 BIU UNIT FKZSR31B2ET110057 DEC 2016 FUNCTIONAL PATROL 16 IVM P/UP A01 926 RS RS 7.11 GWAGWALADA UNIT FKZSR31B2ET110118 DEC 2016 FUNCTIONAL PATROL 17 IVM P/UP A01 927 RS RS 5.21 WARRI UNIT FKZSR31B2ET110085 DEC 2016 FUNCTIONAL PATROL 18 IVM P/UP A01 928 RS RSHQ TSD FKZSR31B2ET030172 DEC 2016 FUNCTIONAL PATROL 29

  22. LIST OF FEDERAL ROAD SAFETY CORPS VEHICLES ACQUIRED IN DECEMBER 2016 19 IVM P/UP A01 929 RS RS 7.26 SABON WUSE UNIT FKZSR31B2ET030066 DEC 2016 FUNCTIONAL PATROL 20 IVM P/UP A01 930 RS RS 2.114 WHARF UNIT FKZSR31B2ET110162 DEC 2016 FUNCTIONAL PATROL 21 IVM P/UP A01 931 RS RS 11.37 KISI UNIT FKZSR31B2ET110129 DEC 2016 FUNCTIONAL PATROL 22 IVM P/UP A01 932 RS RS 7.1 FCT SECTOR FKZSR31B2ET030127 DEC 2016 FUNCTIONAL PATROL 23 IVM P/UP A01 933 RS RS 7.12 ABAJI UNIT FKZSR31B2ET030116 DEC 2016 FUNCTIONAL PATROL 24 IVM P/UP A01 934 RS RS 8.34 ZARIAGI FKZSR31B2ET110105 DEC 2016 FUNCTIONAL PATROL 25 IVM P/UP A01 935 RS RS 9.32 KM 78 ABA UNIT FKZSR31B2ET110005 DEC 2016 FUNCTIONAL PATROL 26 IVM P/UP A01 936 RS RS 9.23 NKALAGU FKZSR31B2ET110043 DEC 2016 FUNCTIONAL PATROL 27 IVM P/UP A01 937 RS RS 5.16 UWAN-ESIGIE UNIT FKZSR31B2ET030019 DEC 2016 FUNCTIONAL PATROL 28 IVM P/UP A01 938 RS RS 6.4 BAYELSA SECTOR FKZSR31B2ET110178 DEC 2016 FUNCTIONAL PATROL 29 IVM P/UP A01 939 RS RS 11.33 APATA UNIT FKZSR31B2ET110112 DEC 2016 FUNCTIONAL PATROL 30 IVM P/UP A01 950 RS RS 7.26 A TAFA OUTPOST FKZSR31B2ET110031 DEC 2016 FUNCTIONAL PATROL 31 IVM P/UP A01 951 RS RS 8.12 A ODO-OWA OUTPOST FKZSR31B2ET110025 DEC 2016 FUNCTIONAL PATROL 32 IVM P/UP A01 952 RS RS 8.1 A IDOFIAN OUTPOST FKZSR31B2ET110154 DEC 2016 FUNCTIONAL PATROL 33 IVM P/UP A01 953 RS RS 2.21A GATE 3 OUTPOST IJEBU-ODE FKZSR31B2ET030060 DEC 2016 FUNCTIONAL PATROL 34 IVM P/UP A01 954 RS RS 1.42 GUMEL UNIT FKZSR31B2ET110158 DEC 2016 FUNCTIONAL PATROL 35 IVM P/UP A01 955 RS RSHQ TSD COBRA FKZSR31B2ET030118 DEC 2016 FUNCTIONAL PATROL 36 IVM P/UP A01 956 RS RS 11.21 A AJEBANDELE OUTPOST FKZSR31B2ET030143 DEC 2016 FUNCTIONAL PATROL 37 IVM P/UP A01 957 RS RS 11.14 IKIRUN FKZSR31B2ET110003 DEC 2016 FUNCTIONAL PATROL 38 IVM P/UP A01 958 RS RS 10.2A YAURI OUTPOST FKZSR31B2ET110026 DEC 2016 FUNCTIONAL PATROL 39 IVM P/UP A01 959 RS RS 11.16 GBONGAN UNIT FKZSR31B2ET110161 DEC 2016 FUNCTIONAL PATROL 30 40 IVM P/UP A01 960 RS RS 11.24 ASEJERE UNIT FKZSR31B2ET110087 DEC 2016 FUNCTIONAL PATROL

  23. LIST OF FEDERAL ROAD SAFETY CORPS VEHICLES ACQUIRED IN DECEMBER 2016 1 PGT 301 ACCESS 06-04 RS RSHQ MVA (HEAD PLANT GWA/LADA) VF3DDHMYBDJ847434 DEC 2016 FUNCTIONAL ADMIN 2 PGT 301 ACCESS 24-04 RS RS 2.0 LAGOS ZONAL COMMAND VF3DDHMYBEJ699925 DEC 2016 FUNCTIONAL ADMIN 3 PGT 301 ACCESS 32-04 RS RS 10.2 KEBBI SECTOR VF3DDHMYBDJ877755 DEC 2016 FUNCTIONAL ADMIN 4 PGT 301 ACCESS 37-04 RS RS 12.3 YOBE SECTOR VF3DDHMYBFJ546682 DEC 2016 FUNCTIONAL ADMIN 5 PGT 301 ACCESS 52-04 RS RSHQ MVA (HOS PRINT FARM) VF3DDHMYBEJ549807 DEC 2016 FUNCTIONAL ADMIN 6 PGT 301 ACCESS 55-04 RS RS 4.3 NASARAWA SECTOR COMDR VF3DDHMYBFJ546669 DEC 2016 FUNCTIONAL ADMIN 7 PGT 301 ACCESS 57-04 RS RS 12.2 BORNO SECTOR VF3DDHMYBDJ877759 DEC 2016 FUNCTIONAL ADMIN 8 PGT 301 ACCESS 59-04 RS RS 10.1 SOKOTO SECTOR CMDR VF3DDHMYBEJ546155 DEC 2016 FUNCTIONAL ADMIN 9 PGT 301 ACCESS 60-04 RS RS 12.1 BAUCHI SECTOR VF3DDHMYBDJ877762 DEC 2016 FUNCTIONAL PATROL 10 PGT 301 ACCESS 61-04 RS RS 11.1 OSUN SECTOR VF3DDHMYBDJ819994 DEC 2016 FUNCTIONAL ADMIN 11 PGT 301 ACCESS 64-04 RS RSHQ TRG CMDT JOS VF3DDHMYBDJ887148 DEC 2016 FUNCTIONAL ADMIN 12 PGT 301 ACCESS 65-04 RS RS 10.3 ZAMFARA SECTOR CMDR VF3DDHMYBDJ877761 DEC 2016 FUNCTIONAL ADMIN 13 PGT 301 ACCESS 72-04 RS RS 9.3 ABIA SECTOR VF3DDHMYBDJ887149 DEC 2016 FUNCTIONAL ADMIN 14 PGT 301 ACCESS 73-04 RS RS 8.2 EKITI SECTOR VF3DDHMYBFJ546657 DEC 2016 FUNCTIONAL ADMIN 15 PGT 301 ACCESS 85-04 RS RS 7.1 FCT SECTOR VF3DDHMYBFJ533271 DEC 2016 FUNCTIONAL ADMIN 16 PGT 301 ACCESS 93-04 RS RS 5.3 HEAD AWKA PLANT VF3DDHMYBDJ805296 DEC 2016 FUNCTIONAL ADMIN 17 PGT 301 ACCESS 98-04 RS. RS 8.3 KOGI SECTOR VF3DDHMYBFJ539979 DEC 2016 FUNCTIONAL ADMIN 18 PGT 301 ACCESS 99-04 RS RSHQ PIO VF3DDHMYBFJ546684 DEC 2016 FUNCTIONAL ADMIN 19 PGT 301 ACCESS A01 940 RS RS 7.111 A GWARIMPA OUT POST VF3DDHMYBFJ546663 DEC 2016 FUNCTIONAL PATROL 20 PGT 301 ACCESS A01 941 RS RS 11.13 IPETU-IJESHA VF3DDHMYBDJ881229 DEC 2016 FUNCTIONAL PATROL 21 PGT 301 ACCESS A01 943 RS RS 11.35 EGBEDA UNIT VF3DDHMYBDJ881230 DEC 2016 FUNCTIONAL PATROL 22 PGT 301 ACCESS A01 945 RS RS 7.11 GWAGWALADA UNIT VF3DDHMYBFJ546674 DEC 2016 FUNCTIONAL PATROL 23 PGT 301 ACCESS A01 946 RS RSHQ TSD VF3DDHMYBDJ864528 DEC 2016 FUNCTIONAL ADMIN 24 PGT 301 ACCESS A01 947 RS RS 7.110 LUGBE UNIT VF3DDHMYBDJ805295 DEC 2016 FUNCTIONAL PATROL 25 PGT 301 ACCESS A01 948 RS RS 11.12 ILESHA VF3DDHMYBDJ873928 DEC 2016 FUNCTIONAL PATROL 26 PGT 301 ACCESS A01 949 RS RS 7.1 A MPAPE OUTPOST VF3DDHMYBFJ546675 DEC 2016 FUNCTIONAL PATROL 27 PGT 301 ACCESS HQ 96 RS RSHQ TSD VF3DDHMYBFJ546696 DEC 2016 FUNCTIONAL ADMIN SUMMARY: IVM PICK -UP = 40 PGT 301 ACCESS = 27 31

  24. 2.4 NATIONAL HAJJ COMMISSION OF NIGERIA (NAHCON) THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 S/NO PROJECT COST OF DATE OF USER CONTRACT FUNDS STATUS OF REMARKS TITTLE PROJECT APPROVAL AGENCY & ACCESSD IMPLEMENT (PROSPECT (N) PROCUREM BY THE ATION (%) OF ENT PROJECT COMPLETION) DURATION 8 TH NOVEMBER, ▪ ▪ Acquisition, . National Hajj 2017 - 2019 Partly 75% Awaiting the 1. and 2017. Commission of funded Completion Balance to be Renovation of Nigeria from (Properties returned to Acquired (HAHCON) Savings purchased. Hajj Account. ▪ Properties, from Un-renovated) The Funds Furnishing and Service required for Equiping the Charges to renovation Properties, Pilgrims and and Relocation and Capital Furnishing of of Office to the Budget the new Office newly Appropriati has been Acquired on Act of included in Properties 2017. the 2018 ▪ named Metrol The sum of Budget Plaza, at Plot N1.5B was Proposal 991/992 raised from Mailari Street, Hajj Central Savings Business over the District, FCT, past years; ▪ Abuja. Balance was to be funded from Year 2017 Budget Appropriati on out of which 50% had been 32 released.

  25. 2.5 NATIONAL PENSION COMMISSION THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS ACCESSED STATUS OF REMARKS S/N PROJECT COST OF PROJECT DATE OF USER AGENCY PROCUREME BY THE PROJECT IMPLEMENTATIO (PROSPECTS OF TITLE APPROVAL NT DURATION (%) N (%) COMPLETION) Direct $539,130.72@N3 11/1/2017 National Within five 33.33% 70% Deployment of 1 Licenses as at Procurement 04.75/$ (approved Pension (5) working (Deployment of February 2018: and = by Federal Commission days from (N54,766,695.64) Lisenses) Acquisition of N164,300,086.92 Executive the 1. Microsoft Microsoft to be paid in 3 no Council) execution of Office Plus Office 365 equal instalment contract Professional Enterprise over a period of 3 agreement. 2016 (400 Licenses) License years A license is 2. SharePoint given Server Enterprise 2016 (1 Server) 3. Project Professional 2013 (5 Licenses) 4. Windows Server 2016 (5 Licenses) 5. SQL Server Standard Core 2017 (1 Server) 6. Windows 10 33

  26. 2.6 NATIONAL POPULATION COMMISSION THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS ACCESSED STATUS OF REMARKS S/ PROJECT TITLE DATE OF USER AGENCY PROCUREME BY THE PROJECT IMPLEMENT (PROSPECTS N APPROVAL NT DURATION (%) ATION (%) OF COMPLETION) 1 Direct 17/05/2017 National 30 Days N308,480,000.00 100% Completed Procurement of Population Five Toyota Land Commission Cruiser Jeeps; One Toyota Hilux Double Cabin Pick-Up One Toyota Coaster Bus for Operational uses. 34

  27. 2.7 ECONOMIC AND FINANCIAL CRIMES COMMSSION THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE FEDERAL EXECUTIVE COUNCIL (FEC) FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS STATUS OF REMARKS S/N PROJECT TITLE DATE OF USER AGENCY PROCUREME ACCESSED BY IMPLEMENTATION (PROSPECTS APPROVAL NT DURATION THE PROJECT (%) OF (%) COMPLETION) 1 Award of 12/10/2016 EFCC 100% Completed Contracts for the Direct Procurement of Operational Vehicles for the Economic and Financial Crimes Commission (EFCC) 2 Award of Contract 26/4/2017 EFCC 80% On-going for revised estimated total cost for the Contract for the Completion of the On-going Construction of the EFCC Corporate Headquarters Office, Abuja 3 Award of Contract 6/12/2017 EFCC 8 Weeks 0% On-going for the Provision of Internet Broadband and Firewall for the EFCC Headquarters and all its Zonal Offices 35

  28. PICTORIAL EVIDENCES OF SOME OF THE APPROVED FEDERAL EXECUTIVE COUNCIL (FEC) PROJECTS FROM MAY 2015 TO DECEMBER 2017 36

  29. ECOLOGICAL FUND OFFICE UNIVERSITY OF CALABAR EROSION & FLOOD CONTROL WORKS, CALABAR, CROSS RIVER STATE BEFORE Above represents sample of parts of the ecological site before the commencement of work 37

  30. UNIVERSITY OF CALABAR EROSION & FLOOD CONTROL WORKS, CALABAR, CROSS RIVER STATE DURING AFTER 38 Above represents sample of parts of the on-going work at site

  31. UNIVERSITY OF CALABAR EROSION & FLOOD CONTROL WORKS, CALABAR, CROSS RIVER STATE AFTER 39 Above represents sample of parts of completed work

  32. REMEDIATION OF THE HYDROCARBON SLUDGE AT THE WARRI REFINERY AND PETROCHEMICAL COMPANY PHASE II, WARRI SOUTH LGA, DELTA STATE. BEFORE DURING Above represents sample of parts of the ecological sites before the Above represents sample of parts of the on-going work at the site commencement of work AFTER 40 Above represents sample of parts of the completed work

  33. EROSION CONTROL IN AWLAW TOWN, OJI RIVER L.G.A. ENUGU STATE DURING BEFORE AFTER 41 Above represents sample of parts of the ecological site before the commencement of work

  34. EROSION CONTROL IN AWLAW TOWN, OJI RIVER L.G.A. ENUGU STATE DURING Above represents sample of parts of the on-going work at the site 42

  35. EROSION CONTROL IN AWLAW TOWN, OJI RIVER L.G.A. ENUGU STATE AFTER 43 Above represents sample of parts of the completed work

  36. CHANNELISATION AND DE-SILTING OF OKOKO AND OGBAGBA RIVERS IN OSOGBO, OSUN STATE BEFORE DURING Above represents sample of parts of the ecological sites before Above represents sample of parts of the on-going work at the commencement of work site AFTER 44 Above represents sample of parts of the completed work

  37. RIJAU, DUGGE, DUKKU, T/MAGAJIYA AND GENU EROSION AND FLOOD CONTROL, RIJAU LGA, NIGER STATE BEFORE 45 Above represents sample of parts of the ecological site before the commencement of work

  38. RIJAU, DUGGE, DUKKU, T/MAGAJIYA AND GENU EROSION AND FLOOD CONTROL, RIJAU LGA, NIGER STATE DURING 46 Above represents sample of parts of the on-going work at the site

  39. RIJAU, DUGGE, DUKKU, T/MAGAJIYA AND GENU EROSION AND FLOOD CONTROL, RIJAU LGA, NIGER STATE AFTER 47 Above represents sample of parts of the completed work

  40. DAURA TOWNSHIP EROSION CONTROL, PHASE I, DAURA, KATSINA STATE DURING 48 Above represents sample of parts of the on-going work at the site

  41. DAURA TOWNSHIP EROSION CONTROL, PHASE I, DAURA, KATSINA STATE AFTER Above represents sample of parts of the completed work 49

  42. DAURA TOWNSHIP EROSION AND FLOOD CONTROL WORKS, PHASE 2, KATSINA STATE COMMISSIONED AND HANDED OVER 50 Above represents sample of parts of the completed work

  43. KWOI EROSION AND FLOOD CONTROL WORKS, JABA, KADUNA STATE BEFORE 51 Above represents sample of parts of the ecological site before the commencement of work

  44. KWOI EROSION AND FLOOD CONTROL WORKS, JABA, KADUNA STATE DURING Above represents sample of parts of the on-going work at the site 52

  45. KWOI EROSION AND FLOOD CONTROL WORKS, JABA, KADUNA STATE AFTER Above represents sample of parts of the completed work 53

  46. SABKE/DUTSI AND MASHI WATER SUPPLY PROJECT, KATSINA STATE AWAITING COMMISSIONING ON-GOING Above represents sample of parts of the on-going work at the site 54

  47. EROSION CONTROL WORKS AT ALEX EKWUEME UNIVERSITY, NDUFU ALIKE IKWO, EBONYI STATE DURING BEFORE AFTER 55 Above represents sample of parts of the ecological site before the commencement of work

  48. EROSION CONTROL WORKS AT ALEX EKWUEME UNIVERSITY, NDUFU ALIKE IKWO, EBONYI STATE DURING 56 Above represents sample of parts of the on-going work at the site

  49. EROSION CONTROL WORKS AT ALEX EKWUEME UNIVERSITY, NDUFU ALIKE IKWO, EBONYI STATE AFTER 57 Above represents sample of parts of the completed work

  50. EROSION CONTROL WORKS AT ODO ALAAMO, OGBOMOSO, OYO STATE BEFORE DURING Above represents sample of parts of the ecological site before the Above represents sample of parts of the on-going work at the site commencement of work AFTER 58 Above represents sample of parts of the completed work

  51. FLOOD AND EROSION CONTROL WORKS , DAMATURU – BALMARI – GASHUA ROAD, DAMATURU LGA, YOBE STATE DURING BEFORE 59 Above represents sample of parts of the ecological site before the commencement of work

  52. FLOOD AND EROSION CONTROL WORKS , DAMATURU – BALMARI – GASHUA ROAD, DAMATURU LGA, YOBE STATE DURING 60 Above represents sample of parts of the on-going work at the site

  53. FLOOD AND EROSION CONTROL WORKS , DAMATURU – BALMARI – GASHUA ROAD, DAMATURU LGA, YOBE STATE ON-GOING 61 Above represents sample of parts of the on-going work at the site

  54. GULLY EROSION CONTROL WORKS AT VERITAS UNIVERSITY, BWARI, ABUJA BEFORE DURING Above represents sample of parts of the ecological site before the Above represents sample of parts of the on-going work at the site commencement of work AFTER 62 Above represents sample of parts of the completed work

  55. EROSION AND FLOOD CONTROL WORKS AT PROJECT DEVELOPMENT INSTUTUTE (PRODA), FEDERAL MINISTRY OF SCIENCE & TECHNOLOGY ENUGU STATE BEFORE 63 Above represents sample of parts of the ecological site before the commencement of work

  56. EROSION AND FLOOD CONTROL WORKS AT PROJECT DEVELOPMENT INSTUTUTE (PRODA), FEDERAL MINISTRY OF SCIENCE & TECHNOLOGY ENUGU STATE ON-GOING 64 Above represents sample of parts of the on-going work at the site

  57. DISILTING OF OGBAGBA AND OKOKO RIVERS, OSHOGBO, PHASE I & II, OSUN STATE BEFORE 65 Above represents sample of parts of the ecological site before the commencement of work

  58. DISILTING OF OGBAGBA AND OKOKO RIVERS, OSHOGBO, PHASE I & II, OSUN STATE DURING 66 Above represents sample of parts of the on-going work at the site

  59. SHORELINE PROTECTION, ALEBIRI, BAYELSA STATE BEFORE 67 Above represents sample of parts of the ecological site before the commencement of work

  60. SHORELINE PROTECTION, ALEBIRI, BAYELSA STATE ON-GOING 68 Above represents sample of parts of the on-going work at the site

  61. ABAJI GULLY EROSION AND FLOOD CONTROL WORKS ABAJI AREA COUNCIL, ABUJA BEFORE 69 Above represents sample of parts of the ecological site before the commencement of work

  62. ABAJI GULLY EROSION AND FLOOD CONTROL WORKS ABAJI AREA COUNCIL, ABUJA ON-GOING Above represents sample of parts of the on-going work at the site 70

  63. ABAJI GULLY EROSION AND FLOOD CONTROL WORKS ABAJI AREA COUNCIL, ABUJA AFTER 71 Above represents sample of parts of the completed work

  64. AZARE TOWNSHIP FLOOD AND EROSION CONTROL WORKS, AZARE, BAUCHI STATE BEFORE 72 Above represents sample of parts of the ecological site before the commencement of work

  65. AZARE TOWNSHIP FLOOD AND EROSION CONTROL WORKS, AZARE, BAUCHI STATE ON-GOING Above represents sample of parts of the on-going work at the site 73

  66. AZARE TOWNSHIP FLOOD AND EROSION CONTROL WORKS, AZARE, BAUCHI STATE AFTER 74 Above represents sample of parts of the completed work

  67. CHANNELIZATION AND FLOOD CONTROL OF PONJ-AFO RIVER, IKIRUN, OSUN STATE: PICTORIALS OF SITE BEFORE COMMENCEMENT OF WORK BEFORE 75 Above represents sample of parts of the ecological site before the commencement of work

  68. CHANNELIZATION AND FLOOD CONTROL OF PONJ-AFO RIVER, IKIRUN, OSUN STATE: DURING Above represents sample of parts of the on-going work at the site 76

  69. CHANNELIZATION AND FLOOD CONTROL OF PONJ-AFO RIVER, IKIRUN, OSUN STATE: AFTER 77 Above represents sample of parts of the completed work

  70. EROSION AND FLOOD CONTROL WORKS AT IFEDAYO/BOLUWADURO/ILA, OSUN STATE BEFORE Above represents sample of parts of the ecological site before the commencement of work 78

  71. EROSION AND FLOOD CONTROL WORKS AT IFEDAYO/BOLUWADURO/ILA, OSUN STATE DURING Above represents sample of parts of the on-going work at the site 79

  72. EROSION AND FLOOD CONTROL WORKS AT IFEDAYO/BOLUWADURO/ILA, OSUN STATE AFTER 80 Above represents sample of parts of the completed work

  73. FEDERAL ROAD SAFETY CORPS VEHICLES ACQUIRED IN DECEMBER 2016 81 Above represents sample of parts of the acquired vehicles

  74. FEDERAL ROAD SAFETY CORPS VEHICLES ACQUIRED IN DECEMBER 2016 82 Above represents sample of parts of the acquired vehicles

  75. NATIONAL HAJJ COMMISSION OF NIGERIA (NAHCON) ACQUIRED PROPERTY 83

  76. NATIONAL PENSION COMMISSION (Volume License Agreement) 84

  77. NATIONAL POPULATION COMMISSION PURCHASED VEHICLES 85 Above represents sample of parts of the purchased vehicles

  78. NATIONAL POPULATION COMMISSION PURCHASED VEHICLES 86 Above represents sample of parts of the purchased vehicles

  79. ECONOMIC AND FINANCIAL CRIMES COMMSSION (EFCC) PURCHASED OPERATIONAL VEHICLES 87 Above represents sample of parts of the purchased Operational Vehicles

  80. CONSTRUCTION OF THE ECONOMIC AND FINANCIAL CRIMES COMMSSION (EFCC )’S CORPORATE HEADQUARTERS 88 Above represents sample of parts of the on-going construction work at the site

  81. 89

  82. 90

  83. ANNEX (I) ECOLOGICAL FUND OFFICE (EFO) PROJECTS BELOW FEDERAL EXECUTIVE COUNCIL (FEC) THRESHHOLD FROM MAY 2015 TO DECEMBER 2017 91

  84. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 FUNDS NO OF JOBS CONTRACT & STATUS OF DATE OF ACCESSED BY CREATED REMARKS (PROSPECTS OF SN PROJECT TITTLE USER AGENCY PROCUREMEN IMPLEMENTATIO APPROVAL THE PROJECT SKILLED/ COMPLETION) T DURATION N (%) (%) UNSKILLED Provision of Public Conviniencies in (3) LGAs, Ibadan, Oyo State: i. Mogaji Market, The Scope of work include: Iyana Agbala i. Site Clearance; along New ii. Excavation of Pit; Ibadan-Ife Road, iii. Backfill and removal of Egbeda LGA; excess of soil; ii. Jonku Ecological iv. Construction of 18 1 July, 2015. 3 Months N/A 100% Neigghbourhood Fund Office Conveniences; Market along Iwo v. Drilling of Boreholes sealed Road with overhead Steel Tank and Interchange, Ojoo Solar Panels. Expressway, The project is 100% completed. Ibadan North East Commissioned and handed over. LGA; and iii. Orita Aperin Market, Orita Aperin Ibadan South LGA. The Scope of work include: Soil Erosion Site clearing / earth works and Control Works at November, Ecological Construction of Culverts and 2 1 Month. N/A 100% 30 Usho/Ise Road, 2015. Fund Office Drainages. The project is 100% Ondo State. completed and awaiting commissioning and handing over. The Scope of work include: i. Site Clearance; ii. Earthworks and Excavation; Soil Erosion iii. Construction of Reinforced November, Ecological 3 Control Works At 1 Month. N/A 100% 25 Concrete Lined Channels; 2015. Fund Office Zuba iv. Construction of Concrete Culverts. 92 The project is 100% completed. Commissioned and handed over.

  85. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: Construction of drainage channels; Demolition & removal of existing blocked/weak/inadequate stream crossing structures and Doma Flood drainages; Connection of existing Erosion Control November, Ecological Channels to the newly constructed 4 4 Months N/A 100% 25 Works, Nasarawa 2015. Fund Office Channels; Stone-Pitching and State Rock dump for erosion control works; and Construction of Access Culverts and provision of access Slabs across the drainage Channels. The project is 100% completed and handed over The Scope of work include: Lohmak- Site clearing and Earth works; Kumkwum Reinforcement of concrete and Erosion Control November, Ecological 5 4 Months N/A 100% 25 lined channels; and Reinforcement Works, Langtang 2015. Fund Office of box culverts. North LGA, The Project is 100% completed Plateau State and handed over. The Scope of work include: i. Site Clearance; ii. Earthworks and Excavation; Gully Erosion iii. Construction of concrete Control Works at December, Ecological drains/channels; 6 6 Month. N/A 100% 28 Magodo, Lagos 2015. Fund Office iv. Stone Pitching; and State v. Construction of concrete retaining wall. The project is 100% completed. Commissioned and handed over. 93

  86. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED The Scope of work include: i. Site Clearance; ii. Earthworks and Excavation; Oghere Ahmed iii. Construction of Reinforced Erosion Control December, Ecological 7 6 Months. N/A 100% 25 Concrete Lined Channels; Works, Idimu, 2015. Fund Office iv. Construction of Concrete Lagos Culverts. The project is 100% completed. Commissioned and handed over. The Scope of work include: i. Site Clearance; ii. Demolition and removal of existing blocked/weak and inadequate structures; Kudeti Flood iii. Construction of reinforced December, Ecological 8 Control Works, 5 Months. N/A 100% 28 rectangular and trapezoidal 2015. Fund Office Ibadan Oyo State drains/channels; iv. Construction of culverts and access slabs; and v. Stone Pitching. The project is 100% completed. Commissioned and handed over. Scope of work include: Construction of one side Umudiato Flood trapezoidal concrete drains; Control Works, February 4th, Ecological Construction of appropriately sized 9 4 Months N/A 100% 25 Orlu LGA, Imo 2016 Fund Office box culverts; and Road State improvement works. The project is ‘100% completed and awaiting commissioning. 94

  87. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS COST OF DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED PROJECT (N) APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED Scope of work include: Umuoki- Construction of 2.4km drains; Umuowasi Provision of concrete drains Erosion Control Ecological and culverts; and Road 10 200,382,392.19 March, 2016 4 Months N/A 100% 28 and Road Fund Office improvement works. Improvement The project is 100% completed. Works. Commissioned and handed over. Scope of work include: Owalla Avuvu Earth works; Concrete Erosion Control Ecological Drains/Culverts; Box Culverts 11 N176,504,612.81 March, 2016 5 Months. N/A 100% 25 Works, Imo Fund Office and Stone-pitching. State The project is 100% completed and handed over. The Scope of work include: i. Construction of Solar Powered Borehole; Model Village ii. 5000 Liters Overhead Development, Ecological Water Supply Tank; 12 N168,147,104.52 July, 2016. 10 Months N/A 100% 25 Adamawa and Fund Office iii. 50 Seating Capacity Gombe States. Community Viewing Centre. The project is 100% completed. Awaiting commissioning and handing over. 95

  88. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 FUNDS NO OF JOBS CONTRACT & STATUS OF DATE OF ACCESSED BY CREATED REMARKS (PROSPECTS OF SN PROJECT TITTLE USER AGENCY PROCUREMEN IMPLEMENTATIO APPROVAL THE PROJECT SKILLED/ COMPLETION) T DURATION N (%) (%) UNSKILLED Scope of work include: Reconstruction Construction of earth Dam; of Maska Earth Construction of Spillway, November, Ecological 13 Dam, Maska 3 Months N/A 100% 28 Embankment and Surface 2016 Fund Office Funtua, dressed road. The project is Katsina State 100% completed and handed over Scope of work include the following: Contract for i. Construction of 2 No. Erosion Culverts length 18m, andFlood March 6th, Ecological 14 6 Months N/A 100% 28 ii. Construction of Walkway control Work in 2017. Fund Office Access Road of 700m. Bogoro LGA Project is 100% Completed. Bauchi State Awaiting commissioning and handing over. Soil Erosion The Scope of work include: Control Works Concrete Retaining wall and at Nigerian Ecological 15 March, 2017 4 Months N/A 100% 28 earth works. The Contract is Police Housing Fund Office 100% completed and handed Estate Kurudu, over Abuja, FCT. 96

  89. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED Scope of work include: Gadan Toro to Site Clearance and Earth work; Market Road Concrete works/Retaining wall; Erosion Control Ecological 16 March, 2017 9 Months N/A 100% 28 and Rehabilitation of Eroded Works, Toro Fund Office Road. The project is 100% LGA, Bauchi completed and awaiting State. commissioning. Scope of work include: Construction and Rehabilitation of Dam Erosion/Flood embankment; Control Project Expansion of Spillway; March 9th, Ecological 18 17 of Rice Field, 4 Months N/A 100% Construction of Discharge 2017 Fund Office Shanga LGA, Channels and flood control Kebbi State Dyke. The project is 100% completed and awaiting commissioning and handing over. 97

  90. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED Scope of work include: Gully Erosion Removing of blocked Control Works drains/Culverts and Earth at Federal Ecological 18 March, 2017 4 Months N/A 100% 25 works. The project is 100% Government Fund Office completed and awaiting College, Otobi, Commissioning and Handing Benue State Over Scope of work include: Site clearing; Channelization Construction of Culverts; and Flood Carting away of all loosed Control of Ponj- March 4th, Ecological 19 6 Months N/A 100% 30 materials & debris; and Afo River, 2017 Fund Office asphalt overlay road. Ikirin, Osun The project is 100% completed State and awaiting commissioning and handing over. Scope of work include: Construction of earth road; Construction of concrete drain Ganye-Yelwa 800m long; Road Erosion Construction of 5No. and Flood March 3rd, Ecological 20 10 Months N/A 100% 28 Reinforced concrete Culverts, Control Works, 2017 Fund Office double cell/single cell; and Ganye LGA, Stone-Pitching of road/drain Adamawa State side 500m. The project is 100% completed. Awaiting commissioning. 98

  91. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 CONTRACT & FUNDS NO OF JOBS STATUS OF DATE OF USER PROCUREME ACCESSED BY CREATED REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT APPROVAL AGENCY NT THE PROJECT SKILLED/ COMPLETION) ION (%) DURATION (%) UNSKILLED Ganye-Dabora- Daksam Road Scope of work include: Erosion and Construction of concrete drains; Flood Control Concrete culverts; Works, Ganye Ecological Earth works; and 21 March, 2017 7 Months N/A 100% 30 LGA and Fund Office rehabilitation of water supply. Reconstruction of The project is 100% completed and Jada Water Works awaiting Commissioning and System, Handing Over. Adamawa State Scope of work include: Site Clearance; Azare Township Concrete Drains at GDSS Azare; Flood and Matsago Low Cost Housing; Ecological 22 Erosion Control March, 2017 5 Months N/A 100% 28 Old Airport and Cemetery; Culverts Fund Office Works, Bauchi and Access Slabs. State. The project is 100% completed. To be commissioned and handed over. Scope of work include: Site clearance and earth works; Tsoho Gwaram Concrete works; Erosion and Ecological Reinforced concrete drainages, 23 Flood Control March, 2017 10 Months N/A 100% 28 Fund Office culverts and access slabs. The Project, Gwaram project is 100% completed. LGA, Jigawa State Awaiting commissioning and handing over. 99

  92. THE STATUS OF IMPLEMENTATION OF APPROVALS BY THE ECOLOGICAL FUND OFFICE TENDERS BOARD FROM MAY 2015 TO DECEMBER 2017 NO OF CONTRACT & FUNDS STATUS OF JOBS DATE OF USER PROCUREME ACCESSED BY REMARKS (PROSPECTS OF SN PROJECT TITTLE IMPLEMENTAT CREATED APPROVAL AGENCY NT THE PROJECT COMPLETION) ION (%) SKILLED/ DURATION (%) UNSKILLED Scope of work include: Kumo Gully Construction of concrete drains Erosion Site, and culverts; and Ecological 24 Anguwan Jauro March, 2017 5 Months N/A 100% 30 Stone-Pitching of embankment. Fund Office Musa, Akko LGA, The project is 100% completed and Gombe State awaiting Commissioning and Handing Over Scope of work include: Kumo Gully Construction of concrete drains Erosion Site, and culverts; and Ecological 25 Anguwan Jauro March, 2017 6 Months N/A 100% 28 Stone-Pitching of embankment. Fund Office Sabo, Akko LGA, The project is 100% completed. Gombe State Awaiting commissioning and handing over. Scope of work include: Amper Flood Construction of concrete drains; Hazards and Ecological Concrete culverts; and Stone- 26 March, 2017 6 Months N/A 100% 28 Erosion Control Fund Office Pitching. The project is 100% Works, Tarka LGA completed. Awaiting commissioning and handing over. Scope of work include: Site Clearance and earth works; East of Kumo Excavation for side drains and General Hospital Culverts; to Jauro Musa Ecological Construction of trapezoidal 27 March, 2017 4 Months N/A 100% 28 Stream Gully Fund Office concrete lined drains; Erosion Control Concrete cover Slaps.. Project. The project is 100% completed. Awaiting commissioning and handing over. 10 0

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend