GLAST LAT Project GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers Meeting Face to Face Managers Meeting Gamma- -ray Large ray Large Gamma I&T Readiness and Plans I&T Readiness and Plans Area Space


  1. GLAST LAT Project GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers Meeting Face to Face Managers Meeting Gamma- -ray Large ray Large Gamma I&T Readiness and Plans I&T Readiness and Plans Area Space Area Space August 11, 2004 August 11, 2004 Telescope Telescope Ken Fouts Ken Fouts Manager, I&T Engineering Manager, I&T Engineering SLAC SLAC 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 1

  2. GLAST LAT Project LAT I&T Organization LAT I&T Organization 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 2

  3. GLAST LAT Project Recent Accomplishments Recent Accomplishments • Management – Held 2 document reviews with NASA I&T. 12 I&T documents and procedures in approval cycle. • IFCT – JPL crimping training completed for two I&T mechanical technicians. – JPL connector mate/demate instructor training completed by I&T technician. – CAL metrology bay shimming training completed. • MGSE – 267 MGSE drawings complete or in final release cycle, 20 to go. 4x4 proof test weights are cut to size and are in final machining. – • Online – First online CCB meeting was held and action items established. – Held IRR peer reviews for Online (go to I&T website for details) – LATTE V 4.0 released upgrade for housekeeping. • SVAC – Held IRR Peer Reviews for SVAC (go to I&T website for details) • Particle Test Rebuilt Van de Graaff accelerator column – 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 3

  4. GLAST LAT Project IFCT Organization IFCT Organization 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 4

  5. GLAST LAT Project Facility Utility / Computing Infrastructure Facility Utility / Computing Infrastructure Facility utilities: • Building 33 power substation - ECD 4-Oct-04 • Building 33 backup generators – ECD 13-Aug-04 • Building 33 backup hot water boiler – ECD 30-Nov-04 • Building 37 Transfer switch – ECD 30-Sep-04 Computing infrastructure: � Firewall w/ private LANs for monitoring, online, data transfer. • SCS remote tape backup for monitoring system database 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 5

  6. GLAST LAT Project Room 104 Clean Room Configuration Room 104 Clean Room Configuration • Draft Procedure available in LATDOCS. (LAT-DS-03281) • Some graphics improvements in work. • Space in room 104 is tight with limited parallel processing space available. – Only enough space for the LAT integration stand or the LAT Mock-up stand at one time. – Metrology bay must be moved out of room for ACD and X LAT plate installation. – LAT integration stand must be moved if rework of ACD required. – Unused MGSE must be stored outside room 104 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 6

  7. GLAST LAT Project I&T Mechanical Training I&T Mechanical Training 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 7

  8. GLAST LAT Project IFCT Electrical Training IFCT Electrical Training 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 8

  9. GLAST LAT Project Summary and Concerns Summary and Concerns LAT I&T procedures (45 total) • 1 released • 30 procedures drafted and in review Training • Mechanical training 50% complete • Electrical training 20% complete Facility Ready for installation and test of EM2, flight grid, MGSE • Assembly, Online/EGSE. 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 9

  10. GLAST LAT Project MGSE Readiness MGSE Readiness 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 10

  11. GLAST LAT Project Drawing Release Plan & Status required to achieve production milestones Drawing Release Plan & Status required to achieve production mil estones • Total MGSE Drawing Sheet Count ~ 287 – 141 Drawing Sheets Released – 94 Drawing Sheets released on July 16 – 32 drawing Sheets in Release Cycle by July 30 – 267 Drawing Sheets Virtually Released • ( 141 + 94 + 32 = 267 ) – 20 sheets scheduled to be complete by Aug 30. – 1x4 Grid Update on Stop Work 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 11

  12. GLAST LAT Project Online Readiness Online Readiness 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 12

  13. GLAST LAT Project Roadmap Roadmap • LAT-TD-03075 Document written and agreed to February 2004 • Status of required elements follows • § 7 – Bonus items are not addressed • § 8 – Subsystem support is never ending 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 13

  14. GLAST LAT Project 6.1 – – GASU GASU 6.1 � 6.1.1 – Trigger API � 6.1.2 – ACD script migration � 6.1.3 – EBF (now called LDF) package update • New request � ACD software counters 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 14

  15. GLAST LAT Project 6.2 – – Hardware monitoring system Hardware monitoring system 6.2 • Development started by ELX for Test-bed needs FSW is developing a housekeeping telemetry server • � Released. Online needs training. • HskSvr usage will fit seamlessly into ELX monitor • Online is adding – Alarming – Alerting – Archiving – Trending LATTE 4.x preliminary version running in B33 for EM2. LATTE 4.x preliminary version running in B33 for EM2. 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 15

  16. GLAST LAT Project 6.4 – – Event Event prescaling prescaling in in VxWorks VxWorks 6.4 • Needed to manage nominal or higher trigger rate testing � Completed However, new request: • Simple event data filtering – Requires FSW support � Delivery 15 August, 2004 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 16

  17. GLAST LAT Project 6.5 – – Subsystem scripts Subsystem scripts 6.5 • Official deliveries needed prior to V&V phase • None yet received • Development snapshots stored in CVS • Online gaining experience with these snapshots • E2E scripts in progress (Lester, trigger group) 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 17

  18. GLAST LAT Project 6.6 – – Security against unauthorized software changes Security against unauthorized software changes 6.6 • In the I&T testing phase (not commissioning phase), protection is needed against on-the-fly editing of code and configurations as the changes can’t reliably be tracked � Run reports indicate mismatches with released files � Kiosk mode � Read-only source files Available in LATTE 4.x and is being exercised in B33 during EM2 testing. Available in LATTE 4.x and is being exercised in B33 during EM2 testing. 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 18

  19. GLAST LAT Project 6.7 – – Security against operator complacency Security against operator complacency 6.7 � Permission scheme set up � Operator authentication � Certain features are enabled or disabled according to operator permission level � Normally disabled for backward compatibility (e.g. during commissioning) � Core system modified to use it – Test scripts must use it for it to be effective • Operators must sign off on input parameters – Test scripts must use it for it to be effective. In Progress 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 19

  20. GLAST LAT Project 6.9 – – Building 33 EGSE room 102 set Building 33 EGSE room 102 set- -up (1) up (1) 6.9 • Taken over by IFCT � Two PCs set up with four six (6) monitors • Online needs to practice in situ. In Progress on EM2 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 20

  21. GLAST LAT Project 6.9 – – Building 33 EGSE room 102 set Building 33 EGSE room 102 set- -up (2) up (2) 6.9 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 21

  22. GLAST LAT Project 6.10 – – Release mechanism for subsystem test Release mechanism for subsystem test 6.10 scripts to I&T scripts to I&T � Plan completed – Transfer scripts via CVS tag • New request: – Transfer scripts by DVD 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 22

  23. GLAST LAT Project 6.11 – – Electronic logbook Electronic logbook 6.11 � Web based version completed (Oracle) � Stand-alone version completed (MySQL) • DB synchronization program still needed • New requests � Mate/Demate GUI changes – Component installation log – Software installation log – Configuration log Log book requirements to be documented by I&T. Log book requirements to be documented by I&T. 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 23

  24. GLAST LAT Project 6.13 – – Validation & verification (1) Validation & verification (1) 6.13 • Subsystem test-stands – Many instances ( ~40 ) – Many hours of operation – Many people involved, each with a different approach • EM-1 and EM-2 tests with mini-tower – More complete with hand-off of persistent data to SVAC – But, less seat time and consequently less practiced • Full tower testing (no detectors) • Test-bed testing – In progress in ELX with LATTE 4.x – Hardware not yet fully functional • Standalone mode testing – Useful for developing code not requiring hardware interaction 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 24

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.