GLAST LAT Project GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers Meeting Face to Face Managers Meeting Gamma- -ray Large ray Large Gamma I&T Readiness and Plans I&T Readiness and Plans Area Space


slide-1
SLIDE 1

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 1

GLAST Large Area Telescope: GLAST Large Area Telescope: Face to Face Managers Meeting Face to Face Managers Meeting

I&T Readiness and Plans I&T Readiness and Plans August 11, 2004 August 11, 2004

Ken Fouts Ken Fouts Manager, I&T Engineering Manager, I&T Engineering SLAC

Gamma Gamma-

  • ray Large

ray Large Area Space Area Space Telescope Telescope

SLAC

slide-2
SLIDE 2

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 2

LAT I&T Organization LAT I&T Organization

slide-3
SLIDE 3

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 3

Recent Accomplishments Recent Accomplishments

  • Management

– Held 2 document reviews with NASA I&T. 12 I&T documents and procedures in approval cycle.

  • IFCT

– JPL crimping training completed for two I&T mechanical technicians. – JPL connector mate/demate instructor training completed by I&T technician. – CAL metrology bay shimming training completed.

  • MGSE

– 267 MGSE drawings complete or in final release cycle, 20 to go. – 4x4 proof test weights are cut to size and are in final machining.

  • Online

– First online CCB meeting was held and action items established. – Held IRR peer reviews for Online (go to I&T website for details) – LATTE V 4.0 released upgrade for housekeeping.

  • SVAC

– Held IRR Peer Reviews for SVAC (go to I&T website for details)

  • Particle Test

– Rebuilt Van de Graaff accelerator column

slide-4
SLIDE 4

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 4

IFCT Organization IFCT Organization

slide-5
SLIDE 5

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 5

Facility Utility / Computing Infrastructure Facility Utility / Computing Infrastructure

Facility utilities:

  • Building 33 power substation - ECD 4-Oct-04
  • Building 33 backup generators – ECD 13-Aug-04
  • Building 33 backup hot water boiler – ECD 30-Nov-04
  • Building 37 Transfer switch – ECD 30-Sep-04

Computing infrastructure: Firewall w/ private LANs for monitoring, online, data transfer.

  • SCS remote tape backup for monitoring system database
slide-6
SLIDE 6

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 6

Room 104 Clean Room Configuration Room 104 Clean Room Configuration

  • Draft Procedure available in LATDOCS. (LAT-DS-03281)
  • Some graphics improvements in work.
  • Space in room 104 is tight with limited parallel processing

space available. – Only enough space for the LAT integration stand or the LAT Mock-up stand at one time. – Metrology bay must be moved out of room for ACD and X LAT plate installation. – LAT integration stand must be moved if rework of ACD required. – Unused MGSE must be stored outside room 104

slide-7
SLIDE 7

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 7

I&T Mechanical Training I&T Mechanical Training

slide-8
SLIDE 8

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 8

IFCT Electrical Training IFCT Electrical Training

slide-9
SLIDE 9

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 9

Summary and Concerns Summary and Concerns

LAT I&T procedures (45 total)

  • 1 released
  • 30 procedures drafted and in review

Training

  • Mechanical training 50% complete
  • Electrical training 20% complete

Facility

  • Ready for installation and test of EM2, flight grid, MGSE

Assembly, Online/EGSE.

slide-10
SLIDE 10

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 10

MGSE Readiness MGSE Readiness

slide-11
SLIDE 11

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 11

Drawing Release Plan & Status required to achieve production mil Drawing Release Plan & Status required to achieve production milestones estones

  • Total MGSE Drawing Sheet Count ~ 287

– 141 Drawing Sheets Released – 94 Drawing Sheets released on July 16 – 32 drawing Sheets in Release Cycle by July 30 – 267 Drawing Sheets Virtually Released

  • ( 141 + 94 + 32 = 267 )

– 20 sheets scheduled to be complete by Aug 30. – 1x4 Grid Update on Stop Work

slide-12
SLIDE 12

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 12

Online Readiness Online Readiness

slide-13
SLIDE 13

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 13

Roadmap Roadmap

  • LAT-TD-03075 Document written and agreed to February 2004
  • Status of required elements follows
  • § 7 – Bonus items are not addressed
  • § 8 – Subsystem support is never ending
slide-14
SLIDE 14

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 14

6.1 6.1 – – GASU GASU

6.1.1 – Trigger API 6.1.2 – ACD script migration 6.1.3 – EBF (now called LDF) package update

  • New request

ACD software counters

slide-15
SLIDE 15

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 15

6.2 6.2 – – Hardware monitoring system Hardware monitoring system

  • Development started by ELX for Test-bed needs
  • FSW is developing a housekeeping telemetry server
  • Released. Online needs training.
  • HskSvr usage will fit seamlessly into ELX monitor
  • Online is adding

– Alarming – Alerting – Archiving – Trending

LATTE 4.x preliminary version running in B33 for EM2. LATTE 4.x preliminary version running in B33 for EM2.

slide-16
SLIDE 16

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 16

6.4 6.4 – – Event Event prescaling prescaling in in VxWorks VxWorks

  • Needed to manage nominal or higher trigger rate testing

Completed However, new request:

  • Simple event data filtering

– Requires FSW support Delivery 15 August, 2004

slide-17
SLIDE 17

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 17

6.5 6.5 – – Subsystem scripts Subsystem scripts

  • Official deliveries needed prior to V&V phase
  • None yet received
  • Development snapshots stored in CVS
  • Online gaining experience with these snapshots
  • E2E scripts in progress (Lester, trigger group)
slide-18
SLIDE 18

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 18

6.6 6.6 – – Security against unauthorized software changes Security against unauthorized software changes

  • In the I&T testing phase (not commissioning phase), protection

is needed against on-the-fly editing of code and configurations as the changes can’t reliably be tracked Run reports indicate mismatches with released files Kiosk mode Read-only source files

Available in LATTE 4.x and is being exercised in B33 during EM2 testing. Available in LATTE 4.x and is being exercised in B33 during EM2 testing.

slide-19
SLIDE 19

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 19

6.7 6.7 – – Security against operator complacency Security against operator complacency

Permission scheme set up Operator authentication Certain features are enabled or disabled according to

  • perator permission level

Normally disabled for backward compatibility (e.g. during commissioning) Core system modified to use it – Test scripts must use it for it to be effective

  • Operators must sign off on input parameters

– Test scripts must use it for it to be effective. In Progress

slide-20
SLIDE 20

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 20

6.9 6.9 – – Building 33 EGSE room 102 set Building 33 EGSE room 102 set-

  • up (1)

up (1)

  • Taken over by IFCT

Two PCs set up with four six (6) monitors

  • Online needs to practice in situ. In Progress on EM2
slide-21
SLIDE 21

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 21

6.9 6.9 – – Building 33 EGSE room 102 set Building 33 EGSE room 102 set-

  • up (2)

up (2)

slide-22
SLIDE 22

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 22

6.10 6.10 – – Release mechanism for subsystem test Release mechanism for subsystem test scripts to I&T scripts to I&T

Plan completed – Transfer scripts via CVS tag

  • New request:

– Transfer scripts by DVD

slide-23
SLIDE 23

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 23

6.11 6.11 – – Electronic logbook Electronic logbook

Web based version completed (Oracle) Stand-alone version completed (MySQL)

  • DB synchronization program still needed
  • New requests

Mate/Demate GUI changes – Component installation log – Software installation log – Configuration log

Log book requirements to be documented by I&T. Log book requirements to be documented by I&T.

slide-24
SLIDE 24

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 24

6.13 6.13 – – Validation & verification (1) Validation & verification (1)

  • Subsystem test-stands

– Many instances ( ~40 ) – Many hours of operation – Many people involved, each with a different approach

  • EM-1 and EM-2 tests with mini-tower

– More complete with hand-off of persistent data to SVAC – But, less seat time and consequently less practiced

  • Full tower testing (no detectors)
  • Test-bed testing

– In progress in ELX with LATTE 4.x – Hardware not yet fully functional

  • Standalone mode testing

– Useful for developing code not requiring hardware interaction

slide-25
SLIDE 25

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 25

6.13 6.13 – – Validation & verification (2) Validation & verification (2)

  • Limited unit testing of core functions
  • Will exercise system in not often explored corners of phase

space – Bad data – High data rate – Large data sizes

  • Will induce errors in major blocks to verify graceful behaviour

– Induced exceptions

  • Will generate a matrix of features with checked-off test criteria

Confidence will improve with more testing However, we need to define an end point

slide-26
SLIDE 26

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 26

Almost there Almost there… …

  • Outstanding items:

Hardware monitoring (includes trending) – Power-up sequence – Simple event filtering – Subsystem and system scripts – Security completion – Pipeline – V&V Online plans to practice I&T testing from end to end with SVAC and IFCT involvement to ensure there is no missing critical functionality

slide-27
SLIDE 27

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 27

Particle Test Particle Test

slide-28
SLIDE 28

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 28

Documents and Procedures Documents and Procedures

Particle Test LAT Integration Documents

  • LAT-TD-00440-4

Beam Test Plan

  • LAT-TD-01396

Calibration of the Van de Graaff Photon Flux

  • LAT-TD-01805-2

Van de Graaff Accelerator Safety/Operations Handbook

  • LAT-PS-04133

Procedure to Take Simultaneous BGO and LAT Data

  • LAT-PS-04134

Procedure for Setting the LAT Timing Registers

  • LAT-PS-04135

Procedure for Measuring the LAT Trigger Jitter using the Muon Telescope

  • LAT-TD-04136

Van de Graaff and Cosmic Data Runs for LAT Integration

slide-29
SLIDE 29

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 29

VG Operators VG Operators

  • Requires Rad Worker I and VG Operator Training

– People already trained

  • John Canfield
  • Gary Godfrey
  • Brian Horwitz
  • Dave Kiehl
  • Leo Manger
  • Tom Nieland
  • Eliazar Ortiz
  • Larry Wai
slide-30
SLIDE 30

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 30

VG and Cosmic Data Runs VG and Cosmic Data Runs

  • Testing recommendations have been provided by the End to

End Testing Committee (LAT-MD-03489-01)

  • The following tests are required for the full LAT

– 1) Basline CR Tests BCR – 2) Consdition Scan CR Tests CSCR – 3) Basline CR Trigger Subtests BCR – 4) Nominal Rate CR Tests NCR – 5) Nominal Rate Condition Scan Tests NRCSCR – 6) CAL Nominal Rate CR Tests CNRCR – 7) Baseline CR Data Volume Sub Tests BCRDV – 8) Nominal Rate CR Data Volume Sub Tests NRCRDV – 9) Van de Graaff Tests VG

  • A subset of these tests are being defined for 1 and 2 towers
slide-31
SLIDE 31

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 31

1 and 2 Tower 1 and 2 Tower Cosmics Cosmics and VG Data and VG Data

Preliminary lists of runs. Still being actively worked on. Time = 91 x 1.3 ~ 120 hours

Time [hrs] E2E ID Config Test

91

Filter Prescale Throttle Temp (C) non - regulated source (V) DAC setting (Veto) TACK delay DAC setting (zero sup) DAC setting TACK delay GTRC split DAC setting TACK delay DAC LAC setting (zero sup) Input ACD TKR CAL Rate (KHz) L1T Duration (h) Comments

1 1 1

BCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom ALL nom nom nom 0.05 1.80E+05 1

4 2 1

CSCR OFF OFF OFF nom nom nom nom nom (min) nom nom nom nom nom ALL nom nom nom 0.05 1.80E+05 1

2

CSCR OFF OFF OFF nom nom nom nom nom (max) nom nom nom nom nom ALL nom nom nom 0.05 1.80E+05 1

3

CSCR OFF OFF OFF nom nom nom nom nom nom nom nom near peds (min) nom nom ALL nom nom nom 0.05 1.80E+05 1

4

CSCR OFF OFF OFF nom nom nom nom nom nom nom nom near sat. (max) nom nom ALL nom nom nom 0.05 1.80E+05 1

4 3 1

BCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom TKR nom OFF OFF 0.5 1.80E+06 1

1

BCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom CalL OFF OFF nom 0.5 1.80E+06 1

1

BCR OFF OFF OFF nom nom nom nom nom nom nom nom 4 MeV nom nom CalL OFF OFF nom 0.5 1.80E+06 1

1

BCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom CalH OFF OFF nom 0.5 1.80E+06 1

36 4 1

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 0.2 1.08E+06 1.5

2

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 0.5 2.70E+06 1.5

3

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 1 5.40E+06 1.5

4

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 5 2.70E+07 1.5

5

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 10 5.40E+07 1.5

6

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+TKR nom nom nom 20 1.08E+08 1.5

7

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 0.2 1.08E+06 1.5

8

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 0.5 2.70E+06 1.5

9

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 1 5.40E+06 1.5

10

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 5 2.70E+07 1.5

11

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 10 5.40E+07 1.5

12

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL nom nom nom 20 1.08E+08 1.5

13

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 0.2 1.08E+06 1.5

14

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 0.5 2.70E+06 1.5

15

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 1 5.40E+06 1.5

16

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 5 2.70E+07 1.5

17

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 10 5.40E+07 1.5

18

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalH nom nom nom 20 1.08E+08 1.5

19

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 0.2 1.08E+06 1.5

20

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 0.5 2.70E+06 1.5

21

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 1 5.40E+06 1.5

22

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 5 2.70E+07 1.5

23

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 10 5.40E+07 1.5

24

NCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+ALL nom nom nom 20 1.08E+08 1.5 settings TKR Trigger FSW ACD S/C CAL

slide-32
SLIDE 32

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 32

(Continued) (Continued)

3 6 1

CNRCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom S+CalL OFF OFF nom 5 2.70E+07 1.5

2

CNRCR OFF OFF OFF nom nom nom nom nom nom nom nom nom nom min S+CalL OFF OFF nom 1 5.40E+06 1.5

1 7 1

BCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF ALL nom nom nom 0.05 1.80E+05 1

18 8 1

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+TKR nom nom nom 1 5.40E+06 1.5

2

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+TKR nom nom nom 5 2.70E+07 1.5

3

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+TKR nom nom nom 10 5.40E+07 1.5

4

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+TKR nom nom nom 20 1.08E+08 1.5

5

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalL nom nom nom 1 5.40E+06 1.5

6

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalL nom nom nom 5 2.70E+07 1.5

7

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalL nom nom nom 10 5.40E+07 1.5

8

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalL nom nom nom 20 1.08E+08 1.5

9

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalH nom nom nom 1 5.40E+06 1.5

10

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalH nom nom nom 5 2.70E+07 1.5

11

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalH nom nom nom 10 5.40E+07 1.5

12

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+CalH nom nom nom 20 1.08E+08 1.5

13

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+ALL nom nom nom 1 5.40E+06 1.5

14

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+ALL nom nom nom 5 2.70E+07 1.5

15

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+ALL nom nom nom 10 5.40E+07 1.5

16

NCRDV OFF OFF OFF nom nom nom nom OFF nom nom nom nom nom OFF S+ALL nom nom nom 20 1.08E+08 1.5

24 9 1

BVDG OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom ALL nom nom nom 0.17 3.67E+06 6 LiF Tower front center

2

BVDG OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom ALL nom nom nom 1 2.16E+07 6 LiF front center; third trays ON

3

BVDG OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom ALL nom nom nom 4 8.64E+07 6 LiF side above bottom super GLAST

4

BVDG OFF OFF OFF nom nom nom nom nom nom nom nom nom nom nom ALL nom nom nom 0.07 1.51E+06 6 Li Tower fron center

slide-33
SLIDE 33

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 33

VG Spare Parts VG Spare Parts

Spare Part Have Order by # Arrival date Belt (Van de Graff) Done 3 7/14/04 Capacitor (ceramic variable tuning) 1 Choke (RF HV) Stancor C-2327 1.5 H 1500 V 85W 200 mA DC 2 Choke (RF HV) Stancor C-2343 .75 H 1500 V 85W 300 mA DC 2 Diode (Focus HV) 2 Gas (SF6 cylinder) 2 HV supply (for charging the belt) 1 Motor (Control rod) 2 Pump (scroll) Pump (turbo) Relay (Delay) Amperite 5N030T 9 pin 7/1/04 Resistor (Column) 625 MW 4 Resistor (Probe tip) 100K 25W 3 Resistor (Focus) 2 MW 15% 7/1/04 Rheostat (Control Rod) 7/1/04 Screen (charging) 7/1/04 Springs (column) 5 Transformer (Probe tip) P-1079 TT-5479 (70,100,115) ->1700 v 5 mA 7/1/04 Transformer (Focus HV) P-22478 TT-9476 330/400 Hz (95,110,125,135)->15 kV 10mA 7/1/04 Transformer (RF HV) P-9321 TT-5494 (95,115,135)->480-0-480 V 400 mA, 6.3 V 5 A 7/1/04 Tube (5T4) 9 Tube (6146B) 4

slide-34
SLIDE 34

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 34

Verification of Equipment Readiness Verification of Equipment Readiness

  • Bi-weekly operation of VG to record BGO spectrum
  • Bi-weekly operation of scintillator telescope to record

cosmic rate

slide-35
SLIDE 35

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 35

Environmental Test Environmental Test

slide-36
SLIDE 36

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 36

Baseline Environmental Test Flow at NRL

Deliver to NRL Install Radiators EMI/EMC Test Remove Radiators Install Radiators Remove Radiators Weight & CG Thermal Balance LPT CPT Sine Vibe LPT Acoustic Test LPT TVAC CPT LPT MS Modal Survey CPT Offload LAT Survey CPT MS Survey CPT MS

slide-37
SLIDE 37

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 37

Proposed LAT Environmental Test Flow

EMI/EMC Test Install Radiators Remove Radiators Weight & CG Thermal Balance LPT CPT Open Door CPT CPT Sine Vibe LPT Acoustic Test LPT Thermal Cycling CPT LPT MS CPT Deliver to NRL Offload & Set-up LAT

Summary of Changes

  • Removed Modal Test
  • Removed Muon

Survey Pre/Post TVAC

  • Eliminated one (1)

Install/Remove Radiators

5 days 4 days 1 days 5 days 2 days 6 days 1 day 3 days 8 days 2 days 28 days 1 day 3 days

Total Duration 69 Days (73 days in original est.) Total Duration 69 Days (73 days in original est.)

slide-38
SLIDE 38

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 38

SVAC SVAC

slide-39
SLIDE 39

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 39

RFA RFA’ ’s s from Peer Review from Peer Review

14 RFAs, 8 answered (waiting for reviewers comments), 6 in progress (see below)

RFA By To Answer STATUS

Please trace responsibility for every pass/fail test within I&T. Which department performs and evaluates each test? This is very important because these pass/fail tests determine whether we can proceed to the next stage of the build. The LAT schedule Steve Ritz Eduardo do Couto e Silva After discussions with SE SVAC realized that PASS/FAIL nomenclature used for SVAC tests are not the correct terminology to use. All Pass/Fail tests are the responsibility of IFCT which performs all of these tests. The scripts that drive these tests have P IN PROGRESS slide 39. Evaluate the processing times for each step and end to

  • end. Match the computing resources and personnel to the expected

data volume by day. Steve Ritz Eduardo do Couto e Silva ned pipeline to finish that. Data volume captured in LAT-MD-00575 IN PROGRESS slide 39. Please describe the calibration validation process. After each calibration is performed, the resulting constants set must be validated (ranges, changes from previous, etc.), and the calibration set must be flagged as good or bad. Who is respo Steve Ritz Eduardo do Couto e Silva SVAC is responsible for all that and how this is going to be implemented will be described in LAT- MD-00575 IN PROGRESS You should examine what elements of the pipeline and analysis

  • peration will be stressed by a potentially rapidly changing code
  • environment. For example, is it possible to rerun particular steps in

the pipeline if a small version change is made in that st Richard Dubois Eduardo do Couto e Silva Under discussion IN PROGRESS What is the configuration control scheme envisaged for ensuring that the SVAC etc scripts etc that are run in the pipeline are in fact the

  • nes agreed to. Will the agreed tags be checked out of cvs and

made read-only for use by the pipeline? Richard Dubois Eduardo do Couto e Silva Agreed we communciate with SAS via CVS, but we need to make sure we have a plan to handle updates in the future IN PROGRESS 1) Create mechanism and schedule for scripts to parse and decommutate schema, snapshot, and online report. 2) Strengthen and formalize communication between online and offline with regard to command state. 3) Define and create deliverables for Towers A Eric Grove Eduardo do Couto e Silva / Ric Claus SVAC pieces will be hnadled via LAT-MD_00575 and Eric has alredy a copy for review. Online piece to be handled by Ric IN PROGRESS

slide-40
SLIDE 40

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 40

List of Documents List of Documents

LAT DOCS Responsibility Need Date LAT SVAC Plan LAT-MD-00446 SVAC 3-Aug SVAC Plan for LAT Integration at SLAC LAT-MD-00575 SVAC 13-Aug SVAC Contributed Manpower LAT-MD-00613 SVAC 3-Aug LAT Calibration Algorithms LAT-MD-01590 SAS 1-Sep LAT Geometry for MC Simulation LAT-MD-03674 SAS 1-Sep SVAC Database for LAT Integration LAT-MD-01588 SVAC 13-Aug I&T/SAS ICD for LAT Integration LAT-MD-00572 SVAC 3-Aug

  • Document Status

– SVAC Plan – LAT-MD-00446

– Comments from SE and CAL incorporated. Ready for release

– SVAC Plan for LAT integration at SLAC – LAT-MD-00575

– Being reviewed by Steve, Bill and Eric – Courtesy copy to Gary and Pat

– SVAC Contributed Manpower

– Depend on LAT-MD-00575 – Likely to be ready for Collaboration meeting ( see Elliott’s talk)

– SVAC/SAS ICD for LAT Integration

– Ready for release

slide-41
SLIDE 41

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 41

Top 5 Issues between SAS/SVAC Top 5 Issues between SAS/SVAC

  • Main concern is schedule slip

– Pipeline delivery

» Issue: pipeline delivery has not happened yet

– Calibrations

» Issue: SAS not fully convinced of importance of TOT. SVAC needs it for the first tower tests

– LDF Parser

» Issue: SAS and Online need to finalize their interface since SVAC needs data files from SAS for EM2

– Analysis Ntuples

» Issue: SAS and SVAC have not agreed where to store detector information (e.g. trigger). Need resolution ASAP to support EM2 testing

– Geometry

» Issue: SVAC needs traceability of geometry information that has lowest priority in SAS work

slide-42
SLIDE 42

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 42

Lessons Learned Lessons Learned

slide-43
SLIDE 43

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 43

Lessons Learned Lessons Learned

Cal EM-2 Observations

The following items were observed during the receiving inspection and installation of the EM2 Calorimeter.

  • Connector covers missing on 2 connector ports. J1 on TPS and JS1
  • n TEM.
  • Misaligned mate found on CAL to TEM connector. One screw and jack

post found stripped contributing to the awkward mate.

  • No shock indicator on outside or inside of shipping container.
  • CAL unit found a little out of square in relation to the shipping
  • container. This is only a concern because there is no shock indicator.
  • No pressure on purge lid gauge. A vacuum was discovered while

depressing the red purge button. Our procedure, LAT-PS-03027, requires above 5 psi. Should we consider revising this number? Should the container by pressurized? We’ve never received a Calorimeter with the gauge indicating positive pressure.

  • Debris found on top of the calorimeter.
  • 1X1 base plate interferes with NRL calorimeter lifting corner brackets.
slide-44
SLIDE 44

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 44

Misaligned Connector Misaligned Connector

slide-45
SLIDE 45

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 45

I&T Plan I&T Plan

slide-46
SLIDE 46

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 46

I&T Operating Tenets I&T Operating Tenets

  • Safety First

– Personnel Safety – System Safety

  • Communication is key to success

– Use visuals whenever possible; flow charts, status, Quality metrics – Liberal use of pagers and cell phone – Need subsystem POC and alternate for off hour anomaly resolution.

  • I&T Engineering Responsibility

– Interpret LAT Engineering requirements from drawings and specs to I&T procedures for execution by Techs – Provide ongoing support for troubleshooting and problem resolution.

  • Don’t do anything for the first time on flight hardware.
  • Don’t proceed unless everyone has a clear understanding of the task.

Minimize risk.

slide-47
SLIDE 47

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 47

DOCUMENTATION FLOW DOCUMENTATION FLOW

Drawings

(Mechanical Assembly, Cabling, EGSE/MGSE interface, etc.)

Test Sequence LAT-MD-00676 Assembly Instruction Data Sheet (AIDS) Task Specific Procedures

(Assembly, Test, Process, Etc.)

Electronic Logbooks

(Component installation, Mate/Demate, Etc.)

Procedure Data Sheet Non-Conformance Report (NCR) QA and Archive Test Performance and Operation Plan LAT-MD-02730 FLAG I&T Operating Processes and Procedures

slide-48
SLIDE 48

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 48

Assembly and Inspection Data Sheet Assembly and Inspection Data Sheet

slide-49
SLIDE 49

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 49

Assembly and Inspection Data Sheet Assembly and Inspection Data Sheet

slide-50
SLIDE 50

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 50

I&T Operation Processes and Procedures I&T Operation Processes and Procedures

Document Name Document ECD I&T Need date

8/16/04 8/27/04 TBD 8/16/04 10/1/04 8/26/04 TBD 8/26/04 8/16/04 Comp Fastener Torque Procedure LAT-PS-03262 10/1/04 Mate/Demate Process Log Books Shift Component Installation Software Installation Configuration Mate/Demate EGSE Facilities Plan Flag Procedure (Anomaly Process) Critical Operations Lifting Moving Transportation Plan Clean Room Monitoring Bag and Purge Ingress/Egress Building Emergency Response Plan LAT-PS-04459 10/1/04 LAT-TD-0408 Need I&T Process Document 10/1/04 LAT-MD-01386 10/1/04 TBD 10/1/04 LAT-PS-03057 10/1/04 TBD 6/1/05 TBD (currently in Facilities Plan) LAT-PS-03291 10/1/04 LAT-PS-03060 10/1/04 Existing SLAC Document Comp

slide-51
SLIDE 51

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 51

On Bench In Flight like Single bay In Metrology Bay

Single Bay Integration and Test Flow Single Bay Integration and Test Flow

TKR Module Post Ship Test TKR Module CPT TRK Module Install TKR Module LPT Cal Module Install Cal Module LPT TEM-TKR EICIT/IVT Single Bay CPT CAL Module Post Ship Test CAL Module CPT CAL Module LPT TEM/TPS Module Post Ship Test TEM/TPS Module CPT TEM/TPS EICIT/IVT CAL Module CPT

LAT-PS-03290 LAT-PS-03287 LAT-PS-03287 LAT-PS-03290 LAT-PS-03287 LAT-PS-03290 LAT-PS-03875, 04097 LAT-PS-03276 LAT-PS-03058 LAT-PS-03027 LAT-PS-03062 LAT-PS-03287 LAT-PS-03875, 04097, 04098, 04099 LAT-PS-03287 LAT-PS-03062 LAT-TD-3415

slide-52
SLIDE 52

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 52

LAT I&T Procedure Summary LAT I&T Procedure Summary

slide-53
SLIDE 53

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 53

LAT I&T Procedure Summary LAT I&T Procedure Summary

slide-54
SLIDE 54

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 54

LAT I&T Procedure Summary LAT I&T Procedure Summary

slide-55
SLIDE 55

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 55

LAT I&T Procedure Summary LAT I&T Procedure Summary

slide-56
SLIDE 56

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 56

EM EM-

  • 2 (August 2004)

2 (August 2004)

Complete EM-2 9/6/04 EM GASU 8/5/04 Mini-Tower Pre-ship LPT 8/5/04 Install Mini- Tower (Bldg 33) 8/5/04 EM CAL 8/5/04 Mini-ACD 8/16/04 FSW Support for filtering 8/15/04 EM CAL Post-Ship Test 8/6/04 Install EM CAL 8/6/04 Single Bay CPT 8/6/04 Cosmics w/ TKR thresholds, Cosmics w/ TACK delays 8/9/04 EM GASU Validation 8/6/04 Mini-ACD CPT (on Bench) 8/16/04 Install Mini-ACD 8/18/04 Mini-ACD LPT 8/19/04 Mini-LAT CPT 8/19/04 Mini-LAT Timing 8/20/04 Mini-LAT Cosmics 8/24/04 Mini-LAT Van de Graaff 8/30/04 EM GASU STM 8/5/04 Remove Mini- CAL 8/6/04 Mini-Tower Post-ship LPT 8/5/04 SVAC to Process and Analyze data offline – SAS Offline Pipeline is Essential Offline Pipeline 5/30/04

slide-57
SLIDE 57

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 57

I&T Operating Plan I&T Operating Plan

  • Plan for 2 shift operation

– Minimum staff will be 1 Lead Technician, 2 Technicians and a Test Conductor or Test Director on shift (4 people per shift).

  • Shifts will run 7:00am-3:30pm and 3:00pm-11:30pm

– Daily morning meeting at 7:00am – Half hour overlap will facilitate a daily “hand-off” meeting at 3:00pm. Shift log will be used for documenting hand-off. – Shift hand-off between 2nd shift and the following day will be accomplished via shift log.

  • Baseline plan is 2-8hr shifts/5 days a week.

– Extended shifts and/or Saturdays will be used to maintain schedule as required.

  • Work has been scheduled on Friday after Thanksgiving and

through the Christmas shutdown.

slide-58
SLIDE 58

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 58

Two Shift Operation Flow Two Shift Operation Flow

1500 Daily Meeting Integration Test Director I&T Staff 0700 Daily Meeting Integration Test Director IFCT Staff

  • Status of day shift test flow

(Shift log review)

  • Generate/Assign Swing Tasks

from schedule.

  • Items for Test Prep
  • Shift log Review
  • Status test flow from previous swing shift
  • Assign days tasks from schedule.

Thursday Friday Saturday Sunday Monday

1500 Meeting Swing shift Swing shift 0700 Meeting 1500 Meeting Day shift Swing shift 0700 Meeting 1500 Meeting Day shift

slide-59
SLIDE 59

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 59

Tracker Installation Sequence Tracker Installation Sequence

Final Test Remove CAL, TEM, TEM-PS, & TKR Tower from Single Bay Mate TKR Flex cables to TEM Install TKR into alignment fixture Install CAL, TEM/TEMPS Test Install TKR Tower into Grid Install TKR Tower into Single Bay Verify TKR Alignment Receive TKR Tower Invert Single bay Install Cal Tower into Single Bay Invert Single bay Invert Single bay Demate TKR Flex Cables from TEM Remove TKR Tower from Single Bay Invert Grid Invert Grid Mate TKR Flex Cables Invert Single bay

slide-60
SLIDE 60

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 60

Calorimeter Installation Sequence Calorimeter Installation Sequence

Final Test Remove CAL, TEM/TEMPS from Metrology Bay Remove EM TEM/TEMPS (Demate Cal Connectors) Install CAL, TEM/TEMPS into Single Bay (TKR Previously installed) Invert Single Bay Test Remove CAL, TEM/TEMPS from Single Bay Install and shim Flight TEM/TEMPS Demate TKR Flex Cables Receive CAL Tower Install Cal into Metrology Bay Invert Cal Tower using single Bay Test Mate Connectors from TEM/TEMPS to CAL Mate TKR Connectors to TEM Invert Single Bay Install CAL, TEM/TEMPS into Grid (TKR Previously installed) Mate TKR Connectors to TEM Invert Grid

slide-61
SLIDE 61

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 61

I&T Flow For Tower Installation I&T Flow For Tower Installation

Receive TKR Tower Inspect, Metrology & El Test Final Test Remove CAL, TEM, TEM-PS, & TKR Tower from Single Bay Install CAL With Flt TEM/TEM- PS Install TKR into alignment fixture Measure TKR and Align Cones Test Prepare Grid Bay Install TKR Tower into Grid Bay Install TKR Tower into Single Bay Install CAL, TEM, & TEM-PS Receive CAL Tower Shim Flight TEM/TEM- PS Install Cal Tower into Metrology Bay Test

slide-62
SLIDE 62

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 62

I&T Accelerated Schedule I&T Accelerated Schedule

ID Task Name Duration Start Finish 1 LAT Accelerated Integration Plan 338.5 days Mon 4/5/04 Thu 9/1/05 2 Grid RFI 0 days Wed 9/15/04 Wed 9/15/04 3 X-LAT Thermal Plate RFI 0 days Thu 8/12/04 Thu 8/12/04 4 Radiators RFI 0 days Mon 5/2/05 Mon 5/2/05 5 Tracker Receiving 162.75 days Fri 9/24/04 Wed 6/1/05 6 Tower A 3 days Fri 9/24/04 Wed 9/29/04 12 Tower B 3 days Fri 10/29/04 Wed 11/3/04 18 Tower 1 1.5 days Tue 11/30/04 Wed 12/1/04 24 Tower 2 1.5 days Fri 12/31/04 Tue 1/4/05 30 Tower 3 2 days Fri 12/31/04 Tue 1/4/05 36 Tower 4 1.5 days Mon 1/31/05 Tue 2/1/05 42 Tower 5 2 days Mon 1/31/05 Wed 2/2/05 48 Tower 6 1.5 days Tue 2/15/05 Wed 2/16/05 54 Tower 7 1.5 days Fri 2/25/05 Mon 2/28/05 60 Tower 8 1.5 days Fri 2/25/05 Mon 2/28/05 66 Tower 9 1.5 days Tue 3/15/05 Wed 3/16/05 72 Tower 10 1.5 days Thu 3/31/05 Fri 4/1/05 78 Tower 11 2 days Thu 3/31/05 Mon 4/4/05 84 Tower 12 1.5 days Fri 4/15/05 Mon 4/18/05 90 Tower 13 1.5 days Fri 4/29/05 Mon 5/2/05 96 Tower 14 1.5 days Fri 4/29/05 Mon 5/2/05 102 Tower 15 1.5 days Mon 5/30/05 Wed 6/1/05 108 Tower 16 1.5 days Mon 5/30/05 Wed 6/1/05 114 Calorimeter Receiving 74.13 days Fri 10/22/04 Wed 2/16/05 115 Calorimeter A 3 days Fri 10/22/04 Wed 10/27/04 120 Calorimeter B 3 days Mon 11/1/04 Thu 11/4/04 125 Calorimeter 1 1.5 days Wed 11/10/04 Thu 11/11/04 130 Calorimeter 2 1.5 days Mon 11/22/04 Tue 11/23/04 135 Calorimeter 3 1.5 days Mon 11/22/04 Tue 11/23/04 140 Calorimeter 4 1.5 days Thu 12/2/04 Fri 12/3/04 145 Calorimeter 5 1.5 days Thu 12/2/04 Fri 12/3/04 150 Calorimeter 6 1.5 days Wed 12/15/04 Thu 12/16/04 155 Calorimeter 7 1.5 days Wed 12/15/04 Thu 12/16/04 160 Calorimeter 8 1.5 days Thu 12/23/04 Mon 12/27/04 165 Calorimeter 9 1.5 days Thu 12/23/04 Mon 12/27/04 170 Calorimeter 10 1.5 days Tue 1/11/05 Wed 1/12/05 175 Calorimeter 11 1.5 days Tue 1/11/05 Wed 1/12/05 180 Calorimeter 12 1.5 days Wed 1/26/05 Thu 1/27/05 185 Calorimeter 13 1.5 days Wed 1/26/05 Thu 1/27/05 190 Calorimeter 14 1.5 days Tue 2/1/05 Wed 2/2/05 195 Calorimeter 15 1.5 days Tue 2/1/05 Wed 2/2/05 200 Calorimeter 16 1.5 days Mon 2/14/05 Wed 2/16/05 205 Electronics Receiving 240.06 days Mon 4/5/04 Wed 4/6/05 206 Cables 44.06 days Fri 7/9/04 Wed 9/15/04 225 TEM Assemblies 113.5 days Wed 10/13/04 Wed 4/6/05 244 TEM PS Assemblies 93.31 days Thu 9/2/04 Wed 1/26/05 263 Electronic Boxes 234.44 days Mon 4/5/04 Tue 3/29/05 271 ACD Receiving 0 days Mon 2/14/05 Mon 2/14/05 273 Grid Mechanical in I&T 49.44 days Tue 8/10/04 Fri 10/22/04 274 Receive Grid 0 days Wed 9/15/04 Wed 9/15/04 275 Receive EMI Skirt Assy 0 days Tue 8/10/04 Tue 8/10/04 9/15 8/12 2/14 9/15 8/10 1 8 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 6 13 20 27 3 Aug '04 Sep '04 Oct '04 Nov '04 Dec '04 Jan '05 Feb '05 Mar '05 Apr '0

slide-63
SLIDE 63

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 63

I&T Accelerated Schedule (cont I&T Accelerated Schedule (cont’ ’d) d)

ID Task Name Duration Start Finish 299 Grid Box Base Assy Inspection and Fitcheck 7 days Wed 10/13/04 Fri 10/22/04 308 Grid RFI 0 days Thu 10/21/04 Thu 10/21/04 309 TEM to Calorimeter 104.44 days Wed 10/27/04 Wed 4/6/05 310 Calorimeter A 2 days Wed 10/27/04 Fri 10/29/04 313 Calorimeter B 2 days Thu 11/4/04 Mon 11/8/04 316 Calorimeter 1 18.69 days Thu 11/11/04 Fri 12/10/04 319 Calorimeter 2 4.69 days Fri 12/10/04 Fri 12/17/04 322 Calorimeter 3 8.94 days Fri 12/17/04 Mon 1/3/05 325 Calorimeter 4 4.69 days Mon 1/3/05 Mon 1/10/05 328 Calorimeter 5 4.69 days Mon 1/10/05 Tue 1/18/05 331 Calorimeter 6 4.69 days Tue 1/18/05 Tue 1/25/05 334 Calorimeter 7 4.69 days Tue 1/25/05 Tue 2/1/05 337 Calorimeter 8 4.69 days Tue 2/1/05 Tue 2/8/05 340 Calorimeter 9 4.25 days Tue 2/8/05 Tue 2/15/05 343 Calorimeter 10 5.63 days Tue 2/15/05 Wed 2/23/05 346 Calorimeter 11 4.69 days Wed 2/23/05 Wed 3/2/05 349 Calorimeter 12 4.69 days Wed 3/2/05 Wed 3/9/05 352 Calorimeter 13 4.69 days Wed 3/9/05 Wed 3/16/05 355 Calorimeter 14 4.69 days Wed 3/16/05 Wed 3/23/05 358 Calorimeter 15 4.69 days Wed 3/23/05 Wed 3/30/05 361 Calorimeter 16 4.69 days Wed 3/30/05 Wed 4/6/05 364 Calorimeter/Tracker/TEM/TEM-PS Test 121.38 days Fri 10/29/04 Wed 5/4/05 365 Tower A 2 days Fri 10/29/04 Tue 11/2/04 368 Tower B 2 days Mon 11/8/04 Wed 11/10/04 371 Tower 1 1 day Fri 12/10/04 Mon 12/13/04 374 Tower 2 1 day Tue 1/4/05 Wed 1/5/05 377 Tower 3 1 day Wed 1/5/05 Thu 1/6/05 380 Tower 4 1 day Tue 2/1/05 Wed 2/2/05 383 Tower 5 1 day Wed 2/2/05 Thu 2/3/05 386 Tower 6 1 day Wed 2/16/05 Thu 2/17/05 389 Tower 7 1 day Mon 2/28/05 Tue 3/1/05 392 Tower 8 1 day Tue 3/1/05 Wed 3/2/05 395 Tower 9 1 day Wed 3/16/05 Thu 3/17/05 398 Tower 10 1 day Fri 4/1/05 Mon 4/4/05 401 Tower 11 1 day Mon 4/4/05 Tue 4/5/05 404 Tower 12 1 day Mon 4/18/05 Tue 4/19/05 407 Tower 13 1 day Mon 5/2/05 Tue 5/3/05 410 Tower 14 1 day Tue 5/3/05 Wed 5/4/05 413 Tower Installation 124.38 days Tue 11/2/04 Thu 5/12/05 414 Install Tower A 15 days Tue 11/2/04 Wed 11/24/04 422 Install Tower B 14 days Wed 11/24/04 Thu 12/16/04 430 2 Tower CPT 15 days Thu 12/16/04 Mon 1/10/05 431 Install Tower 1 2.5 days Mon 1/10/05 Thu 1/13/05 438 Install Tower 2 2.5 days Thu 1/13/05 Wed 1/19/05 445 4 Tower CPT 4 days Wed 1/19/05 Tue 1/25/05 446 Install Tower 3 2.5 days Tue 1/25/05 Fri 1/28/05 453 Install Tower 4 2.5 days Wed 2/2/05 Mon 2/7/05 460 Install Tower 5 2.5 days Mon 2/7/05 Thu 2/10/05 467 Install Tower 6 2.5 days Thu 2/17/05 Tue 2/22/05 474 8 Tower CPT 5 days Tue 2/22/05 Tue 3/1/05 475 Install Tower 7 2.5 days Tue 3/1/05 Fri 3/4/05 482 Install Tower 8 2.5 days Fri 3/4/05 Wed 3/9/05 489 Install Tower 9 2.5 days Thu 3/17/05 Tue 3/22/05 496 Install Tower 10 3 days Mon 4/4/05 Thu 4/7/05 503 Install Tower 11 3 days Thu 4/7/05 Wed 4/13/05 10/21 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 Sep '04 Oct '04 Nov '04 Dec '04 Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '0

slide-64
SLIDE 64

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 64

I&T Accelerated Schedule (cont I&T Accelerated Schedule (cont’ ’d) d)

ID Task Name Duration Start Finish 503 Install Tower 11 3 days Thu 4/7/05 Wed 4/13/05 510 Install Tower 12 2.5 days Tue 4/19/05 Fri 4/22/05 517 Install Tower 13 2.5 days Tue 5/3/05 Fri 5/6/05 524 Install Tower 14 3.5 days Fri 5/6/05 Thu 5/12/05 532 Install Electronics and Cables 6 days Thu 5/12/05 Fri 5/20/05 537 16 Tower CPT 5 days Fri 5/20/05 Fri 5/27/05 538 ACD 8 days Fri 5/27/05 Thu 6/9/05 539 Install ACD 2.5 days Fri 5/27/05 Wed 6/1/05 540 Test ACD 2.5 days Thu 6/2/05 Mon 6/6/05 541 Install X-LAT Plate 3 days Mon 6/6/05 Thu 6/9/05 542 LAT Level System Test 45 days Thu 6/9/05 Wed 8/17/05 548 Pack & Ship 5 days Wed 8/17/05 Thu 8/25/05 549 Deliver to NRL 5 days Thu 8/25/05 Thu 9/1/05 15 22 29 5 12 19 26 3 10 17 24 31 7 14 21 28 5 12 19 26 2 9 16 23 30 6 13 20 27 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 3 Sep '04 Oct '04 Nov '04 Dec '04 Jan '05 Feb '05 Mar '05 Apr '05 May '05 Jun '05 Jul '0

slide-65
SLIDE 65

GLAST LAT Project 4.1.9 - Integration and Test 11 Aug 04 Face to Face Meeting 65

Summary and Conclusion Summary and Conclusion

  • We are closing in on readiness for flight hardware integration.
  • The resources are in place.
  • Documentation and Planning are near term focus.
  • Training is on-going on EM hardware.
  • MGSE is arriving “just in time”.
  • Successful integration phase will depend on close

coordination with subsystems for anomaly resolution.