financial model update
play

Financial Model Update Public Presentation July 9, 2015 BBP - PowerPoint PPT Presentation

Financial Model Update Public Presentation July 9, 2015 BBP financial model developed/refined over 10+ years Public updates Executing on the model First model created as part of initial park planning: 2005 2008: One Brooklyn Bridge Park lease


  1. Financial Model Update Public Presentation July 9, 2015

  2. BBP financial model developed/refined over 10+ years Public updates Executing on the model First model created as part of initial park planning: 2005 2008: One Brooklyn Bridge Park lease approved 2009: First comprehensive maritime inspection Public presentation of financial model: 2009 Committee on Alternatives to Housing process: 2010 2010: First park sections open (Pier 1 and Pier 6) 2012: Pier 1 Hotel/Condo lease approved Financial Model Update for Board of Directors: 2013 2013: John St and Empire Stores leases approved 2014: First maritime repairs, funded out of operating capital Financial Model Update for Board of Directors: 2014 2014: Pier 6 development RFP issued 2

  3. OUTLINE • Expenses • Operating Expenses • Maritime Maintenance • Capital Maintenance • Revenue • Cashflow projections 3

  4. OPERATING EXPENSES: Park is 65% complete with 10% under construction 1 - Under construction - In design/future phase 1. Numbers are approximate 4

  5. OPERATING EXPENSES: After initial park build-out, opex grows with inflation Projected $50 build-out 3 $45 Projected ann. opex ($M, nominal 5 ) $40 $35 $30 $25 $20 $15 $10 $5 $0 FY2012 FY2016 FY2020 FY2024 FY2028 FY2032 FY2036 FY2040 FY2044 FY2048 FY2052 FY2056 FY2060 FY2064 Park Maintenance and Operations Management and Administration NOTE: FY12 to FY15 derived from approved BBP budgets, FY16 from proposed budget, and FY17 to FY65 from projections 1. Expense growth during “Park phase-in” based on (i) addition of new parkland, (ii) increased visitation at existing parkland, and (iii) projected inflation 2. CAGR=Compound Annual Growth Rate 3. Park construction projected to be completed during FY19 4. Expense growth during “On-going maintenance” projected to be 3% annually, the historical average rate of inflation in the US 5. Nominal values include inflation 5

  6. MARITIME MAINTENANCE: Maritime infrastructure is deteriorating BBP maritime assets 1 • 13,000 timber piles • 11,000 concrete extensions • 4,500 linear ft of bulkheads 2 • 830,000 SF of concrete pier deck (1/3 of park) • 3,200 linear ft of riprap or natural shore Pier 3 pile cross-section showing marine borer damage Pier 3 pile cross-section showing marine borer damage 1. Numbers are approximate 2. Concrete and steel 6

  7. MARITIME MAINTENANCE: Initial cost estimate from 2005 was simplistic Projected annual expenditure ($M, nominal) $18 $16 $14 $12 $10 $8 $6 $4 $2 $0 2005 2008 2011 2014 2017 2020 2023 2026 2029 2032 2035 2038 2041 2044 2047 2050 2053 Maritime maintenance Total expense over 50 years was $200M (in $2005) (or $450M in $nominal) NOTE: Initial financial model from 2005 assumed $200M (real$) of maritime expenses over 50 years; it assumed consistent $4M per year expenses (a straight average), grown with inflation 7

  8. MARITIME MAINTENANCE: More refined lifecycle cost model created in 2010 Model inputs Projected expenses ($M) 12 $100 $90 Quantity and type $80 $70 of maritime assets $60 $50 $40 $30 $20 Rate of $10 deterioration $0 2010 2013 2016 2019 2022 2025 2028 2031 2034 2037 2040 2043 2046 2049 2052 2055 2058 2061 Unit cost for repair Total expense over 50 years projected to be $200M (in $2010) (or $375M in $nominal) ($ per linear foot) 1. Assumed $700 per linear foot in structural repair costs 2. Dive inspections were projected at ~$220K annually ($2005) 8

  9. MARITIME MAINTENANCE: Cost of repairing maritime infrastructure is escalating Increases driven by unit cost growth 2 Cost increases over previous 5 years • Steep growth in unit costs for repairs 3 : Projected expense o $700/lin. ft. (2010) Year over 50 yrs 1 o $875/lin. ft. (2012) 2010 $200M o $1,100/lin. ft. (2015 2012 $260M 2015 $320M • Growth driven by: o Improved local economy o Numerous active projects in NY Harbor o Limited number of specialty contractors leads to strong pricing power 10% CAGR 4 from 2010 to 2015 1. Numbers are in real$ (2010 projection in $2010, 2012 projection in $2012, and 2015 projection in $2015) 2. Project scope and rate of deterioration have remained consistent with earlier projections 3. Unit costs based on awarded marine contracts for BBP work and consistent with regional averages 4. CAGR=Compound Annual Growth Rate 9

  10. MARITIME MAINTENANCE: Reactive vs. preventative approach Reactive approach Preventative approach • Encase piles to prevent future • Annual rehabilitation of deteriorated elements only deterioration Approach • Remaining non-rehabilitated • Repair as many piles upfront as is financially viable elements continue to deteriorate • Steel reinforced concrete • ¾” epoxy protective encasement Associated encasement (4” to 8” width) (no reinforcing steel or concrete) repair • Transfers structural load from pile, • Piles maintain structural capacity to concrete encasement 10

  11. MARITIME MAINTENANCE: Current expense projection (reactive approach) Projected annual expenditure ($M, nominal) $120 $100 $80 $60 $40 $20 $0 2016 2019 2022 2025 2028 2031 2034 2037 2040 2043 2046 2049 2052 2055 2058 2061 2064 1 2 Maritime maintenance Dive inspections Total expense over 50 years is $320M 3 (in $2015) (or $600M in $nominal) 1. Assumes $1,100 per linear foot in structural repair costs, up from previous cost assumption of $875 per linear foot; grown with inflation of 3% per year 2. Dive inspections are ~$250K annually ($2015) for reactive approach 3. Up from previous estimate of $260M from 2012 11

  12. MARITIME MAINTENANCE: Current expense projection (preventative approach) Projected annual expenditure ($M, nominal) $120 $100 $80 $60 $40 $20 $0 2016 2019 2022 2025 2028 2031 2034 2037 2040 2043 2046 2049 2052 2055 2058 2061 2064 1 2 Maritime maintenance Dive inspections Total expense over 50 years is $240M 3 (in $2015) (or $340M in $nominal) 1. Assumes $1,100/linear foot in structural repair (up from $875/lin ft), $525/lin ft in preventative concrete extension repair, and $425/lin ft in preventative pile repair ; grown with inflation of 3% per year 2. Dive inspections are ~$150K annually ($2015) for preventative approach 3. Up from previous estimate of $210M from 2012 12

  13. MARITIME MAINTENANCE: Preventative approach has significant advantages • Cheaper than reactive approach ($80M cheaper in $2015 or $260M in $nominal) o Reduced labor costs o Less material required o Economies of scale in purchasing • Better for the environment (less fill in East River) • Less market risk of future cost increases • Good long-term investment option 1 Preventative maintenance repair Reactive maintenance pile repair 1. BBP’s investment policy limits investment of BBP funds to low-risk, modest return vehicles; current annual rate of return on these investment vehicles is <1% 13

  14. CAPITAL MAINTENANCE: Refinement of capital maintenance expense estimates 2005 estimate 2012 estimate 2015 estimate Based on industry standards Based on industry standards Based on lifecycle cost model of all BBP assets • 1% to 2% of initial • 1% to 2% of initial • Full asset inventory construction costs construction costs • Useful life of assets • $130M construction • $400M construction budget budget • Replacement value ~$2M per year ~$5M per year ~$5M per year NOTE: BBP does not receive public funds for on-going capital maintenance 14

  15. CAPITAL MAINTENANCE: Lifecycle estimate – illustrative example 1 2 3 4 Determine Project replacement replacement Identify all park Assign useful life value for each expenses over assets to each asset asset 50 years Replacement Pier 5 astroturf $800K 1 10 year life needed in FY22, (installed FY2012) FY32, FY42 etc. 1.In $2015; model assumes 3% annual cost inflation 15

  16. CAPITAL MAINTENANCE: All BBP assets used to project future expenses Projected capital maintenance expenses 180+ asset groups identified $40 Artificial Turf Paving / Chip Seal $35 Beaches (Pier 4 and Main St) Picnic Grills $30 In nominal $M Benches (slats, supports) Picnic Tables / Umbrellas $25 Boardwalk at EFF Pier 2 Court Surface $20 Bouldering Wall Plantings and Lawns $15 Buildings Playground Equipment $10 Dog Run Surfaces Playground Surfaces $5 Exercise Equipment Range Fence Ferry Dock at Pier 6 Retention Tanks $0 FY2016 FY2019 FY2022 FY2025 FY2028 FY2031 FY2034 FY2037 FY2040 FY2043 FY2046 FY2049 FY2052 FY2055 FY2058 FY2061 FY2064 Floating Dock at Pier 2 Rink Surface Irrigation (pumps, lines) Shade Sails Lights (poles, fixtures) Sports Netting Projected capital maintenance expenses ($nominal) Loop Road + parking lot Squibb Bridge Annual contribution to capital reserve fund ($nominal) Marine Fence Steel Shed Structure Overwater bridges (7 in total) Vehicles Average of ~$5M ($2015) per year NOTE: Above list of assets not comprehensive 16

  17. OUTLINE • Expenses • Revenue • One-time Revenue • Recurring Revenue • Cashflow projections 17

  18. ONE-TIME REVENUES: Revenues from upfront rent, PILOST 1 , and PILOMRT 2 Projected one-time revenue Projected one-time revenues ($M) One-time rev $30 Site ($M) $25 One Brooklyn Bridge Park $4 $20 Pier 1 $27 OBBP $15 John Street 3 $31 Pier 1 $10 Empire Stores $32 John St $5 Empire Stores TOTAL $93 $0 1. PILOT=Payment in Lieu of Sales Tax 2. PILOMRT=Payment in Lieu of Mortgage Recording Tax 3. Includes estimated $10M in participation rent on initial sales 18

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.