FY 2015 | Project Rollout
C A P I TA L I M P R O V E M E N T S P R O G R A M F E B R U A R Y 1 8 , 2 0 1 4
FY 2015 | Project Rollout F E B R U A R Y 1 8 , 2 0 1 4 Welcome. - - PowerPoint PPT Presentation
C A P I TA L I M P R O V E M E N T S P R O G R A M FY 2015 | Project Rollout F E B R U A R Y 1 8 , 2 0 1 4 Welcome. T E R R Y L E E D S , D I R E C T O R O F W A T E R S E R V I C E S Agenda About Kansas City Water Services FY
FY 2015 | Project Rollout
C A P I TA L I M P R O V E M E N T S P R O G R A M F E B R U A R Y 1 8 , 2 0 1 4
Welcome.
T E R R Y L E E D S , D I R E C T O R O F W A T E R S E R V I C E S
Agenda
2/ 18/ 2014 3
Kansas City Water Services
A B O U T
Kansas City Water Services
2/ 18/ 2014 5
FY 2014 Highlights
First & Second Creek Sewer Expansion Project Brookside Sewer Improvements Project Small Main Replacement Program
m
Holmes Road Water Main Replacement Project Blue River Disinfection Improvements Project
$175 M Inv estm ent, 8 5+ Projects
2/ 18/ 2014 7
Utility Projects: FY 2014
Em ergency Power Generation Phase II
Concrete Rehabilitation Phase V Flat Work and Intake
Water Treatm ent Plant West Header and Valves at Secondary
2/ 18/ 2014 8
Utility Projects: FY 2014
City Wide Curb Stop Replacem ent
City Wide Service Line Kill Contract
City Wide Air Release Valve Replacem ent
2/ 18/ 2014 9
Utility Projects: FY 2014
Harlem Sewer Force Main Rehabilitation
Green Infrastructure Pilot Project
East Bottom s Pum p Station Rehab Phase II
Capital Improvements Program FY 2015 - 2019
W AT E R S E R V I C E S ’ F I V E Y E A R
Water Services’ Capital Improvements Program
A custom er-focused p la n for K C’s la rgest infra structure inv estm ent.
2/ 18/ 2014 12
Capital Improvements Initiatives
Water Master Plan Wastewater Master Plan Performance Measures Water Main Replacement Program Sewer Main Rehabilitation Program Programmatic Goals Programmatic Solicitations & Selections Expanded SLBE Program OCP University
2/ 18/ 2014 13
OCP University
Educational Program for MBE, WBE & SLBE Firms:
14 2/ 6/ 2014
5 Year Water CIP: Num bers by Project Type
Project Type Num ber of Projects % of Total Treatment 7 3.1% Pump Station 7 3.1% Transmission 6 2.6% Distribution 207 90.8% Storage 1 .4% Total 228 100%
2/ 18/ 2014 15
5 Year Water CIP: Am ounts by Project Type
Project Type FY 15 FY 16 FY 17 FY 18 FY 19 Total Treatment $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 $15,000,000 Pump Station $10,600,000 $6,750,000 $10,300,000 $9,800,000 $11,000,000 $51,450,000 Transmission $6,365,000 $12,520,000 $2,500,000 $21,385,000 Distribution $54,900,000 $48,330,000 $56,700,000 $54,700,000 $56,000,000 $270,630,000 Storage $3,000,000 TOTAL $77,865,000 $70,600,000 $70,000,000 $70,000,000 $70,000,000 $358,465,000
2/ 18/ 2014 16
5 Year Maintenance Program: Water
FY15 FY16 FY17 FY18 FY19 Valve Exercising $1,200,000 $1,300,000 $600,000 $600,000 $600,000 Supplemental Workforce $2,500,000 $2,500,000 $2,500,000 $2,500,000 $2,500,000 Air Release Valves $300,000 $200,000 Curb Stops $1,000,000 $500,000 Service Line Kill $500,000 $100,000 Hydrant Repair $800,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 Valve Replacement $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 TOTAL: $8,300,000 $7,600,000 $6,100,000 $6,100,000 $6,100,000
2/ 18/ 2014 17
5 Year Wastewater CIP: Num bers by Project Type
Project Type Num ber of Projects % of Total Treatment 37 18% Pump Station 4 2% Collection Systems 40 19% OCP 128 61% TOTAL 209 100%
2/ 18/ 2014 18
5 Year Wastewater CIP: Am ounts by Project Type
Project Type FY 15 FY 16 FY 17 FY 18 FY 19 TOTAL WW Treatment
$10,500,000 $16,335,000 $27,215,000 $23,000,000 $77,050,000
Pump Stations
$2,500,000 $5,000,000 $7,750,000 $15,250,000
Collection System
$17,560,000 $23,360,000 $15,060,000 $15,060,000 $15,060,000 $86,100,000
OCP
$44,550,000 $175,465,000 $135,135,000 $113,100,000 $120,100,000 $588,350,000
TOTAL
$75,110 ,0 0 0 $220 ,16 0 ,0 0 0 $18 5,16 0 ,0 0 0 $151,16 0 ,0 0 0 $135,16 0 ,0 0 0 $766 ,750 ,0 0 0
2/ 18/ 2014 19
5 Year Maintenance Program: Wastewater
FY15 FY16 FY17 FY18 FY 19 Private Line Repair $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 Supplemental Workforce $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 CCTV $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 Line Cleaning $1,000,000 $1,000,000 $1,000,000 $1,000,000 $1,000,000 Fly-Over $60,000 $60,000 $60,000 $60,000 $60,000 CIPP $4,500,000 $7,000,000 7,000,000 $7,000,000 $7,000,000 Main Repair $3,000,000 $3,000,000 $3,000,000 $3,000,000 $3,000,000 TOTAL: $15,560,000 $18,060,000 $18,060,000 $18,060,000 $18,060,000
2/ 18/ 2014 20
FY 15 Year Stormwater CIP: Num bers by Project Type
Project Type Num ber of Projects % of Total Stormwater 7 47% Waterways 8 53% Total 15 100%
2/ 18/ 2014 21
5 Year Maintenance Program: Stormwater
FY15 FY16 FY17 FY18 FY19 Levee & Channel Maintenance $790,000 $790,000 $790,000 $790,000 $790,000 Storm Monitoring System $236,500 $236,500 $236,500 $236,500 $236,500 MS4 Monitoring & Support $256,000 $256,000 $256,000 $256,000 $256,000 Catch Basin Replacement $500,000 $500,000 $500,000 $500,000 $500,000 TOTAL: $1,782,500 $1,782,500 $1,782,500 $1,782,500 $1,782,500
2/ 18/ 2014 22
FY 2015 Program Highlights
C A P I TA L I M P R O V E M E N T S P R O G R A M
Water Main Replacement Program
Inv esting in the Future of K a nsa s City ’s W a ter Infra structure
1 2 3 4 5 6 7 8 9 10 Miles Percent 10165.1 13.1 7.2 3.1 1.7 0.7 1.0 0.4 0.2 0.9 A 19.1
0.7% 9101.4 9.0 3.1 2.3 1.0 0.6 0.5 0.9 0.2 1.1 B 37.6
1.4% 847.3 10.9 7.1 3.0 2.2 1.3 0.2 1.3 1.3 1.3 C 42.6
1.6% 756.8 17.8 5.7 5.2 4.6 2.5 2.3 2.1 2.3 2.3 D 106.0
4.0% 68.8 24.0 20.4 9.0 7.0 4.8 3.1 4.4 2.3 9.2 E 143.7
5.4% 5115.4 90.2 32.6 21.8 12.5 6.8 13.8 7.6 9.0 26.5 F 135.5
5.1% 410.5 47.6 43.2 30.5 19.0 28.1 14.5 19.6 29.4 33.7 G 193.8
7.2% 3240.6 187.4 105.7 62.8 54.4 23.4 34.5 51.0 30.8 16.7 H 221.5
8.3% 252.3 230.5 133.1 24.8 6.8 30.3 65.3 43.2 21.4
1779.8
66.4% 121.7 3.8 1.7 9.8 1.3
29.9
Group
Probability of Failure Consequence of Failure
2/ 18/ 2014 24
Sewer Rehabilitation Program
Strategic & Data-Driven $7M Investm ent, 10 0 Years Im proves Service Reliability
2/ 18/ 2014 25
Kansas City’s Overflow Control Program
2/ 6/ 2014 26
$4.5-$5.0 billion Investment 25 Year Plan, Largest program in KC’s history First Federal Consent Decree to include green infrastructure solutions City-wide approach to address sewer
Im proving Water Quality
Ad d itiona l Op era ting & Ma intena nce Costs $72 m illion p er y ea r by 20 35
2/ 18/ 2014 26
Kansas City’s Overflow Control Plan
Programmatic Elements Improved Water Quality
2/ 6/ 2014 27
Consent Decree
Program Implementation
reducing the problem and improving service
ramping up in planning and design phases
pilot complete
for consultant selection
2/ 18/ 2014 28
Water Infrastructure Design & Construction Projects
F I S C A L Y E A R 2 0 1 5
Water Infrastructure: FY 15 Design
Vivion Road 36 ” Transm ission Main
2/ 18/ 2014 30
Water Main Replacement Program
18 Design; 18 Construction Projects Programmatic MBE/ WBE/ SLBE Goals Programmatic DPS Selection Process
2/ 18/ 2014 31
Water Infrastructure: FY 15 Design
Water Main Replacem ent Woodland to Kensington, 63rd St. to 72nd Terr.
Water Main Replacem ent Walnut to Bennington, St. John to 17th St.
Water Main Replacem ent Stateline to Holm es, 86th Terr. To 132nd Terr.
2/ 18/ 2014 32
Water Infrastructure: FY 15 Design
Water Main Replacem ent Oakley to Marsh’ 20 th St. to 34th St.
Water Main Replacem ent Stateline to Harrison, 44th St. To 75nd St.
Water Main Replacem ent Stateline to Holm es, 75th St. to 85th St.
2/ 18/ 2014 33
Water Infrastructure: FY 15 Design
Water Main Replacem ent NW Waukom is to N Troost, 40 th St. to 83rd St.
Water Main Replacem ent N Walrond to N Brighton, NE Russell Rd. to 53rd Terr.
Water Main Replacem ent N Troost to N Kansas, NE Russell Rd to NE Englew ood
2/ 18/ 2014 34
Water Infrastructure: FY 15 Design
Water Main Replacem ent N Hardesty to N Tullis, 50 th St. to 62nd St.
Water Main Replacem ent N Richards to N Brighton, 1st St. to 37th St.
Water Main Replacem ent Lydia to Walrond, 77th Terr. to 85th St.
2/ 18/ 2014 35
Water Infrastructure: FY 15 Design
Water Main Replacem ent Holm es to College, 85th St. to 139th St.
Water Main Replacem ent Holm es to Lydia, 79th St. to 85th St.
Water Main Replacem ent Elm w ood to Blue Ridge Cutoff, 47th St. to 57th St.
2/ 18/ 2014 36
Water Infrastructure: FY 15 Design
Water Main Replacem ent Drury to Elm , 80 th Terr. to 120 th Terr.
Water Main Replacem ent Blue Ridge Cutoff to Norfleet, 38th Terr. to 75th St.
Water Main Replacem ent Askew to Hardesty, 36th St. to 46th St.
2/ 18/ 2014 37
Water Infrastructure: FY 15 Construction
Water Main Replacem ent Hickm an Mills to Bristol, 109th St. to 113th St.
Water Main Replacem ent Stateline to Virginia, 99th St. to 112th St.
Water Main Replacem ent
2/ 18/ 2014 38
Water Infrastructure: FY 15 Construction
Water Main Replacem ent Manchester to Ashland Ridge, 29th St. to 40 Hw y
Water Main Replacem ent Oakley to Meadow brook, 50 th St. to 56th St.
Water Main Replacem ent Eastern to Sycam ore, 43rd St. to 51st St.
2/ 18/ 2014 39
Water Infrastructure: FY 15 Construction
Water Main Replacem ent Eastern to Lee's Sum m it, 70 th St. to Bannister
Water Main Replacem ent Stateline to Kenw ood, 75th St. to 89th St.
Water Main Replacem ent Donnelly to Raytow n, Ruskin to Highgrove
2/ 18/ 2014 40
Water Infrastructure: FY 15 Construction
Water Main Replacem ent Jackson to Hardesty, 32nd St. to 45th St.
Water Main Replacem ent Cam bridge to Elm , 51st St. to 74th St.
Water Main Replacem ent Jackson to Grandview , 104th St. to Martha Trum an
2/ 18/ 2014 41
Water Infrastructure: FY 15 Construction
Water Main Replacem ent McGee to Chestnut, 65th St. to 89th St.
Water Main Replacem ent Oak to Mersington Ave, 39th Ter to NE Englew ood Rd
Water Main Replacem ent Jackson to N Brighton Ave., NE 42nd St. to Vivion
2/ 18/ 2014 42
Water Infrastructure: FY 15 Construction
Water Main Replacem ent Roanoke to Troost, Missouri River to 51st St.
Water Main Replacem ent Stateline to Rockhill, 64th Terr. to Rom any
Water Main Replacem ent Indiana to Cindy, 53rd St. to Meyer
2/ 18/ 2014 43
Water Infrastructure: FY 15 Construction
Arrowhead Phase III North Oak to Englew ood
2/ 18/ 2014 44
Water Infrastructure: FY 15 Construction
Shoal Creek Parkway Pum p Station & Reservoir
2/ 18/ 2014 45
Wastewater Infrastructure Design & Construction Projects
F I S C A L Y E A R 2 0 1 5
Inflow/ Infiltration Reduction
PRIVATE I/ I
Reduction Plan in Developm ent
PUBLIC I/ I
Reduction Plan Underw ay
2/ 18/ 2014 47
I/ I Reduction Project Locations
requirements: 29% to 45%
nearly 50% of removal
performed in parallel
2/ 18/ 2014 48
Wastewater Infrastructure: FY 15 Design
I/ I Reduction: Blue River South Basin - Project Area 4
I/ I Reduction: Blue River Central Basin - Project Area 1
I/ I Reduction: Blue River Central Basin - Project Area 2
2/ 18/ 2014 49
Wastewater Infrastructure: FY 15 Design
I/ I Reduction: Line Creek/ Rock Creek Basin - Project Area 2
I/ I Reduction: Blue River North Basin
2/ 18/ 2014 50
Wastewater Infrastructure: FY 15 Design
Sewer Separation: Diversion Structure 006
I/ I Reduction: Blue River South Basin - Project Area 5
I/ I Reduction: Blue River South Basin - Project Area 3
2/ 18/ 2014 51
Wastewater Infrastructure: FY 15 Design
Buckeye Pum p Station Im provem ents
Sewer Pipe Consolidation: Outfall 0 63
High Efficiency Aeration - Westside
2/ 18/ 2014 52
Wastewater Infrastructure: FY 15 Design
High Efficiency Aeration - Birm ingham
Platte Woods Pum p Station Rehab
2/ 18/ 2014 53
Wastewater Infrastructure: FY 15 Design
Neighborhood Sewer Rehabilitation Brush Creek - Project Area 1
Neighborhood Sewer Rehabilitation: Brush Creek - Project Area 2
2/ 18/ 2014 54
Wastewater Infrastructure: FY 15 Design
Sewer Separation Outfall 0 6 7
Gooseneck Arch Sewer Inline Gate & Pum p Station
Sewer Separation: Diversion Structure 0 9 9
2/ 18/ 2014 55
Wastewater Infrastructure: FY 15 Construction
Swope Cam pus Parking Lot & Sustainable Storm water Im provem ent Project
Blue River WWTP Clarifier Work
2/ 18/ 2014 56
Wastewater Infrastructure: FY 15 Construction
Sludge Holding Lagoons Birm ingham
2/ 18/ 2014 57
Wastewater Infrastructure: FY 15 Construction
City Wide Sewer Rehabilitation
Weatherby Lake Sewer Rehabilitation
Manhole Rehabilitation Citywide
2/ 18/ 2014 58
Wastewater Infrastructure: FY 15 Construction
Birm ingham Pum p Station Im provem ents
2/ 18/ 2014 59
Stormwater Infrastructure Projects
F I S C A L Y E A R 2 0 1 5
Stormwater: FY 15 Construction
Blue River Trail Brush Creek to Stadium Drive
Blue River Trail Sw ope Park to Brush Creek
Storm Drainage Im provem ents 6400 NE 52nd
2/ 18/ 2014 61
Stormwater: FY 15 Construction
Lom a Vista & Eastern Culverts & Channel Eastern to Sante Fe
57th & Norfleet Storm Drainage Phase II
Storm water Detention Im provem ents NE Cookingham Drive – Lakeside Drainage
Dean Lane Bank Stabilization Phase II
2/ 18/ 2014 62
Stormwater: FY 15 Construction
4 0 th & Monroe Phase II Im provem ents
Gardner West Detention Basin
2/ 18/ 2014 63
U.S. Army Corps of Engineers
Turkey Creek Restored Channel Phase III
Blue River Channel Maintenance Access & Channel Repair
Upper Blue River Industrial Utility Relocations & Levee Work
2/ 18/ 2014 64
To Learn More Visit: www.fbo.gov
U.S. Army Corps of Engineers
Turkey Creek MO River Interceptors
East Bottom s Levee Unity Im provem ents
2/ 18/ 2014 65
To Learn More Visit: www.fbo.gov
Swope Park Industrial
U.S. Arm y Corps of Engineers Projects: www.fbo.gov Society of Am erican Military Engineers One-on-One Opportunity: