Fondren Road Paving and Drainage Improvements Creekbend to West Airport
(WBS No. N-100021-0001-3)
T RC Pre se nta tio n Da te : Ma rc h 15, 2016
1
Fondren Road Paving and Drainage Improvements Creekbend to West - - PowerPoint PPT Presentation
Fondren Road Paving and Drainage Improvements Creekbend to West Airport (WBS No. N-100021-0001-3) T RC Pre se nta tio n Da te : Ma rc h 15, 2016 1 Agenda Pro je c t lo c a tio n Pro po se d impro ve me nts Ove rvie w Re c o mme
Fondren Road Paving and Drainage Improvements Creekbend to West Airport
(WBS No. N-100021-0001-3)
T RC Pre se nta tio n Da te : Ma rc h 15, 2016
1
ie ld o b se rva tio ns
xisting finding s
2
E ng ine e ring
Airpo rt
Airpo rt
ng ine e ring study in ye a r 2013
–
Po rta l a nd L ud ing to n sig na l impro ve me nts
–
Cut thro ug h tra ffic issue s 3
Cre e kbe nd We st Be llfort We st Airport
a nduse
4
wo (2) HCF CD c ha nne l c ro ssing s
T RO ha s 21 b us sto ps
e e s
E ng ine e ring finding s
de ntify de via tio ns
de ntify utility c o nflic ts
R re po rt
mpro ve mo b ility
mpro ve dra ina g e
mpro ve utilitie s
5
Ro a dwa y in po o r c o nditio n Pa ve me nt se ttle me nt
6
F a ile d Aspha lt pa tc h in c o nc re te Pa ve me nt in po o r c o nditio n
Da ma g e d c urb , e xpo se d re info rc e me nt Side wa lk in po o r c o nditio n
7
E sta b lishe d T re e s I ro n fe nc e e nc ro a c hing the Rig ht-o f-Wa y
8
9
We st Air por t to Sanfor d Dr ive Sanfor d Dr ive to Cr e e kbe nd
me dia n
me dia n
thic kne ss
10
Stor m:
ype B a nd BB inle ts
Sa nita r y:
Wa te r :
und e r sid e wa lk
Ga s:
T e le c ommunic a tion:
b e twe e n We st Be llfo rt to Cre e kb e nd
c a b le b e twe e n Po rta l Drive a nd Ba nksid e
e a st sid e
Str e e t Se g me nt 2011 ADT 2035 ADT Gr
R a te F
e n R
Cre e kb e nd to We st Be llfo rt 23,728 30,368 1.30% We st Be llfo rt to We st Airpo rt 24,002 29,681 1.25%
11
Str e e t Inte r se c tion 2013 AM 2013 PM 2035 AM 2035 PM F
e n R
Por ta l
A A A A We st Be llfo rt A
D D E L uding ton
A A A A
We st Air por t D D D E
Po rta l Drive
–
Sig na l upg ra de unde rwa y
We st Be llfo rt
–
Spa n wire d sig na ls
L uding to n
–
Sig na l upg ra de d in 2015
We st Airpo rt
–
Sig na l upg ra de d in 2013
uture b ike la ne F
so uth o f We st Airpo rt
uture b ike la ne a lo ng We st Airpo rt a nd We st Be llfo rt
uture b ike la ne a lo ng Cre e kb e nd
12
Ge ote c hnic al Inve stigation
a ults : 4 mile s so uth
fe e t
sta b ilize d
13
Phase I E SA Inve stigation
ma te ria ls spill inc ide nt
ig ht (8) RE C
urthe r inve stig a tio n
uding to n lie s in the 100-ye a r flo o dpla in
uding to n to We st Airpo rt lie s in the 500-ye a r flo o dpla in
14
15
Ove r land F low ID Ar e a (ac r e )
ODA-B 44
ODA- D1 76 ODA- D2 197 ODA- F 295
ODA-G 44
Dr ainage Syste m Ove r land F low Ar e a Str uc tur al F looding F E MA L
311 F looding
Syste m B ODA-B Syste m D ODA-D1 6 Syste m D ODA-D2 1 Syste m F ODA-F 4 Syste m G ODA-G
T
11
a ilwa te r:
–
2-ye a r : to p-o f-pipe (c ro wn)
–
100-ye a r: Willo w Wa te rho le 10-ye a r WSE
–
100-YR WSE 60.50, 10 YR WSE 56.80 a nd NG 59 to 61
16
Bankside We st Be llfor t L udington We st Air por t
–
Syste m E and Syste m G do no t a de q ua te c a pa c ity to c o nve y 2-
ye a r ra infa ll e ve nt.
–
Syste m D, Syste m E , Syste m F and Syste m G do no t ha ve c a pa c ity
to c o nve y 100- ye a r ra infa ll e ve nt.
uding to n a nd We st Be llfo rt is lo c a te d in 100-ye a r flo o dpla in a nd the surro unding a re a a re inunda te d b y mo re tha n six (6) inc he s
17
18
pro vid e d a s in-line d e te ntio n
pro vid e d fo r Syste m D, a s the a re a is within 100 ye a r flo o d pla in
he o utfa lls will re ma in unto uc he d a nd will a c t a s re stric to rs
De te ntion Ca lc ula tion Summa r y Str e e t Na me
Impa c t Ca use d b y Inc re a se d Pa ve me nt Width Inc re a se in Impe rvio us Are a City Crite ria Re q uire d De te ntio n Vo lume De te ntio n Me tho d Vo lume Pro vide d (a c ) (a c - ft/ a c re ) (a c -ft) (a c -ft)
F
e n R
1.34 0.50 0.67 In-L ine 0.67
Str e e t Na me Syste m Pr
Size F
e n R
Syste m A
30-inc h Syste m D 24-inc h to 6 X 6 RCB Syste m E 30-inc h Syste m F 36-inc h Syste m G 30-inc h to 4X3 RCB
50 52 54 56 58 60 62 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A B C D E F G E xist 2-YR Pro p 2-YR Gutte r E le v
19
We st Airpo rt L uding to n We st Be llfo rt Ba nkside Po rta l D140-03-00 D140-01-00
55 56 57 58 59 60 61 62 63 64 65 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 E xist 100-YR Pro p 100-YR ROW
Po rta l
20
We st Airpo rt L uding to n We st Be llfo rt Ba nkside D140-03-00 D140-01-00
21
Note : 10- foot le ft tur n lane s
re a lm
22
la ne s
wo (2) 12-fo o t
re a lm
Note : 10- foot le ft tur n lane s
23
Note : 11- foot le ft tur n lane s
la ne s
re a lm
24
25
26
Str e e t Inte r se c tion 2035 AM 2035 PM F
e n R
Po rta l A A
Sa nfor d
A A We st Be llfo rt C D L uding to n A A
South Me a dow
A A We st Airpo rt D D
27
sig na ls
ng ine e ring tra ffic study re c o mme nde d dua l le ft turns a t We st Airpo rt a nd We st Be llfo rt, ho we ve r re po rt c o nc lude d sing le le ft turn due to ROW a c q uisitio n limita tio ns
le ng ths” a t We st Airpo rt a nd We st Be llfo rt
28
250’ 250’
re c o mme nde d fo r le ft turn la ne s
29
ng ine e ring
ra ffic Sig na l Wa rra nt Ana lysis ne e ds to b e pe rfo rme d
xisting pe de stria n c ro ss wa lk striping
30
So urc e : Go o g le
31
OS E with the pro po se d impro ve me nts
re c o mme nd e d fo r le ft turn la ne s
a stb o und a nd we stb o und le ft turn la ne s a lso ne e d to b e e xte nd e d
350’ 300’
Ga s Sta tio n Ga s Sta tio n Wa lg re e ns Strip Ma ll
32
Sanfor d
ng ine e ring
ra ffic Sig na l Wa rra nt Ana lysis ne e d s to b e pe rfo rme d
Portal
Str e e t Inte r se c tion # Cor ne r s Cor ne r Clip F
e n R
We st Airpo rt 4 25’ X 25’ So uth Me a do w 1 20’ X 20’ L uding to n 2 20’ X 20’ We st Be llfo rt 4 25’ X 25’ Sa nfo rd 4 20’ X 20’ Po rta l 1 20’ X 20’
33
xisting 100-fo o t rig ht-
e mpo ra ry c o nstruc tio n e a se me nts ma y b e re q uire d
xisting Me dia ns
–
Appro xima te ly 22 me dia n o pe ning s
–
Ope ning e ve ry 360 fe e t
ma na g e me nt study)
ma na g e me nt study)
34
35
Me dia n c lo sure Drive wa y c lo sure
36
Me dia n c lo sure Drive wa y c lo sure
37
Me dia n c lo sure Drive wa y c lo sure
38
Pha se I I I Pha se I I Pha se I
We st Air por t to Cr e e kbe nd
39
Pha se I Pha se I I Pha se I V Pha se I I I
We st Airport to Cre e kbe nd
–
Pro vide s 11-fo o t la ne s
–
Pro vide s 15-fo o t me dia n
–
Pro vide 9.5-fo o t pe de stria n re a lm
mpro ve me nts: We st Be llfo rt, So uthme a do w, Sa nfo rd, Po rta l, L uding to n, a nd We st Airpo rt
40
E stimate d Constr uc tion Cost
Ge ne ra l Co nstruc tio n $1,330,680 Pa ving $7,866,804 Wa te r $1,632,870 Wa ste wa te r $164,944 Sto rm $2,522,330 Sig na l $1,200,000 Sub T
$14,735,628 Co nting e nc y (15%) $2,210,344 ROW Ac q uisitio n $125,000
T OT AL COST $17,070,972
imits o f the pro je c t shifte d to 150’ so uth o f Cre e kb e nd
41
Pe r mits
PDE S NOI
a ne c lo sure
DL R fo r ADA c o mplia nc e
lo o dpla in Ma na g e me nt Offic e (F MO)
42
Var ianc e s
L e ng th
43