fondren road paving and drainage improvements creekbend
play

Fondren Road Paving and Drainage Improvements Creekbend to West - PowerPoint PPT Presentation

Fondren Road Paving and Drainage Improvements Creekbend to West Airport (WBS No. N-100021-0001-3) T RC Pre se nta tio n Da te : Ma rc h 15, 2016 1 Agenda Pro je c t lo c a tio n Pro po se d impro ve me nts Ove rvie w Re c o mme


  1. Fondren Road Paving and Drainage Improvements Creekbend to West Airport (WBS No. N-100021-0001-3) T RC Pre se nta tio n Da te : Ma rc h 15, 2016 1

  2. Agenda Pro je c t lo c a tio n Pro po se d impro ve me nts • • Ove rvie w Re c o mme nda tio ns • • Sc o pe o f wo rk De via tio ns fro m Pre - • • E ng ine e ring F ie ld o b se rva tio ns • Va ria nc e s & Pe rmits E xisting finding s • • 2

  3. Project Location Cre e kbe nd Co unc il Distric t K • Bo unda ry stre e ts: Cre e kb e nd a nd We st • Airpo rt Appro xima te ly 1.5 mile s • We st Be llfort Ma jo r inte rse c tio ns: We st Be llfo rt a nd We st • Airpo rt Pre -E ng ine e ring study in ye a r 2013 • Pub lic Me e ting • Po rta l a nd L ud ing to n sig na l impro ve me nts – We st Airport Cut thro ug h tra ffic issue s – 3

  4. Overview F o ur (4) sig na lize d inte rse c tio ns L a nduse • • T wo (2) HCF CD c ha nne l c ro ssing s • Sc ho o ls • ME T RO ha s 21 b us sto ps • Churc he s • Se ve ra l tr e e s • 4

  5. Scope of Work Sc o pe o f Wo rk Purpo se Re vie w a nd ve rify Pre - I mpro ve mo b ility • • E ng ine e ring finding s I mpro ve dra ina g e • I de ntify de via tio ns I mpro ve utilitie s • • Pe rfo rm dra ina g e a na lysis • I de ntify utility c o nflic ts • Pre pa re PE R re po rt • 5

  6. Field Observations Ro a dwa y in po o r c o nditio n Pa ve me nt in po o r c o nditio n Pa ve me nt se ttle me nt F a ile d Aspha lt pa tc h in c o nc re te 6

  7. Field Observations Da ma g e d c urb , e xpo se d re info rc e me nt Side wa lk in po o r c o nditio n E sta b lishe d T re e s I ro n fe nc e e nc ro a c hing the Rig ht-o f-Wa y 7

  8. Street Assessment 8

  9. Existing Cross Sections We st Air por t to Sanfor d Dr ive 6 la ne s w/ 14-fo o t • me dia n 6 to 12-inc h c o nc re te • 3-inc h sub g ra de • 4 la ne s w/ 32-fo o t • Sanfor d Dr ive to Cr e e kbe nd me dia n 6 to 10-inc h c o nc re te • thic kne ss 3-inc h sub g ra de • 9

  10. Existing Utilities Stor m: T e le c ommunic a tion: Wa te r : 24 to 48-inc h RCP 16-4 inc h PVC d uc t line s • 20-inc h CI • • b e twe e n We st Be llfo rt to Built in 1970’ s • Built in 1974 • Cre e kb e nd Se ve n o utfa lls • L o c a te d o n we st sid e • Co mc a st ha s fib e r o ptic • T ype B a nd BB inle ts • und e r sid e wa lk c a b le b e twe e n Po rta l Sa nita r y: Drive a nd Ba nksid e Ga s: 27 to 42-inc h 2, 4 a nd 6-inc h IP ste e l L o c a te d in e a se me nt o n • • • Built in 1974 e a st sid e L o c a te d in e a se me nt • • Re ha b ilita te d in 2004 o n we st sid e • L o c a te d o n e a st sid e Multiple c ro ssing s • • 10

  11. Existing Traffic Analysis (Pre-Engineering) 2011 2035 Gr owth Str e e t Se g me nt ADT ADT R a te Cre e kb e nd to 23,728 30,368 1.30% We st Be llfo rt F ondr e n R oa d We st Be llfo rt to 24,002 29,681 1.25% We st Airpo rt 2013 2013 2035 2035 Po rta l Drive Str e e t Inte r se c tion AM PM AM PM Sig na l upg ra de unde rwa y – Por ta l A A A A We st Be llfo rt Spa n wire d sig na ls – We st Be llfo rt A D D E L uding to n F ondr e n R oa d Sig na l upg ra de d in 2015 – A A A A L uding ton We st Airpo rt Sig na l upg ra de d in 2013 – We st Air por t D D D E 11

  12. Bike Route No bike lane a lo ng F o ndre n • F uture b ike la ne F o ndre n • so uth o f We st Airpo rt F uture b ike la ne a lo ng We st • Airpo rt a nd We st Be llfo rt F uture b ike la ne a lo ng • Cre e kb e nd 12

  13. Geotechnical & Phase I ESA Ge ote c hnic al Inve stigation Phase I E SA Inve stigation Co he sive so ils • One (1) ha za rdo us • F a ults : 4 mile s so uth • ma te ria ls spill inc ide nt Gro und wa te r le ve ls :4 to 15 • E ig ht (8) RE C • fe e t F urthe r inve stig a tio n • Pa ve me nt : 12-inc h JRCP • Sub g ra de : 8-inc h lime • sta b ilize d 13

  14. Floodplain Map • Cre e kb e nd to Ba nkside lie s outside the 500-ye a r flo o dpla in • Ba nkside to L uding to n lie s in the 100-ye a r flo o dpla in • L uding to n to We st Airpo rt lie s in the 500-ye a r flo o dpla in 14

  15. Overland Flow & Flooding Complaints Ove r land Ar e a F low ID (ac r e ) ODA-B 44 ODA- D1 76 ODA- D2 197 ODA- F 295 ODA-G 44 Ove r land Dr ainage Str uc tur al F E MA 311 F low Syste m F looding L osse s F looding Ar e a Syste m B ODA-B 0 0 0 Syste m D ODA-D1 0 6 0 Syste m D ODA-D2 0 1 0 Syste m F ODA-F 0 4 0 Syste m G ODA-G 0 0 0 T otal 0 11 0 15

  16. Drainage Analysis Bankside Ra tio na l me tho d • Sma ll Wa te rshe d Hydro g ra ph me tho d • We st Be llfor t XP-SWMM • T a ilwa te r: • L udington 2-ye a r : to p-o f-pipe (c ro wn) – 100-ye a r: Willo w Wa te rho le 10-ye a r WSE – 100-YR WSE 60.50, 10 YR WSE 56.80 a nd NG 59 – to 61 We st Air por t 16

  17. Existing Drainage Analysis Re sults o f the hydra ulic a na lysis: • Syste m E and Syste m G do no t a de q ua te c a pa c ity to c o nve y 2- – ye a r ra infa ll e ve nt. and Syste m G do no t ha ve c a pa c ity Syste m D, Syste m E , Syste m F – to c o nve y 100- ye a r ra infa ll e ve nt. Syste m D, b e twe e n L uding to n a nd We st Be llfo rt is lo c a te d in 100-ye a r • flo o dpla in a nd the surro unding a re a a re inunda te d b y mo re tha n six (6) inc he s 17

  18. Proposed Drainage Analysis Pr opose d Pipe Str e e t Na me Syste m Size De te ntio n vo lume s pe r 2015 IDM • Syste m A - Syste m B - Re q uire d d e te ntio n vo lume is • Syste m C 30-inc h pro vid e d a s in-line d e te ntio n 24-inc h to 6 X 6 F ondr e n R oa d Syste m D RCB Syste m E 30-inc h Mo st o f the in-line d e te ntio n is • Syste m F 36-inc h pro vid e d fo r Syste m D, a s the 30-inc h to 4X3 Syste m G RCB a re a is within 100 ye a r flo o d pla in De te ntion Ca lc ula tion Summa r y Impa c t Ca use d b y Inc re a se d Pa ve me nt Width T he o utfa lls will re ma in unto uc he d • Inc re a se in Re q uire d City De te ntio n Vo lume Str e e t Impe rvio us De te ntio n a nd will a c t a s re stric to rs Crite ria Me tho d Pro vide d Na me Are a Vo lume (a c - (a c ) (a c -ft) (a c -ft) ft/ a c re ) F ondr e n 1.34 0.50 0.67 In-L ine 0.67 R oa d 18

  19. 2 YR HGL Comparison D140-03-00 D140-01-00 62 60 58 56 We st Airpo rt We st Be llfo rt Ba nkside uding to n 54 Po rta l 52 L 50 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 A B C D E F G E xist 2-YR Pro p 2-YR Gutte r E le v 19

  20. 100 YR HGL Comparison We st Airpo rt We st Be llfo rt uding to n Ba nkside Po rta l 65 64 63 L 62 61 60 D140-03-00 D140-01-00 59 58 57 56 55 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 E xist 100-YR Pro p 100-YR ROW 20

  21. Pre-Engineering Recommendation Six (6) 11-fo o t la ne s • 14-fo o t wide me dia n • 10-fo o t le ft turn la ne s • 10-fo o t pe de stria n • re a lm 6-fo o t Side wa lks • Note : 10- foot le ft tur n lane s 21

  22. Alternative 1: Proposed Cross Section F o ur (4) 11-fo o t inside • la ne s T wo (2) 12-fo o t • o utside la ne s 14-fo o t wide me dia n • 10-fo o t le ft turn la ne s • 9-fo o t pe de stria n • re a lm Note : 10- foot le ft tur n lane s 5-fo o t (min) Side wa lks • 22

  23. Alternative 2: Proposed Cross Section Six (6) 11-fo o t inside • la ne s 15-fo o t wide me dia n • 11-fo o t le ft turn la ne s • 9.5-fo o t pe de stria n • re a lm 5-fo o t (min) Side wa lks • Note : 11- foot le ft tur n lane s 23

  24. Proposed Public Utilities 24

  25. Proposed Public Utilities 25

  26. Proposed Public Utilities 26

  27. Proposed Intersection Analysis (Pre-Engineering) Sa nfo rd a nd So uthme a do w a re ne w • sig na ls 2035 2035 Str e e t Inte r se c tion AM PM Pre -E ng ine e ring tra ffic study Po rta l A A • A A Sa nfor d re c o mme nde d dua l le ft turns a t We st We st Be llfo rt C D F ondr e n Airpo rt a nd We st Be llfo rt, ho we ve r re po rt R oa d L uding to n A A c o nc lude d sing le le ft turn due to ROW South A A Me a dow a c q uisitio n limita tio ns We st Airpo rt D D GUNDA re c o mme nds lo ng e r “sto ra g e • le ng ths” a t We st Airpo rt a nd We st Be llfo rt 27

  28. West Airport 250’ 250’ Me dia n c o nso lida tio n • Sig na l upg ra de d in 2013 • Drive wa ys c lo se to inte rse c tio n • ROW a c q uisitio n c o nstra ints • Co rne r c lips • Sto ra g e le ng ths o f 250 fe e t • Sig na l re de sig n re c o mme nde d fo r le ft turn la ne s • 28

  29. Southmeadow (Proposed) Pro po se d sig na l pe r Pre -E ng ine e ring • T ra ffic Sig na l Wa rra nt Ana lysis ne e ds • to b e pe rfo rme d E xisting pe de stria n c ro ss wa lk striping • 27-inc h sa nita ry se we r re lo c a tio n • 29

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend