FM 156 (H ASLET C OUNTY L INE R OAD ) FROM I NTERMODAL P ARKWAY TO US 81 / US 287 Public Meeting December 13, 2018 December 13, 2018 FM 156 Public Meeting Project Overview FM FM 156 (Hasl 56 (Haslet Count t County Line Line Road) Pr


  1. FM 156 (H ASLET C OUNTY L INE R OAD ) FROM I NTERMODAL P ARKWAY TO US 81 / US 287 Public Meeting December 13, 2018 December 13, 2018 FM 156 Public Meeting

  2. Project Overview  FM FM 156 (Hasl 56 (Haslet Count t County Line Line Road) Pr ad) Project Limits oject Limits — From Intermodal Parkway to US 81/US 287 The purpose of this project is to improve safety, reduce congestion, improve capacity, and plan for future transportation needs. FM 156 Public Meeting December 13, 2018 2

  3. FM 156 Crash Analysis: Total Accidents 40 37 37 35 30 27 27 25 20 20 20 15 [VAL [V ALUE] UE] 10 5 0 Total Accidents 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. 100 Reported Crashes from 2014 to 2017 FM 156 Public Meeting December 13, 2018 3

  4. FM 156 Crash Analysis: Cause of Accident 14 12 12 12 10 10 10 Crashes on FM 156 Crashes on FM 1 8 7 6 6 6 5 4 4 4 4 3 3 2 2 2 2 2 1 1 1 1 1 1 0 0 0 0 0 0 Rear-End Opposite Single Vehicle Same Direction, Angle Left-Turn Collision Unknown Direction/Both Off Road One Straight Going Straight One Stopped Cause of Crash Cause of Crash 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 4

  5. FM 156 Crash Analysis: Type of Injury 40 34 35 30 Crashes on FM 156 24 Crashes on FM 1 25 20 18 15 11 10 5 3 3 3 2 1 1 0 0 0 Fatality/Incapacitating Injury Non-Incapacitating Injury Property Damage Only Ty Type o of I Injury 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 5

  6. FM 156 Crash Analysis: Pavement Conditions 30 27 25 23 Crashes on FM 156 20 Crashes on FM 1 18 15 13 10 9 5 4 3 2 1 0 0 0 0 Dry Wet Ice/Snow/Slush Pavement Conditions Pa ment Conditions 2014 2015 2016 2017 * January 2014 - September 2017 ** Crashes assumed to be on the main highway based on data. FM 156 Public Meeting December 13, 2018 6

  7. Project Overview Level of Service (LOS) at Intersections • LOS A through F where: - LOS A represents free flowing traffic - LOS F represents traffic conditions with heavy delays. FM 156 Public Meeting December 13, 2018 7

  8. Public Involvement  Goals Goals – Provide public involvement opportunities for stakeholders, roadway users, and the general community to engage with the project team and share feedback – Provide information for those interested in the project process and timeline through the webpage (www.txdot.gov). • Keyword search “FM156” FM 156 Public Meeting December 13, 2018 8

  9. Public Involvement  Pr Process ocess – Stakeholder Meetings (City and County) – Technical Work Group Meetings (working session for public agencies) – Public Meetings – Public Hearing – Traffic Noise Workshop after Environmental Approval (if noise abatement is warranted and deemed reasonable and feasible) FM 156 Public Meeting December 13, 2018 9

  10. Proposed Improvements / Considerations  Proposed six-lane urban section with raised curb center median south of Avondale-Haslet Road and bicycle / pedestrian accommodations.  Proposed four-lane urban section with raised curb center median north of Avondale-Haslet Road and bicycle / pedestrian accommodations.  Bicycle and pedestrian improvements will include: – 14 ft outside lane for shared use between vehicles and bicyclists on both sides – 5 ft sidewalk behind the curb on both sides FM 156 Public Meeting December 13, 2018 10

  11. Proposed Improvements / Considerations Evaluate three alternatives:  ALTERNATIVE 1 - Widen to both sides. Obtain Right-Of-Way (ROW) from east and west sides of the current roadway. – 120 ft existing ROW (typical) – 170 ft proposed ROW (typical) – Approximately 30.1 acres of additional ROW FM 156 Public Meeting December 13, 2018 11

  12. Proposed Improvements / Considerations Evaluate three alternatives:  ALTERNATIVE 2 - Widen to the east. Obtain ROW primarily from east side of the current roadway. – 120 ft existing ROW (typical) – 160 ft proposed ROW (typical) – Approximately 24.7 acres of additional ROW FM 156 Public Meeting December 13, 2018 12

  13. Proposed Improvements / Considerations Evaluate three alternatives:  ALTERNATIVE 3 - Widen to the west. Obtain ROW primarily from west side of the current roadway. – 120 ft existing ROW (typical) – 180 ft existing ROW (typical) – Approximately 30.4 acres of additional ROW FM 156 Public Meeting December 13, 2018 13

  14. Proposed Improvements / Considerations  Replace bridge at Johnson Creek and widen other existing bridges or add twin adjacent to existing bridge – Reduces cost of proposed bridges by utilizing the existing bridge.  Accommodate existing / planned transportation needs by others – Haslet Parkway – City of Haslet Schoolhouse Road & FM 156 Shared-Use Path FM 156 Public Meeting December 13, 2018 14

  15. Proposed Improvements / Considerations  Consider elimination of grade separation at the abandoned BNSF railroad crossing – Reduces cost by eliminating a new bridge at this location – Reduces cost by reducing additional ROW needed for new bridge – Improves access to FM 156 FM 156 Public Meeting December 13, 2018 15

  16. Proposed Improvements / Considerations  A noise analysis will be conducted and noise abatement will be evaluated for any impacts  Minimize additional ROW – Utilize existing ROW where possible – Utilize retaining walls where feasible – Widen from the existing centerline, each side, where possible FM 156 Public Meeting December 13, 2018 16

  17. Anticipated Schedule Timeline Timeline Activity Activity December 2018 Public Meeting #1 Early 2019 Identification of Preferred Alternative Mid 2019 Public Meeting #2 Mid 2019 90% Preliminary Design FM 156 Public Meeting December 13, 2018 17

  18. Anticipated Schedule Timeline Timeline Activity Activity Late 2019 Approved Preliminary Design Schematic Late 2019 Preparation of Right-of-Way Exhibits Early 2020 Public Hearing and Environmental Clearance Construction is anticipated to begin in 2025 and is currently estimated at $74 million. FM 156 Public Meeting December 13, 2018 18

  19. Alternatives Construction Cost Comparison Construction cost is currently estimated at $74 million. General cost comparison between alternatives:  Alternative 2 is the least costly of the alternatives at $74M.  Alternative 1 is approximately $1.9 million more than Alternative 2.  Alternative 3 is approximately $3.4 million more than Alternative 2. [CELLREF [CELLREF] [CELLREF [CELLREF] [CELLREF [CELLREF] Relative Construction Cost FM 156 Public Meeting December 13, 2018 19

  20. Share Your Input Submit comments b Submit comments by:  Completing a comment card  Email: FM156haslet@txdot.gov  Mail: Texas Department of Transportation ATTN: Natnael Asfaw, P.E. 2501 SW Loop 820 Fort Worth, TX 76133 While comments are always welcome, they must be received by Thur Thursda sday, Januar , January 3, 20 y 3, 2019 to be included in the official meeting documentation. FM 156 Public Meeting December 13, 2018 20

  21. Thank Y Thank You! u! Pr Project Contact Inf oject Contact Information rmation Natnael Asf Natnael Asfaw, P P.E., TxDO E., TxDOT Pr T Project Manager oject Manager Phone: (817) 370-6603 Email: FM156haslet@txdot.gov Website: www.TxDOT.gov Key Word: FM156 FM 156 Public Meeting December 13, 2018 21

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.