Flexible lines manufacturing
Claudio Bortolin (PH-UAT) Jan Godlewski (PH-DT) Bart Verlaat (Nikhef) Sven Vogt (MPI)
CO2 cooling and IBL interface meeting – 06 February 2014
Flexible lines manufacturing Claudio Bortolin (PH-UAT) Jan - - PowerPoint PPT Presentation
Flexible lines manufacturing Claudio Bortolin (PH-UAT) Jan Godlewski (PH-DT) Bart Verlaat (Nikhef) Sven Vogt (MPI) CO2 cooling and IBL interface meeting 06 February 2014 From S5 to IDEP Side Side C A Tile Calorie LAR 11m long
Claudio Bortolin (PH-UAT) Jan Godlewski (PH-DT) Bart Verlaat (Nikhef) Sven Vogt (MPI)
CO2 cooling and IBL interface meeting – 06 February 2014
2
Tracking LAR Tile Calorie
Side A Side C
A
( 1 : 1 ) B
( 1 0 : 1 ) A A
1 .4301 X5C rN i1 8-1 1 1 2-0401 01 .ipt E nd of the Flex L ine Part 1 1 1 Fa.W itzenm ann R S341 S00-U A 22S D A 1 2 R S341 S00-U A22S-D N 1 2.iam Fextube 1 2 novotek 1 522-3SO 1 .4301 X5C rN i1 8-1 1 522-3SO .ipt K F M . R O H RA N S.304 K Z, N W 1 6 L =30 D =1 7,2 / D =1 4 1 3 1 .4301 X5C rN i1 8-1 1 1 2-0401 02.ipt E nd of the Flex L ine Part 2 1 4 1 .4301 X5C rN i1 8-1 1 1 2-0401 03.ipt pipe elbow 3 1 5 Inner tubes.iam Innertubes 1 7 1 .4301 X5C rN i1 8-1 V A-RB B
D IN E N 20 21 6 - A 2 (420 x 594) H auptprojektion G ewicht.........:Flex L ine
Flex L ine Flex L ineC O 2-A TL A S-B E L L E
Projekt Max-Planck-Institut f r Physik (Werner-Heisenberg-Institut) gezeichnet geprueft geplottet Tag N am e 31 .01 .201 4 S.Vogt M nchen +0,15 1 4 2 7.1 3
stitch up the 1 0 layers Super-insulation 1 44,8 m m + 1 05m m = ca.250 1 44,97.2 7.3
CPart N. Description Dealer
Note 1 Flex Hoses 11m Witzenmann 16 24-36 5557404 Order sent 5th feb. 2014 2 T-Joint NW16 Novotek 20 15 5561313 To be signed by Purchase office 3 Clamping rings NW10-16 Novotek 92 23 5561313 To be signed by Purchase office 5 Centering and O- rings EPDM NW16 Novotek 34 15 5561313 To be signed by Purchase office 6 Centering and O- rings EPDM NW16 Novotek 20 7 5561313 To be signed by Purchase office 7 Right angle Valves Leybold CERN store 14 23 5563392 Order sent 5th feb. 2014 8 Final flange NW16 Novotek 35 23 5561313 To be signed by Purchase office 9 Flex hoses shorter 0.5m Novotek 14 15 5561313 To be signed by Purchase office 10 Glands VCR 1/8" Swagelok 20 stock 5556324 To be signed by Purchase office 11 Plug VCR 1/4" Swagelok 20 stock 5556324 To be signed by Purchase office 12 Gaskets 1/4" Swagelok 20 stock 5556324 To be signed by Purchase office 13 Glands VCR 1/4" Swagelok 20 stock 5556324 To be signed by Purchase office 14 Blind glands 1/2" Swagelok 40 4 5556324 To be signed by Purchase office 15 Gaskets 1/2" Swagelok 60 stock 5556324 To be signed by Purchase office 16 T-Joints VCR Swagelok 20 4 5556324 To be signed by Purchase office 17 Bored-Through reducer 1/16"-1/8" Swagelok 20 4 5556324 To be signed by Purchase office 18 VCR female nut 1/2" Swagelok 40 stock 5556324 To be signed by Purchase office
Rotatable connector: machining and orbital welding will be carried out at MPI
4
Nut Gasket Sealing glands VCR conn. 45°≅25 Nm
5
45° VCR ≅ 180° reverse VCR VCR ¼” thread pitch= 1.5mm Reverse VCR thread pitch= 0.5mm
VCR Connector (50 μm) Reverse VCR Connector (15-20 μm)
Profilometer measurements made by G. Romagnoli (PH-DT) at the EPFL (Lausanne) Pressure test at 160 bars and Helium leak test on the last version of the Reverse Vcr connector were successful.
6
“Preliminary results did not reveal any cracks”
7
Orbital welding test on two pieces of pipes with diameter 4mm carried out at CERN was successful. Pressure test at 186 bars: ok
8
9
Flex hoses will be delivered at CERN in max 6 weeks Preliminary assembly at CERN:
After receiving the material from Novotek and the pre-assembled rotatable connectors from MPI we can start the final assemblying of the flex lines Starting Week 7 Hopefully for week n.11 or 12 1 flex hose is available at the crystal palace and we could produce the very first flex line
10
Material orders were issued Rotatable connectors: welding material compatibility ok, pressure and leak tests ok Standardization of the sealing operations on-going Pre-assembly of the concentric pipes could start next week First complete flex line could be ready for week 10 Orbital welding of 4 mm pipes can be done at CERN: first test ok Final production could start from week 11 or 12