EPSCO Ltd
Energy Sector – Cooling System Solutions
EPSCO Ltd Energy Sector Cooling System Solutions EPSCO Chemically - - PowerPoint PPT Presentation
EPSCO Ltd Energy Sector Cooling System Solutions EPSCO Chemically Engineered Solutions, Practically Applied to Solve Emission and Efficiency-Related Problems in Cooling Systems Common Problems Sedimentary and Biological Fouling
Energy Sector – Cooling System Solutions
EPSCO
Chemically Engineered Solutions, Practically Applied to Solve Emission and Efficiency-Related Problems in Cooling Systems
Common Problems
– biofilms formed by
bacteria in circulating water
Scaling Deposits
– solids naturally present in water form surface deposits
Effects
Contact Between Air and Water
– reduced heat transfer – decrease in condenser performance
Up from Deposits
– significant weight on pack – system contaminants
sufficiently cooled
Impacts of Effects
costs
Warmer Water Temperature Decreased Water Flow Restricted Air Flow Reduced Condenser Performance
Fouled Fill-Pack
Warmer Water Temperature Decreased Water Flow Restricted Air Flow Reduced Condenser Performance
Fouled Fill-Pack
Potential Costs & Risks
– costly pack repairs and replacements – excessive downtime
– increase in fuel usage – decreased condenser performance
– surplus water usage – increased carbon emissions – increased plume
– airborne particulates (bacteria and water treatment chemicals)
Traditional Methods of Cleaning Cooling Towers
– causes irreparable damage to pack and drift eliminators – damages the surface of timber structures – removes wet rot protection – substantial down-time
Traditional Methods of Cleaning Cooling Towers
– results in substantial down-time – incurs the cost of new pack – disposal cost of old pack – access and handling Health & Safety concerns
– prolonged, regular treatment required – does not remove existing deposits or bio- film – limited ability to stop build-up
Patented EPSCO System
Patented EPSCO System
– pack assessed by our operatives – samples taken for laboratory analysis – specifically tailored to individual towers and cells – tower/cell mapped due to variation
– chemical solution determined by survey and laboratory analysis
Patented EPSCO System
– 12 days for hyperbolic towers, 3-4 hours for conventional forced draft cells – un-treated towers or cells may remain active – minimum disruption to production – non-intrusive
Replacement
– temperature difference improved by up to 3-4°C – cost of treatment recouped in around 6 months from resulting efficiency gains
Patented EPSCO System
Pre v's Post Treatment
500 1000 Pack Layers Weight (pounds) Pre Treatment Post Treatment Pre Treatment 214 522 548 576 563 Post Treatment 197 195 191 197 195 1 2 3 4 5
Note: Results from a 5-layer system
EPSCO – Cost Savings
– temperature reduction minimises plume
water into the system as less water is discharged into the atmosphere
– drastic improvements in condenser efficiency
the same fuel usage
Summary
is Increased
Save Money
EPSCO Ltd
Arran Road Perth PH1 3DZ Scotland UK