Environmental as a Project in French P

Roy Carryer

Alcatel-Lucent Submarine Netw

Pierre Guillaume

Ginger Environnement & Infras

ental Protection ject Objective ch Polynesia

tworks astructures

slide-2
SLIDE 2 enabling the next generation of networks & services

conference & convention

Presente

Masters in Environmental Planning and Masters in Environmental Planning and years’ experience in the permitting and environmental assessment of infrastruc projects, mainly in the marine environm – 12 years as a regulator in the public sector – 7 years as a consultant to private companies – 11 years as Director, Permitting and – 11 years as Director, Permitting and Environment with ASN Ro Al Em Te Mo

ter Profile

nd 30 nd 30 nd ructure nment: lic nd nd Roy CARRYER Alcatel-Lucent Submarine Networks Email: roy.carryer@alcatel-lucent.com Tel: (+44) 208 465 1524 Mobile Tel: (+44) 7770 382 124

slide-3
SLIDE 3 enabling the next generation of networks & services

conference & convention

Pierre is Senior Project Manager

Presente

Pierre is Senior Project Manager with the Marine & Coastal Environment department of GINGER. With a PhD in Marine Geology, he has worked in vario countries, mainly in the Mediterranean region, Pacific and Indian Oceans. He is currently project manager for the environmental monitoring of dredging w at FOS harbour (Marseille, France). at FOS harbour (Marseille, France). Pi En Em Te Mo

ter Profile

nt rious n e is g works Pierre GUILLAUME Environmental Consultant Email: p.guillaume@gingergroupe.com Tel: (+33) 4 42 99 27 64 Mobile Tel: (+33) 6 08 87 45 65

slide-4
SLIDE 4 enabling the next generation of networks & services

conference & convention

In the Beg

  • Minimal attention to en

route planning, enginee route planning, enginee methodologies

  • Undemanding regulato
  • Exemptions for incumb
  • Considered benign and
  • Considered benign and
  • Largely unaffected by t

eginning…

environmental factors in neering and installation neering and installation atory regimes mbent operators nd uncontroversial nd uncontroversial y trends in other industries

slide-5
SLIDE 5 enabling the next generation of networks & services

conference & convention

Signs of C

  • Longer and more comple
  • Privatisation, start-ups an
  • Privatisation, start-ups an

exemptions for state telec

  • Development of environm
  • EIA procedures become

based on sensitivity of re

  • Heightened perception of

potential liabilities at corp

f Change…

plex permitting procedures and repeal of old and repeal of old lecom entities nmental law worldwide e commonplace, often receiving environment

  • f environmental risk and
  • rporate level
slide-6
SLIDE 6 enabling the next generation of networks & services

conference & convention

The Complian

  • Ensure formal complianc

stated obligations, and lo stated obligations, and lo regulations

  • Complexity managed thro
  • f broader HSE complian
  • Driver is to minimise risks

compliances compliances

iance Mentality

nce with permit conditions, local environmental local environmental through EMP, often as part iance mechanisms sks arising from non-

slide-7
SLIDE 7 enabling the next generation of networks & services

conference & convention

Problems with the Co

  • Compliance is essential b

shifts in corporate environ shifts in corporate environ

  • Frequent reliance on broa

unrelated to conditions on

  • Effectiveness proportiona

sophistication of regulato value of environmental re value of environmental re

  • Essentially passive and r

Compliance Mentality

al but not sufficient given ironmental policy ironmental policy road statements of intent

  • n the ground

nal to strength and atory regime, not on the l resources l resources d reactive

slide-8
SLIDE 8 enabling the next generation of networks & services

conference & convention

Beyond Co

  • Values-driven, not passiv
  • Corporate environmental
  • Corporate environmental

require pro-active approa protection

  • Corporate citizenship and

seen as important eleme

  • Achievement of universa

standards becomes an o

  • Compliance remains a ke

Compliance

sive or reactive tal and CSR policies tal and CSR policies roach to environmental and the “green agenda” ents of business strategy sally high environmental

  • bjective in its own right

key element

slide-9
SLIDE 9 enabling the next generation of networks & services

conference & convention

Honotua and the the Environment

slide-10
SLIDE 10 enabling the next generation of networks & services

conference & convention

The Honotua Cable Syste

Domestic cable

stem in French Polynesia

International cable International cable

Hawaii - Tahiti

slide-11
SLIDE 11 enabling the next generation of networks & services

conference & convention

Honotua – enviro

  • International landing in

Hawaii subject to rigorous US rigorous US environmental permitting

  • Domestic system

subject only to relatively undemanding regime in French Polynesia

  • Highly rich and diverse
  • Highly rich and diverse

coastal marine environment

ironmental context

  • Environmental protection
  • Environmental protection

promoted as a project

  • bjective from Day 1
  • Equal support from

Purchaser and Supplier

  • f the System
  • Key mitigation principle –
  • Key mitigation principle –

design impacts out of the project from the start

slide-12
SLIDE 12 enabling the next generation of networks & services

conference & convention

The Coral Reef ef Environment

slide-13
SLIDE 13 enabling the next generation of networks & services

conference & convention

Overview of M

Integration of environmental expe

Project inception

  • Identification of key

sensitivities

  • Initial environmental

evaluation of options and regulatory review

Project de

  • Focused en

survey and

  • Mitigation m

(impact avo priority)

  • Integration with cable

route study

  • Joint site visits

priority)

  • Routing and

recommend

  • Compliance
  • Optimisation

in real time

f Methodology

xpertise at all stages of the project

development

environmental d study measures voidance as

Implementation

  • Integral part of

the shore-end team

  • Environmental

sensitisation of team

  • Monitoring and control

nd installation ndations ce and BMPs tion of the project e

  • Monitoring and control
  • Assistance and advice
  • Fine-tuning of

installation operations

  • Ensure compliance

and implementation of BMPs

slide-14
SLIDE 14 enabling the next generation of networks & services

conference & convention

Overview of M

Environmen

Constraints identification

  • Regulatory
  • Environmental
  • Socio-economic

Environme

  • Presentation
  • Detailed surv
  • Ecological se
  • Analysis of im
  • Analysis of im
  • Mitigation me
  • Recommend

f Methodology

ental study

mental study ion of constraints urveys l sensitivity f impacts Convey information

  • Clear communication to

non-specialists

  • Simple mapping of

sensitivities f impacts measures ndations

  • Practical advice
  • Level of precision
  • Inclusion of other

Information

slide-15
SLIDE 15 enabling the next generation of networks & services

conference & convention

The example

Characteristics of Moorea Island

  • Highly sensitive coral reef environment
  • Nautical and fishing activities
  • Nautical and fishing activities
  • Tourism related activities
  • Marine Management Plan
  • Marine Protected Area

ple of Moorea

nt

slide-16
SLIDE 16 enabling the next generation of networks & services

conference & convention

Project In

Selection of the landi

Criteria

  • Technical
  • Environmental
  • Economical

Opunohu Bay

t Inception

nding point at Moorea

Pao Pao Bay Maharepa Site Pao Pao Bay Pao Pao Station

slide-17
SLIDE 17 enabling the next generation of networks & services

conference & convention

Project Dev

Detailed environmental survey

Biological mapping Mitig Recommen

evelopment

ey of the landing point, Moorea

Ecological Sensitivity itigation measures Analysis of impacts endations

slide-18
SLIDE 18 enabling the next generation of networks & services

conference & convention

Project Dev

Ecological Sensitivity of

Simple mapping system to clearly Simple mapping system to clearly convey constraints and sensitivitie 3 levels of ecological sensitivity

  • Red = high
  • Yellow = medium
  • Green = low

evelopment

  • f Pao Pao Bay, Moorea

rly rly ities

slide-19
SLIDE 19 enabling the next generation of networks & services

conference & convention

Project Dev

Summary of Environm

Synthesis of issues and constraints to optimise the cable route in to optimise the cable route in Moorea lagoon:

  • Ecological sensitivity

Fringing coral reef

  • Human activities

Outfall from fruit juice factory Mooring ocean liners Fishing and recreational uses Fishing and recreational uses

  • Marine Management Plan

Marine Protected Area

evelopment

mental Issues, Moorea

ints

slide-20
SLIDE 20 enabling the next generation of networks & services

conference & convention

Impleme

Role of the environmental

  • Integral member of the shore-end
  • Integral member of the shore-end
  • Environmental sensitisation of the
  • Guide rather than “police” the ins

from the team to environmental ob

  • Adapt operations to real on-site e
  • Ensure conformity with regulatory
  • Check compliance with environm
  • Check compliance with environm
  • Continuously review activities in r

performance at subsequent landin

entation

tal specialist (not “monitor”!)

end team end team the team installation works, and get buy-in l objectives e environmental conditions tory requirements nmental protection measures nmental protection measures in real time to improve dings

slide-21
SLIDE 21 enabling the next generation of networks & services

conference & convention

Shore-end wor

  • rks at Moorea
slide-22
SLIDE 22 enabling the next generation of networks & services

conference & convention

Burial works rks at Moorea

slide-23
SLIDE 23

conf

Pacif

enabling the next generat

The 7th Internat

  • n

Pacif & InterCon

2010

conference & convention

acifico Convention Plaza Yokohama

ration of networks & services

national Conference & Convention

  • n Undersea Telecommunications

acifico Convention Plaza Yokohama rContinental The Grand Yokohama 11 ~ 14 May 2010 www.suboptic.org