1 Energy Efficiency & ESCO Services SUJAY KUMAR SAHA Head of Group Demand Side Management 2 About Tata Power-DDL Parameter Unit July 02 March17 % change OPERATIONAL PERFORMANCE AT&C Losses % 53.1 8.59 85% System
2
Parameter Unit July ‘02 March‘17 % change OPERATIONAL PERFORMANCE AT&C Losses % 53.1 8.59 85% System Reliability – ASAI -Availability Index % 70 99.51 41% Transformer Failure Rate % 11 0.84 90% Peak Load MW 930 1791 85% Length of Network
- Ckt. Km
6750 15378 128% Street Light Functionality % 40 99.41 150% CONSUMER RELATED PERFORMANCE New Connection Energization Time Days 51.8 5 90% Meter Replacement Time Days 25 5 80% Provisional Billing % 15 0.86 94% Defective Bills % 6 0.13 98% Bill Complaint Resolution Days 45 4 91% Mean Time to Repair Faults Hours 11 1.50 87% Call Center Performance - Service Level %
- 95
Payment Collection Avenues Nos. 20 6725 33525% Consumer Satisfaction Index %
- 90
OTHERS Capex (Cumm)
- Rs. Crs
1210 6393 428% Consumers Count 7 Lacs 15.8 Lacs 126% Employees Count 5600 3537 37%
One of the Most Successful Private Power Distribution Utility
License Area: North and North West Delhi (510
- sq. km)
License Period : 25 years
About Tata Power-DDL
Certifications : ISO 9001, 14001, 27001, 22301, 31000 ; SA 8000 ; OHSAS 18001 UN Global Compact Reporting
3
Dem and Response Dem and Managem ent Energy Efficiency Conservation
Dem and Side Managem ent
Dem and Side Managem ent ( DSM) is the implementation of those measures that help the consumers to use electricity more efficiently and in doing so reduce the utility costs. This, in turn, will help the electricity consumers to cut costs. Reduction or shift in energy use during critical periods for short duration delivered immediately Saving energy by taking an action that often becomes a habit Permanent reduction in energy use driven mainly by equipment upgrades Customer Awareness of peak power (KW) demand
Need for DSM and its benefits
NEED FOR DSM
- Flattened load curve helps
DISCOMs optimize power procurements costs (reduction of surplus power)
- Reduce overall costs of energy
systems – helps to meet people’s energy needs at a lower cost
- Preserve the environment
BENEFI TS OF DSM
- Peak Load reduction
- Reduce Cross Subsidy, thus
reduction of regulatory
- verhang
- T&D Loss reduction by reduction
load on network and pf improvement
- Reduce power shortages and
power cuts.
- Reduction of harmonics in
system, enhancing life of electrical assets
- Improve the reliability and
quality of power supply
- Capital deferment by optimizing
load
PwC January 2016 12
200 400 600 800 1000 1200 1400 1600 1800 0% 3% 6% 9% 12% 15% 18% 21% 24% 27% 30% 33% 36% 39% 42% 45% 48% 52% 55% 58% 61% 64% 67% 70% 73% 76% 79% 82% 85% 88% 91% 94% 97%
Load Duration Curve of TPDDL
Load Duration 0.00 200.00 400.00 600.00 800.00 1000.00 1200.00 1400.00 1600.00 Hrs MW
Demand wise duration of TPDDL
- TPDDL’s load is above 1600 MW for
- nly 16.5 hours
- Similarly,
TPDDL’s minimum drawl experienced was 323.82 MW with load staying below the 500 MW for 268.25 hours
TPDDL SYSTEM LOAD PROFI LE
Drawl Limit Time Slots Total Hours Above 1700 2 0.50 1600 – 1700 64 16.00 1500 – 1600 350 87.50 400 – 500 1012 253.00 Below 400 61 15.25
6
ESCO Service
Key Milestone Achieved :
- Empanelled by BEE as Grade 1 ESCO Rating
- Re-Empanelled six ESCO agencies for the Year 17-18
- Discovery of competitive energy audit price (range of Rs. 4000/ to Rs. 50,000/) as per load
and customer segmentation wise
- Collaborative partnership with ESCO project implementing agencies and technology solution
providers (like Honeywell, Katyani, Smart Joules)
Particulars FY 17 (Actual ) FY 18 (Actual) Cumulative Energy Audit conducted (MW) 19 MW 52.5 MW 71.5 ESCO Implementation (MW) 2 MW 6.58 MW 8.58 Objective:- To identify potential energy saving through audit and get benefit from guaranteed energy saving solutions & allied activities through implementation of energy performance improvement projects KPI UoM FY 18 FY 19 FY 20 FY 21 FY 22 Total (5 Yrs) Energy Audit Services MW 50 70 100 150 200 570 ESCO Implementation MW 20 30 40 50 50 190
USP:
- Investment Grade Energy Audit
- Partnership with OEM and Technology solution providers
- Performance guarantee from ESCO agency as per baseline
- Financing Model
Filtering and prioritizing - Energy Conservation Measures
P r i
- r
i t y
Payback – Between 6 – 36 months Payback – Less than 6 months Payback – more than 36 months
High Low
8
RESPONSIBILITY MATRIX
ESCO ACTIVITIES
Carry out detailed Energy Audit and provide recommendations w.r.t Cost-benefit analysis and payback period Project implementation plan for EE measures within defined timeframe Execution of project as per contract with consumer Monitoring and Verification (M&V)
- f energy savings
Complying with performance guarantee against annual energy savings or revenue sharing guarantee as per contract with the customers
Benefits of ESCO
Improved productivity Improved machine efficiency Savings in electricity bill CUSTOMER BENEFI TS
9
BENEFI TS TO TPDDL & SOCI ETY To
- ptim ize
TPDDL peak load consum ption, thus reduction of pow er purchase cost Reduced consum ption w ill lead to reduced greenhouse gases & carbon footprint
ESCO Customer TPDDL ESCO Customer TPDDL
Financial Options
ESCO Service
Savings in Hospital Utility through implementation of ESCO projects outside TPDDL Licensed Area CMC Ludhiana Hospital: 4 MW load; 22% energy saving in 9 months
ESCO Service
Savings in Hospital Utility through implementation of ESCO projects in TPDDL Area
- St. Stephen’s Hospital: 2.03 MW load; 20% energy saving in 12 months
Actual
13
M/s B.G.Shirke
INDUSTRY TYPE - CONSTRUCTION/FABRICATING UNIT
The energy saving measures implemented at M/S B.G. Shirke focused on Automatic Harmonic Protection and Motor Optimizing Solutions. Project Implemented in the month April 2017
SAVINGS ACHIEVED Savings of 10.34 lakh units in 6 months Investment of Rs 11.9 lakhs with payback in 6 months
5.5 % 5.4 % 5.3 % 4.9 % 4.3 % 4.2 %
50000 100000 150000 200000 250000 300000 350000 400000 450000 May-17 Jun-17 Jul-17 Aug-17 Sep-17 Oct-17 Energy ( Kvah )
Month Monthly Savings
Baseline kVAh Actual KVAH
14
Khosla Medical Institute & Research Society
Lighting 5% Cooling 51% Utilities 36% Miscellaneous 8% Lighting Cooling Utilities Miscellaneous
INDUSTRY TYPE - HOSPITAL LOAD PROFILE
The energy saving measures implemented at Khosla Medical Institute & Research Society focused on high energy consuming cooling equipment since they form the maximum load of the total consumption.
15
Khosla Medical Institute & Research Society
SAVINGS ACHIEVED Savings in monetary terms -INR 4.5 Lakh in 6 Months
16
Load Optimized Solution
r k V A kW Partial Load condition without electrical load and PF control at Machine level:
- Active Load: - kW
- Reactive Load: - rkVA
- Apparent Load: - kVA (billed)
17
Load Optimized Solution
r k V A New kW Partial Load condition with electrical load and PF control at Machine level:
- Active Load: - kW
- Reactive Load: - rkVA
- Apparent Load: - kVA (billed)
ESCO Use Case Calculation.xlsx
18
Loss Reduction
Energy Efficiency Use Case Calculator Sl No Items 1 Billed Max Demand (kVA) 100 2 Billed PF 0.9 3 Actual Max Load (kW) 90 4 Improved PF 0.999 5 Improved Billed Demand (kVA) 90.09 % of savings 9.9
Normal Electrical Network Distribution loss in industry
5%
Overall energy efficiency of Industry = 50% = 0.83 (17% T&D Loss) x 0.95 (95% Transformer efficiency) x 0.9 (90% motor efficiency) x 0.7 (30% loss in mechanical system like coupling/driver train/pump/valve) Capacitor Capacity kVAr requirement = kW[tanФ1 - tan Ф2] = kW[tan{cos-1 (cosФ1)} – tan{cos-1 (cosФ2)}] Reactive kVAr produced in case of lower voltage will be ratio of V1
2 / V2 2 (where V1 = actual voltage & V2 = rated
voltage) Capacitor consumes 0.2 to 6.0 Watt per kVAr Reduction of Distribution Loss % in kWh due to PF improvement from pf1 to pf2 = [1 – (pf1 / pf2)2] x 100%
ESCO Based LED Street Light for North DMC
North DMC Project Highlights
- Consortium partner - Havells
- Implementation and maintenance for seven
years under ESCO model
- 1.14 lakh lights in package 1 at Narela and
Rohini Zone
- TPDDL order Value – Rs. 77 Crore
(around)
- 0.9 lakh lights in package 2
- TPDDL order Value – Rs 64 Crore (around)
- Ensure guaranteed energy saving of 64%
North DMC Project Status
- Package 1 inaugurated by Mayor
North DMC on 17th October 2017, Implementation completed.
- Package 2 inaugurated on 2nd Nov
2017, Implementation is in progress
- Load reduction of 14 MW in TPDDL
area
19
20
Dem and Side Managem ent Achievem ent
S No DSM Program till date Scale ( Nos) Annual Energy Savings ( MU) Peak Load Reduction ( MW ) Annual CO2 reduction ( MT) 1 LED Lights 2,110,000 61.7 15.7 21,678.3 2 BEE 5 star Ceiling Fan w ith Crom pton 55,000 5 0.7 1,498 3 Non Star AC replacem ent Schem e 17,123 10.5 15.3 3,496.5 Total 7 7 .2 3 1 .7 2 6 ,6 7 2 .8
- Energy Savings: 6 7 .4 MU
- Load Reduction: 2 7 .1 MW
- CO2 Reduction: 2 2 ,2 7 7 MT
By saving unit through DSM initiative would result avoiding cross subsidy
- f
Rs 1 2 .8 crores for domestic consumers.
21
Awareness for DSM Programs
LED & AC Scheme stalls
- rganized at 4 Bachpan
Gully Events LED Camps organized at RWA meetings
AC Scheme Advertisement in Times of India, 5 May and 5 June 2017
Awareness via SMS LED Camps organized at various locations Pusa, Badli
AWARENESS S No. Particulars Numbers 1. Bachpan Gully Camp for AC & LED Scheme 4 2. RWA meetings 8 3. Newspaper Advertisements for AC Scheme 2 4. SMS sent for EESL LED Scheme 10,99,126 5. SMS sent for AC Scheme 9,28,651
Awards & Accolades – DSM
22
Green grid award at “4th Innovation with Impact Awards for Discoms” by ICC Asian Utility Innovators Award for “Demand Side Management Project” “DISCOM driven ESCO model for energy efficiency improvement in C&I category load” shortlisted under Energy Saving Product / Service Award”. “Innovative Financing and ESCO Model” award at “National Energy Efficiency Circle Competition 2017” by CII CII National Award for Innovative Services
23
TPDDL Bouquet of Services
Detailed Load Research
Utility Load Profiling Market Research Consumer Survey
- Develop load profile for each
consumer category
- Capture
end usage information like type of appliances, its qty., time of usage, vintage etc.
- Identify
target consumer category and target equipment
- Potential Assessment in terms of
Peak Reduction and MU savings Capacity Building for Discom & Regulator
State DSM action Plan
State Level DSM Regulations; 5 year Target Setting Formulation of DSM Schemes Development of EE programs for I&C consumers ESCO Services
Thank You
You may contact us: Sujay Kumar Saha; Mob – 9971488079; email – sujayk.saha@tatapower-ddl.com Ajay Kumar Kaundal; Mob – 9971392962; email - ajay.Kaundal@tatapower-ddl.com Sandeep Sharma; Mob – 9810315951; email – sa.sharma@tatapower-ddl.com Aarti Gulati; Mob – 9910177698; email – Aarti.Gulati@tatapower-ddl.com