Edgeley Pond + Park Stakeholder Meeting 03 September 28, 2017 Presentation Overview 1. Introduction 2. Overview of the Preferred Design 1. What we have heard 2. SWM functionality 3. Park development and phasing 3. Discussion 2


slide-1
SLIDE 1

Edgeley Pond + Park Stakeholder Meeting 03

September 28, 2017

slide-2
SLIDE 2

Presentation Overview

1. Introduction 2. Overview of the Preferred Design 1. What we have heard 2. SWM functionality 3. Park development and phasing 3. Discussion

2

slide-3
SLIDE 3

Design Team Status Update

Q4=60% CD 2018 Q1=90% CD Q2=Tender

slide-4
SLIDE 4

Black Creek Channel

NATURAL PASSIVE NATURAL ACTIVE NATURAL URBAN

Edgeley Pond and Park 4

slide-5
SLIDE 5

COSMOS 833 residential units (proposed) 1,608 new residents*

2019/2020 (estimated)

Adjacent Development Activity

ZZEN / MIDVALE 837 residential units (proposed) 1,615 new residents*

2019/2020 (estimated)

THE MET 572 residential units 1,104 new residents*

2018 (estimated)

EXPO CITY 1,935 residential units 3,735 new residents*

Phase 1 Towers 1 + 2 – 2016 Phase 2 Towers 3 + 4 – 2019 (estimated) Phase 3 Tower 5 – 2023 (estimated)

Private development concepts shown are renderings only and subject to Council approval *estimated

5

slide-6
SLIDE 6

This new open space will act as a catalyst for the VMC by supporting its dynamic and fast-paced transformation through innovative ecologically-sensitive stormwater management design, creation of unique spaces, and the seamlessly integration of parkland amenities where VMC residents and visitors can interact, learn, play, and grow.

Design Vision

6

slide-7
SLIDE 7

The Edgeley Park and Pond design is a dynamic and flexible framework. The design is based on the following guiding principles:

  • 1. Celebrate Storm Water
  • 2. Establish Habitat and Enhance Ecology
  • 3. Create New Connections
  • 4. Activate and Create New Opportunities
  • 5. Educate and Inform
  • 6. Create an Iconic VMC Park
  • 7. Design a Park for the Future

Guiding Principles

7

slide-8
SLIDE 8

Concept 1 Sculpted Landforms Concept 2 Terraced Landforms Concept 3 Basins + Ecologies

Concept Development

8

slide-9
SLIDE 9

Feedback:

  • Concept 1 was favoured with a

balance of natural and urban elements, multiple pathways + less maintenance

  • Main east-west bridge should

be a priority

  • Skate loop was favoured
  • Concern for visibility into the

park and general park safety

  • Parking provisions were a

concern

  • Stakeholders wanted a

prominent feature off of Jane Street to signify park entry

  • SWM functionality is essential;

park features are secondary

Public + Stakeholder Feedback

9

slide-10
SLIDE 10

Construction summer 2018:

  • Urban Plaza (Jane + Hwy 7)
  • Iconic landforms
  • Open water body
  • Enhanced Black Creek and

aquatic planting

  • Maintain existing island and

mature vegetation

  • Enhanced ecology and

meadow planting

  • Two SWM LID’s
  • Walking + cycling trails
  • Flexible lawn area
  • Strata park - separate

contract, timing TBD

Design Concept

Phase One

10

slide-11
SLIDE 11
  • Main east-west bridge
  • North bridge
  • Community gardens
  • Park pavilion: integrated

shade structure with 4 WC + community room facility

  • Public art

Design Concept

Phase Two

11

slide-12
SLIDE 12

Cost Reconciliation

Cost Analysis Underway

12

slide-13
SLIDE 13
  • Hydrologic and hydraulic

simulations based on current Humber River watershed models for existing and future land use

  • Pond improvement scenarios

include an additional consideration for future climate variability simulated by increasing flow rates by 20%

Stormwater Functionality

Current limits of Regulatory Floodplain

13

slide-14
SLIDE 14
  • Black Creek corridor renewed

along west side

  • Central island and established

foliage to be preserved

  • Mix of hard and soft edges to

reshape basin for flood control

  • Water quality to be provided at all

inlets by OGS and LID treatment train approach

  • New outlet structure to integrate

with urban plaza at northeast corner of Jane + Hwy 7

Stormwater Functionality

Managing SWM in the Park

14

slide-15
SLIDE 15

Stormwater Functionality – Regional Water Level

Scenario 1 – Baseline Condition

15

slide-16
SLIDE 16

Stormwater Functionality – Regional Water Level

Scenario 2 – Pond Improvements

Proposed Culvert: 3.7m W x 1.5m H x 64.5m L 16

slide-17
SLIDE 17

Stormwater Functionality – Regional Water Level

Scenario 2 – Pond Improvements

Ongoing grading design + coordination with Zzen + Midvale 17 increase berm length + height increase private drive slope

slide-18
SLIDE 18

Stormwater Functionality – Regional Water Level

Scenario 3 – Pond Improvements, Culvert Replaced

Proposed Culvert: 15m W x 3m H x 64.5m L 18

slide-19
SLIDE 19

Stormwater Functionality – Regional Water Level

Scenario 4 – Pond Improvements, Culvert Replaced

Proposed Culvert: 3.7m W x 1.5m H x 64.5m L + 8.5m W x 3mH x 64.5m L 19

slide-20
SLIDE 20

2 hrs after rain storm start Peak – 2hr 48 min 4 hrs after rain storm start

Conceptual Representations 20

2 Year Storm Event

Understanding the Influence of SWM in the Park

slide-21
SLIDE 21

Conceptual Representations 21

2 Year Storm Event – Interim Conditions

Understanding the Influence of SWM in the Park

slide-22
SLIDE 22

47 min after rain storm start Peak – 1.5 hrs 3.5 hrs after rain storm start

Conceptual Representations 22

August 19, 2005 Storm Event

Understanding the Influence of SWM in the Park

slide-23
SLIDE 23

Conceptual Representations 23

August 19, 2005 Storm Event – Interim Conditions

Understanding the Influence of SWM in the Park

slide-24
SLIDE 24
  • Ongoing coordination between

design team and CoV

  • O+M items will include:
  • LID maintenance
  • OGS maintenance
  • Flood event maintenance
  • Snow removal extents
  • Active use programming

maintenance (eg play equipment, splash pad, adult exercise equipment maintenance etc.)

Operations + Maintenance

Anticipated level and frequency of care

24

slide-25
SLIDE 25

Park Programming

25

  • Active use focused on

strata park area

  • Flexible lawn area north
  • f Zzen / Midvale and

east of The Met

  • Dog off-leash area east
  • f The Met
  • Walking trails in valley
  • Adult exercise

equipment along MUP

  • Multiple park entry

points along Jane St and future Maplecrete Rd extension

slide-26
SLIDE 26

Sustainable Transitional Water Feature

Demonstrate the Relationship Between SWM + Black Creek

26

  • Only use SWM in system,

no potable water top-off

  • Sustainable transitional

feature will be wet or dry depending on storm events

  • Feature will have both

water and plant material

  • Overflow connection

directly to Black Creek

slide-27
SLIDE 27
  • Accommodate layby parking,

4m MUP and pedestrian connections to valley trails

  • Sculpted landforms along Jane

Street

  • CPTED principles for

streetscape and views into the park

  • Blue Green Streets focus with

street tree planting with understory, maximize permeable surfaces

27

Jane Street

Urban and Unique

slide-28
SLIDE 28
  • Key sites were

identified that include a mix of very public and high traffic routes as well as art that can be discovered along less traveled valley paths.

  • Several locations are

within the flood zone which will heighten the dramatic setting. Damage due to flood events will need to be evaluated prior to installation.

28

Public Art

Art Opportunities

slide-29
SLIDE 29

Education

Tell the Black Creek Story

29

Historical Flooding Pylon Major Signage – Lit Pylon Minor Signage – Pylon

slide-30
SLIDE 30

Planting Strategy

Ecological Clusters

30

  • Mix of aquatic, wetland,

marsh and meadow planting

  • Sod is limited to flexible

use areas, strata park, 1m buffers along valley trails and the amphitheater

  • Native focused

perennial planting in urban plazas, urban mews and strata park

slide-31
SLIDE 31

Ecological + Event Scheduling

31

slide-32
SLIDE 32

Main Bridge

Phase Two

32

West Bridge Island Section East Bridge Typical Section

slide-33
SLIDE 33

Park Pavilion

33

Elevation Plan Community Room WC Storage Utilities Storage WC WC WC Copper roof fascia and trim Ivory concrete panel Terracotta concrete panel Metal posts and doors Ipe wood bench top Concrete bench base

slide-34
SLIDE 34

Circuits + Cycling

34

slide-35
SLIDE 35

Circulation + Lighting

35

slide-36
SLIDE 36

Materials + Parking

36

18 SPOTS 10 SPOTS 6 SPOTS 17 SPOTS 6 SPOTS TOTAL OF 57 SPOTS

slide-37
SLIDE 37

Materials + Parking

37

18 SPOTS 10 SPOTS 6 SPOTS 17 SPOTS 6 SPOTS TOTAL OF 57 SPOTS

slide-38
SLIDE 38

December 21 June 21

Shadow Impacts

Proposed Developments

38

10:18 am 12:18 am 2:18 pm 4:18 pm

slide-39
SLIDE 39

39

View of Skating Loop / Pavilion

Looking Northwest

slide-40
SLIDE 40

40

Bird’s Eye View

Looking North

slide-41
SLIDE 41

41

View from the Bridge

Looking Southeast

slide-42
SLIDE 42

West LID

Looking Southeast

slide-43
SLIDE 43

Urban Plaza

Looking North

slide-44
SLIDE 44

Next Steps

  • Final Public Meeting September 28
  • 60% Contract Document Phase 1 October – December
  • VMC Sub-Committee Presentation October 18, 2017
  • Ongoing Technical Advisory Committee Meetings
  • 90% Contract Documents Phase 1 January – March
  • Tender Phase 1 contract documents Spring 2018

44

slide-45
SLIDE 45

Discussion

1. What are your thoughts on the preferred design and proposed phasing for Edgeley Pond + Park? 2. Do you have any advice / information for the City and consultant team to consider in moving forward with the development of the detailed design? 3. Any other advice for the City and consultant team?