terrill pond dam october 2014 terrill pond
play

Terrill Pond Dam-October, 2014 Terrill Pond NHFG created pond 20 - PowerPoint PPT Presentation

Terrill Pond Dam-October, 2014 Terrill Pond NHFG created pond 20 acres shallow (max depth 8) Management Trout Pond-4 th Saturday in April Fly Fishing Only Popular spot for local anglers Stocked with brook trout


  1. Terrill Pond Dam-October, 2014

  2. Terrill Pond • NHFG created pond • 20 acres • shallow (max depth 8’) Management  Trout Pond-4 th Saturday in April  Fly Fishing Only  Popular spot for local anglers  Stocked with brook trout from Berlin Hatchery Terrill Pond-from the boat launch

  3. Dam Safety Deficiencies found in 2009 during a routine inspection – Dams are typically inspected every 5 years – Latest scheduled inspection was in 2016

  4. Dam Safety Deficiencies Piping and erosion on right abutment Displaced stop log bay slab -4” Eroded crest and exposed cutoff wall

  5. More Deficiencies Sinkholes and wet areas on right embankment Eroded upstream face Trees and brush within 15 feet of end of dam Auxiliary spillway overgrown with trees Evidence of piping on left embankment

  6. • Red area surpasses 70 F ° =Low trout catch rates • Pink area= lowered trout abundance

  7. Water Temperature Thermal impairment • Greater than 72F º lethal to juvenile brook trout • Long exposure times > 75F lethal to all age classes of brook trout Year Outlet Inlet 79.5 66.5 2014 2013 81.3 69.8 2012 81.4* 73.1 2011 81.4** - 83.7 - 2010 Crawdads big enough to eat! *2012-Aug 4 **2011-Jul 22

  8. • Temperature Model without dam Blue indicates favorable water • temperatures for trout

  9. Options? • Repair dam? • Remove dam? – Seasonal stocked trout – Improve coldwater fishery fisheries habitat and restore aquatic – Annual dam registration connectivity fees, maintenance – Alleviate dam fees and – Historical value maintenance – May alleviate the need to stock trout

  10. NHDES Dam Bureau FY22-23 Capitol Budget Reconstruction of spillway wall and embankments estimate ~$600,000 (“rough estimate” no design work has been done yet)

  11. No estimate to remove the Dam has been done yet.

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend