Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Quarterly Status Report Presented to the Citizens' General Obligation Bond Oversight Committee For the First Quarter of FY 18-19 - as of September 2018 Traffic Company&


  1. Earthquake Safety and Emergency Response Bond Program 2010 & 2014 Quarterly Status Report Presented to the Citizens' General Obligation Bond Oversight Committee For the First Quarter of FY 18-19 - as of September 2018 Traffic Company& Forensic Services Public Safety Building $163.3M $230.5M ... - Division Auxiliary Water Suppy System TI. $102.6M Neighborhood Fire Stations $80.3M Neighborhood Fire Stations $66.9M Office of the Chief Medical Examiner $67.5M Appropriated Unallocated Interest 1, $4.4M Emergency Firefighting Water System $54.5M - .. Cost of Issuance ii $48M Police Facilities $29.6M Estimated Surplus from PSB $6.2M 'ost of lssuanc / 1 5M .. . ..... -,

  2. ESER Bond Program 2010 & 2014 I Executive Summary I. Highlights and accomplishments II. Upcoming milestones Construction continues on track for EFWS's • TCFSD Design & CM/GC teams 100% DD Pumping Stations 1 and 2 deliverable on 11/16/18. • FS5 completed roofing and began interior work • FSS complete building shell and interior work • FS16 completed interior work and placed • FS16 final completion and SFFD move-in underground storage tank • FS35 completion of DD phase (building) and CD • FS35 PMND issued; BCDC permit submitted phase (float), CEQA determination (FMND), and • Traffic Company & Forensic Services Division BCDC permit (TCFSD 2014) Abatement completion mid-April. CM/GC pre-con underway Ill. Bond sales and appropriations IV. Risks, issues or concerns on budget, scope or schedule • City has issued six bond sales for ESER 2010 On-going challenging bid environment affects: totaling $412,300,000. $416,758,553 has been • Very active marketplace produces scarcity of appropriated, inclusive of interest-earned. labor resulting in fewer bidders/less Additional interest earned of $500K is expected completion and raises costs, i.e. 10% in early 2019. upcharge for market conditions, and as well • City has issued three bond sales for ESER 2014 responsiveness of trades to schedule totaling $400,000,000. • Original bond budgets that prove insufficient impact project scope • Unavailable precise reporting of City staff labor charges

  3. Current Phase: Closeout Public Safety Building (PSB 2010 - $230.5M) Completion Date: February 2016 Status of budget Recent accomplishments • Estimated surplus from $230.5M 0 Actuas PSB is $7.2M (including Encumbrances portion of current 0emabngEalan Future Bond Sale project balance, to be - $0 $50. Soso Millions $100 $150 $200 realized post financial close out). Bud ,g Con Frojct Control Upcoming milestones • Financial close out is expected to begin in early 2019. I L. 1L:j71W r

  4. Neighborhood Fire Stations (NFS 2010 — $66.9M) Current Phase: Various Completion Date: December 2019 Recent accomplishments Status of budget • FS 16 - Interior work complete; $66.9M OACtuS building shell complete; UST M Ecumbracos placement complete; fuel oil M Remaining Balance - system and site work in progress Future Bond Sale SO • FS 5 - Roofing complete; 510 $30 $20 $50 $70 Millions $40 $so emergency generator, ERV units, Budget Allocation and exhaust fans placed on Focused Scope (75) Seismic & Comprehensive (5) rooftop; interior work in progress; insulation and drywall complete; exterior wall rainscreen system in • Planni n g - progress Design - • FS 14 Generator— NTP to GHD B i d / Award Engineers on Aug 8, 2018 Construction r Complete Cancelled Upcoming milestones 80 total projects • FS 16— Final completion and SFFD move-in November 2018 • FS 5 - Complete building shell and interior work • ic 1L1trr1-rr_ 1flflOL flflc k Ii - 2018 V ' • ' • Apparatus Bay Doors Pkg. 6 (7 FSs) Invitation to bid in late 2018 -

  5. Neighborhood Fire Stations (NFS 2014 — $79.9M) Current Phase: Various Completion Date: December 2020 Status of budget Recent accomplishments 80.3M $2535 Actu&s • FS 31 Generator - Submitted to DBI for permit on I - T] Encum b rance s 00 7/8/18 7 Remaining Balance • FS 2 Generator —GHD's 95% CDs completed on 9/28/18 Future Fcrd Sale FS 19 Generator— DD submittal by GHD to PUC/PG&E so 050 550 570 $80 Millions • 010 520 530 $40 on 9/28/18 Budget Allocation 10 of 17 FSs complete • App Bay Doors Pkg. 4 Ancillary - NTP to DWN on 4/9/18 • App Bay Doors Pkg. 3 (10 FSs) - ~th Seismic & Focused Scope (32) • Showers Pkg. 2 (FS 17, 19, 33) - Invitation for Bids Focuse T 5cc 3 (10) Cc Er ers e 5) advertised on September 7, 2018 Planning • FS 35 - NTP for DD phase issued on 7/20/18; Planning - - - - issued CEQA PMND on 9/5/18; 20 day comment period• fence proposal approved; contractor released • Pier 26 - Cnstru01cn to fabricate; revised electrical design under review by - PG&E 47 total projects Upcoming milestones Exterior Envelope Pkg. 4 (FS 22) —Substantial Completion in October 2018 • CEQA and permit submittal to DBI by the end of October • FS 2 Generator - • FS 19 Generator - 95% CDs end of November Permitted in November; Informal bid • FS 31 Generator - Bids due on Oct 9, 2018; NTP in early 2019 • Showers Pkg. 2 (FS 17, 19, 33) - RFQ/RFP for specialty door JOC in fall 2018 • App Door Pkg. 5 (17 FSs) - Planning to issue FMND; 90% CDs for float; 100% DD for building • FS 35 - Complete electrical work and installation of the security fence by • Pier 26 - November 2018 • Roof Pkg. 5 - Financial Closeout late 2018

  6. Emergency Firefighting Water System Current Phase: Various Completion Date: Dec. 2020 (ESER 2010 — $102.6M) Status of budget Recent accomplishments 102.6M • Construction continued for Pumping Station 1 7- 172 5559 Encumbrances (WD-2686) and Pumping Rem a ining Bal anc e S20 S40 SO S60 Station 2 (WD-2687) SSO S100 Millions contracts. Planning Budget Allocation a Dsgn Pmurrnent or Cortstrnctin Si.thstnt1 FTh1 Gnpietn Ca ncefled Postponed Inrriiryiirici miIctr1r1c3c I 'U 48 total projects - • AWSS Pipeline Improvements contract - Bid due October 2018. L,

  7. Emergency Firefighting Water System Current Phase: Various Completion Date: December 2020 (ESER 2014 - $54.5M) Status of budget Recent accomplishments 54.5M MA duls $13.55 En cum b ra nces • Construction continued for Rerr crce Irving Street Pipeline, Future Bond Sc Ic Ashbury Bypass Pipeline SO $10 $20 $50 $40 $50 Millions and Mariposa/Terry Budget Allocation Francois pipeline contracts. Upcoming milestones Pnocuernent or Bd/Awerd Canstmctcn :1 • 19th Avenue Pipeline Sue contract - Advertise t Fne Compieon October 2018 — Oonoiete ' 2 ,-- '*\ ; ii --- • •'

  8. Current Phase: Various Police Facilities (PF 2014 - $29.6M) Completion Date: July 2019 Status of budget Recent accomplishments • Firearms Simulation Training 29.6M Facility: Final Completion in E nc umbr a nces - - ernn?rce August 2018. Future 3cridSae • MEP Package 2— Bayview and $5 $29 SO $10 S15 $25 $30 M i ll i ons Tenderloin: Pre-construction Budget Allocation meeting occurred on 9/10 • Northern, Richmond, Taraval Station: New back-up Planning generator and fuel tank at Northern and Richmond Design J 'BiddingiAword Station installed; Taraval Station will be substantially Construction Completed completed by end of September 2018. = Cancelled On-Hold Upcoming milestones Northern, Richmond, Taraval Station: Northern and Richmond • 15 total projects (12 loc.$) Station will be substantially completed in early 2019. MEP Package 2 - Bayview and Tenderloin: Construction • - .••• . mobilization at Tenderloin Station on 9/24, mobilization at Rlb Bayview Station on 9/28; construction to begin October 2018. Mission Police Station and Police Academy Renovation -. • 4 . project are on-hold until spring / early summer 2019. •— - V iI!!

  9. Office of the Chief Medical Examiner Current Phase: Closeout Completion Date: March 2018 (OCME 2014 — $67.5M) Status of budget 67.5M $024—j DAtuele Upcoming milestones J Encumbrances - Q Remaining FeIence • Contractor to complete -- Future Bond Sale punch list. $LE $0 510 920 930 $50 $00 $70 Mill i ons • City to issue Certificate of Acceptance. • Final Payment to CM/GC and Executive Architect. - / / ion $1.4 2% % V RA --.- $14.I1M CDnucn - 22% 0 ProjctCcntrc. -- Other di 9

  10. Traffic Company & Forensic Services Division Current Phase: Design (TC&FSD 2014 - $163.3M) Completion Date: Summer 2021 Status of budget Recent accomplishments: $163.3M* • 50%DDon 10/5/18. ActueIs m Encumbrances • CDR Phase 2 approval on - 0 Remaining Balance Future Bond Sale 10/15/18. SO $1 50 Millions $50 $500 • Round 2 o DD user Includes savings from the cost of issuance Budget Allocation meetings completed 10/18. • Site Permit approval $153M Additional Funding Sources: 10% Construction obtained from Planning & Project is in funding deficit Project Control $296M DBI. Final approvals pending of $17.3M —following are sources: 18% Site Control from SFFD & BSM. Reserve $j17M ESER2010 Interest: $500K ESER2010 PSB savings: $7.2M ESER2014 Estimated COI Savings: $1M CPC Source: $8.61VI - Upcoming milestones: • Architectural design team & CM/GC team working through Design Development phase with 100% DD due on 11/16/18. • Site Permit final approval eminent. I - 1 • Indicator & Production Pile Permit package to follow final approval of site permit. -- ., - Mir

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.