e ducation n eeds a ssessment
play

E DUCATION N EEDS A SSESSMENT Advisory Committee Meeting V C - PowerPoint PPT Presentation

Western Interstate Commission For Higher Education S OUTHEAST K ING C OUNTY H IGHER E DUCATION N EEDS A SSESSMENT Advisory Committee Meeting V C OVINGTON , W ASH ASHINGTON N OVEMBER 18, , 2016 ALASKA ARIZONA CALIFORNIA COLORADO


  1. Western Interstate Commission For Higher Education S OUTHEAST K ING C OUNTY H IGHER E DUCATION N EEDS A SSESSMENT Advisory Committee Meeting V C OVINGTON , W ASH ASHINGTON N OVEMBER 18, , 2016 ALASKA • ARIZONA • CALIFORNIA • COLORADO • HAWAI‘I • IDAHO • MONTANA • NEVADA • NEW MEXICO • NORTH DAKOTA OREGON • SOUTH DAKOTA • UTAH • WASHINGTON • WYOMING • U.S. PACIFIC TERRITORIES & FREELY ASSOCIATED STATES

  2. A GENDA  Welcome & & In Intr troductions (9.00 – 9.15 AM)  Mee eeting Goa oals (9.15 – 9.20 AM)  Update on on th the e WSAC Mee eeting (9.20 – 9.30 AM)  Prop oposed Additions an and Mod odif ifications to o Prelim liminar ary Report (9.30 – 10.30 AM)  Brea eak (10.30 – 10.45 AM)  Fee eedbac ack fr from om th the e Advi visory ry Com ommittee for or In Inclu clusion in in Fin Final al Rep eport (10.45 – 11.45 AM)  Next xt St Step eps (11.45 AM – 12.00 PM)

  3. W ELCOME WSAC & WICHE

  4. I NTRODUCTIONS Advisory Committee

  5. M EETING G OALS  Provide an update on the WSAC meeting  Present proposed additions and modifications to the Preliminary Report  Solicit feedback from the Advisory Committee for inclusion in the Final Report

  6. WSAC M EETING Washington Student Achievement Council

  7. P ROPOSED A DDITIONS & M ODIFICATIONS Preliminary Report

  8. S OUTHEAST K ING C OUNTY WGU-W ASHINGTON E NROLLMENT BY S TUDENT L EVEL AND C OLLEGE , O CTOBER 2016 Undergraduate Graduate Total Business College 143 36 179 Health Professions College 45 10 55 Information Technology College 59 3 62 Teachers College 59 67 126 Total 306 116 422

  9. S OUTHEAST K ING C OUNTY WGU-W ASHINGTON E NROLLMENT BY C ITY , S TUDENT L EVEL , AND C OLLEGE , O CTOBER 2016 Undergraduate Graduate Total Technology College Technology College Health Professions Health Professions Teachers College Teachers College Business College Business College Information Information College College Total Total Total 3 1 4 0 8 0 0 0 3 3 11 BLACK DIAMOND 13 4 4 7 28 5 0 1 5 11 39 COVINGTON 9 0 1 12 22 1 0 0 13 14 36 ENUMCLAW 25 8 10 6 49 6 2 1 7 16 65 MAPLE VALLEY 2 1 1 0 4 0 0 0 1 1 5 RAVENSDALE 52 14 20 25 111 12 2 2 29 45 64 Total

  10. WGU – W ASHINGTON S TUDENT T RANSFER I NSTITUTIONS , A UGUST 2016 New Students Cumulative Active Students Over Previous 12 Graduates Months 143 36 179 Green River College 45 10 55 Highline College 59 3 62 Renton Technical College 382 183 128 Total

  11. A DDITIONAL I NFORMATION FOR R EPORT  Private Institutions  Distance Education Enrollments  RN to BSN Programs in the Region  Occupational Projections for the Region  Suggested Model for Operating Plan  Cost Estimate for Suggested Model

  12. P OTENTIAL M ODELS One Facility, One Facility, Online Learning Criteria Multiple One Institution Center Institutions Locally Accessible . Flexible Program Offerings . Adequate Student Support services Designed for Adult Learners Financially Sustainable

  13. S UGGESTED M ODEL : S TRUCTURE  Provid ider(s)  Lead provider  Partners as needed  Space  4 classrooms  3 offices  Storage & non-assignable space (hallways, restrooms, etc.)  Loc Location  Centrally located, access to parking and bus routes  Staffin ing  3 FTE – Site manager, Student support staff person, Clerical support  Equip ipment  Full IT set up for 4 classrooms, staff offices  Co Contract Servic ices  IT support, etc.

  14. S UGGESTED M ODEL : C OST A SSUMPTIONS T OTAL O NGOING C OST D RIVERS C OST /U NIT A SSUMPTIONS C OSTS 4 Classrooms (600 ft 2 ) 3 Offices (120 ft 2 ) Space $138,450 $30/ft 2 Storage (240 ft 2) Non-assignable space (35% of total space) 4 fully equipped classrooms $200,000/ Equipment & $160,000 classroom/5 Technology Equipment for Site Staff years of use $150,000 Site Manager Personnel $310,000 (Salary + $60,000 Clerical Staff Person benefits) $100,000 Student Support Professional Contract $40,000 $40,000 IT Support, etc. Services $648,450 TOTAL ONGOING ANNUAL COSTS

  15. S UGGESTED M ODEL : R ESPONSIBILITY Role Key Functions Responsible Entity • Owns property Landlord • Maintains property • Owns equipment Technology • Maintains equipment Provider • Promotes site Site Management • Builds cohorts • Enlists providers • Schedules Facilities • Enrollment Student Services • Bursar • Advising • Financial Aid • Teaches courses Content Provider

  16. Break

  17. A DVISORY C OMMITTEE F EEDBACK For Inclusion in Final Report

  18. N EXT S TEPS

  19. N EXT S TEPS  Draft Final Report (December 1)  Feedback on Fin inal l Report (December 12)  Final Report (December 30)

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend