Management team – Spokes person Maarten de Jong – Deputy spokes person Paschal Coyle – Technical coordinator Marco Circella – Physics coordinator Uli Katz – Site manager France¶ Patrick Lamare – Site manager Italy¶ Marco Anghinolfi – Site manager Greece¶ George Stavropoulos Spokes person Deputy spokes person Technical coordinator Physics/Software coordinator Site manager France Site manager Italy Site manager Greece
¶ Site managers are appointed.
Introduction
- Telephone conferences
– 20 December 2012 and 8, 15, 22, 24 January 2013¶
- Results
– confirmed that set of nominated persons, including appointed site managers, is a team – identified main action points (next slide) – prepared proposal for organisational structure – prepared proposal for names of coordinators – planned regular meetings
- Steering committee once per month (face-to-face)
- Management bi-weekly telephone conference
¶ G. Stavropoulos joined as of 22 January 2013.
Main action points
- Validate baseline technology
- Prepare decision physics objectives
- Build and operate phase-I detector
- Pave the way to construction of phase-II detector
Steering committee Management team Project coordinators¶ QA/QC manager§
¶ List of project coordinators evolves with time. § QA/QC reports directly to institute board and STAC (invited to steering committee).
Project Office Technical Project Coordination Team – Tendering – Planning – Logistics – Accounting
Project coordinators (system qualication phase)¶ Qualification (R&D) Optical system Power system Mechanics Calibration/ Tests DAQ/ Readout
¶ At present, sea operations is under responsibility of site managers
(alternative scheme under consideration). – Qualification (R&D) proposal – Optical system proposal – Power system N.N. – Mechanics proposal – Calibration/Tests proposal – DAQ/Readout proposal – Software/Computing proposal Software/ Computing
Project coordinators (detector construction phase)¶ DOM production detection unit production calibration unit production Earth & Sea science instrumentation infrastructure control & operation
¶ Conform MoU figure 2.
– DOM production N.N. – string production N.N. – calibration unit production N.N. – Earth & Sea science instrumentation N.N. – infrastructure control & operation N.N.
Physics/Software coordination Neutrino astronomy Neutrino mass hierarchy Software/Computing Simulations – Neutrino astronomy proposal – Neutrino mass hierarchy proposal Software/Computing proposal – Simulations proposal
Part II
Proposals for names of coordinators
– Qualification (R&D)
- S. Henry (IN2P3/CPPM)
– Optical system
- S. Mos (FOM/Nikhef)
– Power system N.N. – Mechanics
- E. Berbee (FOM/Nikhef)
– Calibration/Tests
- G. Riccobene (INFN/LNS)
– DAQ/Readout
- T. Chiarusi (INFN/Bologna)
– Software/Computing
- K. Graf (Erlangen/ECAP)
Project coordinators (system engineering phase)¶ Qualification (R&D) Optical system Power system Mechanics Calibration/ Tests DAQ/ Readout Software/ Computing
Physics/Software coordination Neutrino astronomy Neutrino mass hierarchy Software/Computing Simulations – Neutrino astronomy
- R. Coniglione (INFN/LNS)
– Neutrino mass hierarchy
- A. Kouchner (APC)
Software/Computing
- K. Graf (Erlangen/ECAP)
– Simulations
- A. Tsirigotis (HOU)
Requests
- Endorsement of organogram
- Endorsement of project coordinators
- Support for travel, human resources, facilities,
computing, etc.
Considerations
- Setup conference & outreach committee
– appoint chair person
- Setup publication committee
– appoint chair person
- Support GNO
– endorse LoI
- Fix next KM3NeT collaboration meeting
– 7–12 October 2013 (before MANTS), Würzburg (or Erlangen), overlap with Antares
Next steps towards ERIC
- Formal approval of articles
– 2 (parties and institutes) – 5 (RRB) – 6 (STAC), – 7 (governance & management) – 14 & 15 (intellectual property & user access policy)
- f the MoU (should appear in the minutes of