DI LONG Cu Au PROJECT March 2009 PROJECT OVERVI EWS Malitao - High-grade Cu massive sulphide prospect (Sampled and drilled by Philex Mining). Dilong - Previously drilled Cu-Au porphyry (over 6,000 meters of diamond drilling)
PROJECT OVERVI EWS
- Malitao - High-grade Cu
massive sulphide prospect (Sampled and drilled by Philex Mining).
- Dilong - Previously
drilled Cu-Au porphyry (over 6,000 meters of diamond drilling) with approximately 40 million mT of 0.5% Cu and 0.5 g Au/T measured and indicated and 120 mT of 0.41% Cu and 0.35 g/t Au inferred already delineated (NB: Not NI 43-101 Compliant). Open laterally and to depth.
- Taurus - Large tenement
covering numerous historic high-grade Cu massive sulphide mines in Ophiolite terrane
DI LONG PROJECT OVERVI EWS1
- 324 Hectares (EPA) - Abra
Province
- Previously drilled with over
6,000m of drilling in 27 holes
- Previously calculated
resource (Not NI 43-101 Compliant)
- Measured and I ndicated:
40 mT at 0.5% Cu and 0.5 g Au/ T
- I nferred: 120 mT at
0.41% Cu and 0.35g/ t Au
- Open laterally and to depth
- Mineralized parameters
remain undefined
- Immediate resource drilling
proposed
- Surrounded by Freeport
McMoRan
- PMC to acquire 100% for
$400,000 over three years (1.0% NSR)
- 1970 – Copper porphyry
mineralization discovered by E.
- G. Libatique who organized
Mayabo Mining Assoc. and filed 177 lode claims
- 1971 – Agreement signed with
- W. E. Hale and Associates
Mining Corporation
- 1971 to 1974 – Benguet
Exploration conducted mapping, geochemical sampling, I .P. geophysics and diamond drilling to establish the current “resource”
- Copper mineralization was
found to occur over a 2,000 m by 500 m area
- 1990s – Claims staked by
Damasen and optioned to Newmont – Newmont pulls out
- f Philippines
- 2007 – Project acquired from
the heirs of Damasen – Surrounding Newmont ground acquired by Freeport McMoRan
Dilong Project History
Dilong Copper-Gold Porphyry
Dilong Project Strategy
- To bring the previously drilled
resource into a NI 43-101 compliant resource
- To drill define the boundaries of the
deposit laterally and to depth
- Initial Budget after EPA approval
- Initial Confirmation Drill Program -
$300,000
- To seek development partnerships
and off-take agreements with Asian corporations