Decision on excess behind the meter production proposal Greg Cook - - PowerPoint PPT Presentation

decision on excess behind the meter production proposal
SMART_READER_LITE
LIVE PREVIEW

Decision on excess behind the meter production proposal Greg Cook - - PowerPoint PPT Presentation

Decision on excess behind the meter production proposal Greg Cook Executive Director, Market and Infrastructure Policy Board of Governors Meeting General Session May 15, 2019 Proliferation of rooftop solar has highlighted an inconsistency in


slide-1
SLIDE 1

Decision on excess behind the meter production proposal

Greg Cook Executive Director, Market and Infrastructure Policy Board of Governors Meeting General Session May 15, 2019

slide-2
SLIDE 2

Proliferation of rooftop solar has highlighted an inconsistency in reporting load to the ISO.

Page 2

  • Behind the meter solar production is rapidly growing in

California

  • Excess behind the meter production occurs when behind

the meter generation exceeds the host load

  • Some load serving entities are providing gross load data

while other provide load net of excess behind the meter production Load serving entities must have clear rules for reporting load

slide-3
SLIDE 3

Excess behind the meter production occurs when rooftop solar production exceeds a local load.

Page 3

HH 1 (1 kWh)

Without Rooftop Solar With Rooftop Solar

GEN (6 kWh)

HH 2 (5 kWh) HH 1

(-1 kWh) GEN (4 kWh)

HH 2 (5 kWh)

slide-4
SLIDE 4

Management’s proposal addresses three primary issues:

Page 4

  • Ensure consistent reporting of “Gross Load” by clarifying

its definition in the ISO tariff

– Gross load is not net of excess behind the meter production

  • Creates a new tariff definition for excess behind the

meter production

– The amount of generation that exceeds host consumption

  • Specifies how excess behind the meter production must

be reported to the ISO and how it is settled

– Paid the locational marginal price

slide-5
SLIDE 5

Proposal also addresses how gross load and excess behind the meter production will be used to allocate costs.

  • Gross load will be used to allocate reliability-based

charge codes

  • The net load will be used to allocate energy-based

charge codes

  • Excess behind the meter production will receive credit

for offsetting distribution losses

Page 5

slide-6
SLIDE 6

Stakeholders are generally supportive of the proposal.

Page 6

  • DMM, PAO, and SCE concerned about exempting some

publicly owned utilities and metered subsystems

– Exemptions are only for entities with grandfathered agreements for reporting load to the ISO and many do not have necessary metering – Exempted entities make up 13% of load, the impact on charges allocated by gross load under the proposed rules will likely be small

  • PG&E would like more accurate accounting for losses

– Proposed methodology closely accounts for losses offset by excess BTM production – Loss factors may need to be reviewed more holistically in the future as the system continues to evolve

  • WPTF requests publication of excess BTM production

values

– Management will post excess behind the meter production values

slide-7
SLIDE 7

Management recommends the Board approve the excess behind the meter production proposal.

  • Clarifies rules for load serving entities to report load to

the ISO

  • Provides increased transparency of grid supply and

demand

  • Provides more accurate accounting for gross load and

excess behind the meter production

  • Results in equitable allocation of related charges

Page 7