1
De ve lo ping T wo Qua lity Ha rd Ro c k L ithium De po sits in - - PowerPoint PPT Presentation
De ve lo ping T wo Qua lity Ha rd Ro c k L ithium De po sits in - - PowerPoint PPT Presentation
M A RC H 2 0 1 9 A SX : LTR De ve lo ping T wo Qua lity Ha rd Ro c k L ithium De po sits in We ste rn Austra lia L ithium a nd Ba tte ry Me ta ls Co nfe re nc e Pe rth, We ste rn Austra lia 1 I mpo rta nt I nfo rma tio n F or war
2
I mpo rta nt I nfo rma tio n
F
- r
war d L
- oking State me nts
T his Pre se nta tio n ma y inc lude sta te me nts tha t c o uld b e de e me d “fo r ward-lo o king sta te me nts”. Altho ug h the Co mpa ny be lie ve s the e xpe c ta tio ns e xpre sse d in suc h fo r ward-lo o king sta te me nts a re b a se d o n re a so na ble a ssumptio ns, suc h sta te me nts a re no t g ua rante e s o f future pe rfo rmanc e and a c tual re sults o r de ve lo pme nts ma y diffe r ma te rially fro m tho se e xpe c te d in the fo rwa rd-lo o king sta te me nts o r no t ta ke pla c e a t a ll.
No offe r to se ll or invitation to buy
T his Pre se nta tio n is no t, a nd sho uld no t b e c o nside re d to , c o nstitute a ny o ffe r to se ll, o r so lic ita tio n o f an o ffe r to b uy, a ny se c uritie s in L io nto wn Re so urc e s L imite d, a nd no pa rt o f this Pre se nta tio n fo rms the b a sis o f a ny c o ntra c t o r c o mmitme nt wha tso e ve r with a ny pe rso n. L io nto wn Re so urc e s L imite d do e s no t a c c e pt a ny lia bility to a ny pe rso n in re la tio n to the distrib utio n o r po sse ssio n o f this Pre se nta tio n fro m o r in a ny jurisdic tio n.
Disc laime r
Whilst c a re ha s b e e n e xe rc ise d in pre pa ring a nd pre se nting this Pre se nta tio n, to the ma ximum e xte nt pe rmitte d b y la w, L io nto wn Re so urc e s L imite d a nd its re pre se nta tive s:
- ma ke no re pre se nta tio n, wa rra nty o r unde rta king , e xpre ss o r implie d, a s to the a de q ua c y, a c c ura c y, c o mple te ne ss o r re a so na b le ne ss o f this Pre se nta tio n;
- a c c e pt no re spo nsibility o r lia bility a s to the a de q ua c y, a c c ura c y, c o mple te ne ss o r re a so na b le ne ss o f this Pre se nta tio n; a nd
- a c c e pt no re spo nsibility fo r a ny e rro rs o r o missio ns fro m this Pre se nta tio n.
Compe te nt Pe r son State me nt
T he Info rma tio n in this re po rt tha t re la te s to the Sc o ping Study fo r the K a thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “K a thle e n Va lle y Sc o ping Study c o nfirms po te ntia l fo r ro b ust ne w WA lithium mine de ve lo pme nt” re le a se d o n the 29th Ja nua ry 2019 whic h is a va ila ble o n www.ltre so urc e s.c o m.a u. T he Info rma tio n in this re po rt tha t re la te s to Mine ra l Re so urc e s fo r the K a thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “Ma ide n 21 millio n to nne L ithium-T a nta lum Mine ra l Re so urc e se ts stro ng g ro wth fo unda tio n fo r L io nto wn a t K a thle e n Va lle y” re le a se d o n the 4th Se pte mb e r 2018 whic h is a va ila ble o n www.ltre so urc e s.c o m.a u. T he Info rma tio n in this re po rt tha t re la te s to Me ta llurg y fo r the K a thle e n Va lle y Pro je c t is e xtra c te d fro m the ASX a nno unc e me nt “Hig hly e nc o ura g ing re sults fro m initia l me ta llurg ic al te st wo rk a t the K a thle e n Va lle y L ithium-T a nta lum Pro je c t, WA” re le a se d o n the 12th No ve mb e r 2018 whic h is a va ila ble o n www.ltre so urc e s.c o m.a u. T he Info rma tio n in this re po rt tha t re la te s to E xplo ra tio n T a rg e ts is e xtra c te d fro m the ASX a nno unc e me nt “Ma jo r re so urc e e xpa nsio n drilling pro g ra m c o mme nc e s a t K a thle e n Va lle y L ithium Pro je c t, WA” re le a se d o n the 29th Ja nua ry 2019 whic h is a va ila ble o n www.ltre so urc e s.c o m.a u. T he I nfo rma tio n in this pre se nta tio n tha t re la te s to the E xplo ra tio n Re sults fo r the Bulda nia Pro je c t is e xtra c te d fro m the ASX a nno unc e me nts e ntitle d “Mo re stro ng a ssays c o nfirm sig nific a nt lithium disc o ve ry a t Bulda nia Pro je c t in WA”, “L io nto wn c o nfirms se c o nd sig nific ant lithium disc o ve ry in WA with ne w thic k, hig h-g ra de hits a t Bulda nia ”, “Outsta nding ne w drilling re sults c o ntinue to e xpa nd lithium mine ralisa tio n a t Buldania ”, “L io nto wn furthe r e xpa nds pro spe c tive lithium fo o tprint a t Buldania in WA’ s So uth-E a ste rn Go ldfie lds”, “L a te st a ssa ys c o nfirm lithium mine ralisa tio n o ve r >1.3km strike le ng th a t the Bulda nia L ithium Pro je c t in WA” a nd L io nto wn e xpa nds lithium fo o tprint a t Buldania in WA’ s So uth-E a ste rn Go ldfie lds” re le a se d o n the 26th Ma rc h 2018, 19th Se pte mb e r 2018, 1st No ve mbe r 2018,13th No ve mb e r 2018, 20th No ve mb e r 2018 and 14th Ma rc h 2019 re spe c tive ly whic h are a vaila ble
- n www.ltre so urc e s.c o m.a u.
T he Co mpa ny c o nfirms tha t it is no t a wa re o f a ny ne w info rma tio n o r da ta tha t ma te ria lly a ffe c ts the info rma tio n inc lude d in the o rig inal ma rke t a nno unc e me nts a nd tha t a ll ma te ria l a ssumptio ns a nd te c hnic a l pa ra me te rs unde rpinning the e stima te s in the re le va nt ma rke t a nno unc e me nts c o ntinue to a pply a nd ha ve no t ma te ria lly c ha ng e d. T he c o mpa ny c o nfirms tha t the fo rm a nd c o nte xt in whic h the Co mpe te nt Pe rso n’ s finding s a re pre se nte d ha ve no t b e e n ma te ria lly mo difie d fro m the o rig inal ma rke t a nno unc e me nts.
3
Ka thle e n Va lle y L ithium Proje c t
Ma ide n Mine ra l Re so urc e :
21.2Mt @ 1.4% L i2O and 170ppm T a 2O 5
- 75% Me asure d and Indic ate d
- L
- c ate d on grante d mining le ase s
- Close to e stablishe d infrastruc ture
- Sc o ping study c o nfirms
po te ntia l fo r a c o mme rc ia lly ro b ust mining o pe ra tio n
- Re so urc e e xpa nsio n drilling in
pro g re ss a ime d a t sig nific a ntly e xte nding mine life
- Co mpre he nsive te st wo rk
- ng o ing to o ptimise g ra de
a nd re c o ve rie s
- F
e a sib ility studie s sc he dule d fo r c o mple tio n b y Q1 2020
1
Bulda nia L ithium Proje c t
2
L io nto wn’ s se c o nd lithium disc o ve ry:
up to 58m @ 1.2% L i2O in drilling
- Mine ra lisa tio n c o nfirme d o ve r a
le ng th o f >1.3km a nd re ma ins
- pe n
- F
urthe r re so urc e de finitio n drilling to c o mme nc e Q1 2019
- Ma ide n re so urc e e stima te Q2/ Q3
2019
Ne xt Ge ne ra tio n L ithium Pro duc e r
Pr
- je c ts str
ate gic ally loc ate d in the lithium- r ic h E aste r n Goldfie lds r e gion of We ste r n Austr alia
Both proje c ts are e ithe r wholly-owne d or L iontown has 100% of the re le vant mine ral rights
4
W ESTERN A USTRA LIA
K AT HL E E N VAL L E Y L I T HI UM PROJE CT
5
Sc o ping Study Suppo rts Po te ntia l T
- De ve lo p A Sta nda lo ne
L ithium Mining a nd Pro c e ssing Ope ra tio n
Sc o ping study pre pa re d b y L yc o po dium Mine ra ls Pty L td
Ba se Ca se 2Mtpa (L i & T a ) NPV(8%, re a l, po st ta x) A$421M
(Ra ng e o f A$316 to A$526M)
I RR 38% Pa yb a c k <3 ye a rs Mine L ife 9 ye a rs Ave ra g e L OM Ope x ~A$428/ t c o nc . (ne t o f T a c re dits) Annua l Pro duc tio n ~360kt c o nc e ntra te L OM Spo dume ne Pric e A$900 (US$650/ t) F OB Ca pe x ~A$232M
Open Pits
6
F ina nc ia l Se nsitivity – Ro b ust Pro je c t
444 449 481 510 518 571 588 398 393 358 331 323 301 253
200 250 300 350 400 450 500 550 600 Ta Recoveries (40-60%) Capital Cost Flex (+/-15%) Li Recoveries (74-84%) Operating Cost Flex (+/-15%) Li Grade Flex (+/-10%) Exchange Rate (AUDUSD$0.80-0.64) Spodumene Base Case Price (US$550-750/t)
NPV (A$M)
Kathleen Valley Project - NPV Sensitivity Analysis (A$M)
A$421M Base Case
7
<3 Ye a r
Pa yba c k Pe r iod
Sc o ping study sug g e sts L ife o f Mine fre e c a sh flo w o f ~A$762M
(400) (200)
- 200
400 600 800 1,000
Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
A$ Revenues and Net Cashflows (After Tax)
Revenue A$m Net cashflow after tax A$m Cumulative net cashflow after tax A$m
A$M
Ca sh F lo w Pro file
8
Ca sh F lo w Pe r Ye a r
A$M
- 300
- 250
- 200
- 150
- 100
- 50
50 100 150 200 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
Net Cashflow After Tax A$M per Year
Sc o ping study sug g e sts a ve ra g e fre e c a sh flo w o f >A$100M pe r ye a r
Y1
9
Re so urc e s a nd Mining
Global r e sour c e 21.2Mt @ 1.4% L i2O and 170ppm T a 2O 5 75% Me asur e d and Indic ate d Sc oping study Pr
- duc tion
T ar ge t of 15.7Mt @ 1.26% L i2O and 154ppm T a 2O 5 Conve ntional ope n pit mining and pr
- c e ssing
F avour able loc ation c lose to e stablishe d infr astr uc tur e Ac c e ss to wor ld- c lass e xpe r tise and wor k for c e Ope n pits lar ge ly c onstr aine d by limit of data
10
Me ta llurg y And F lo wshe e t – Pre limina ry T e st Wo rk Co nfirms a Sa le a b le L i2O Co nc e ntra te Ca n Be Pro duc e d
K e y o utc o me s
- 5.9% L
i2O fro m DMS c o nc .
- 36% ma ss re je c tio n fro m 2-sta g e DMS
- 5.5% L
i2O fro m flo ta tio n
- L
- w iro n (<0.5% F
e 2O 3)
- Pre dic te d 79% L
i2O re c o ve ry
- Pre limina ry T
a 2O 5 c o nc . Pre limina ry re sults uno ptimise d a nd ve ry e nc o ura g ing Additio na l te st wo rk in pro g re ss o n a furthe r 4 to nne s o f sa mple Hig h prio rity pla c e d o n g e tting me ta llurg y rig ht
11
Ne xt Ste ps – Unlo c king F urthe r Va lue
:
- ~16,000m RC drilling pro g ra m in
pro g re ss
- T
e sting imme dia te e xte nsio ns o f b lo c k mo de l
- T
a rg e ting a dditio na l 8.5 – 16Mt @ 1.2 – 1.5% L i2O*
- Po te ntia l to sig nific a ntly inc re a se mine
life
- Optimise unit pro c e sse s to pro duc e
6% L i2O c o nc e ntra te
- Co nfirm ta nta lum re c o ve ry
- Pro vide sa mple s fo r po te ntia l o ffta ke
pa rtne rs
*T
he po te ntia l g ra de a nd to nna g e o f the e xplo ra tio n ta rg e t re fe rre d to a b o ve is c o nc e ptua l in na ture a nd the re ha s b e e n insuffic ie nt e xplo ra tio n to e stima te a Mine ral Re so urc e . It is unc e rta in if furthe r e xplo ra tio n will re sult in the e stima tio n o f a Mine ral Re so urc e . Se e Appe ndix fo r full e xpla na tio n o f a ssumptio ns use d to e stima te ra ng e s.
Re sour c e Gr
- wth
Me ta llur g y
KATHLEEN’S CORNER (NW) KATHLEEN’S CORNER (SE) MT MANN
12
De ve lo pme nt Pro duc tio n
2018
2019
Hig h Gra de Compa re d With Most Pe e rs - Plus Pote ntia l to Grow
* Re so urc e s a s a t 24 Ja nua ry 2019 (So urc e d fro m c o mpa ny we b site s)
13
I nve stme nt Ca se
Ac tive , we ll se rvic e d mining re g ion Re sourc e upside – 16,000m RC drilling prog ra m in prog re ss Conve ntiona l mining a nd proc e ssing F urthe r fe a sibility studie s ong oing Robust, hig h g ra de re sourc e Strong foc us on optimising re c ove rie s – furthe r te st work in prog re ss Ve ry e xpe rie nc e d, we ll- c re de ntia le d ma na g e me nt te a m F irst world loc a tion a nd e xpe rtise
Hig hly po sitive fina nc ia l o utc o me s fro m Sc o ping Study - o nly no n-c o mmitte d spo dume ne re so urc e in Austra lia .
14
W ESTERN A USTRA LIA
BUL DANI A L I T HI UM PROJE CT
15
Outc ro pping , fre sh, spo dume ne -re la te d mine ra lisa tio n Mine ra lisa tio n a t Anna e xte nde d to the SE unde r sha llo w c o ve r – strike le ng th >1.3km a nd o pe n Simila r g e o lo g y to the Mt Ma rio n a nd Ba ld Hill lithium de po sits (71Mt a nd 26Mt re spe c tive ly) Go o d infra struc ture – lo c a te d o n E yre Hig hwa y ~30km e a st o f K a lg o o rlie - E spe ra nc e ra ilwa y L io nto wn ha s 100% o f the lithium a nd re la te d me ta l rig hts* Pa rt o f la rg e r, 600km2 stra te g ic la nd ho lding
*Se c ure d via a n a g re e me nt with We stg o ld Re so urc e s whic h ho lds ro ya lty rig hts
Bulda nia I s Stra te g ic a lly L
- c a te d in a L
ithium-ric h Mine ra l Pro vinc e
Sig nific a nt lithium disc ove ry
T
- tal land position ~600km 2
16
Mine ra lisa tion fre sh from surfa c e a nd ope n a long strike a nd a t de pth F urthe r de finition drilling pla nne d a s pre c ursor to ma ide n Mine ra l Re sourc e e stima te
L a rg e L ithium (Spo dume ne ) Mine ra lise d Pe g ma tite De fine d a t the Anna Pro spe c t
Drill section
13m @ 1.0% Li2O 25m @ 1.2% Li2O
- incl. 5m @
2.0% Li2O 58m @ 1.2% Li2O
- incl. 16m @
1.7% Li2O 39m @ 1.6% Li2O
- incl. 13m @
2.1% Li2O 29m @ 1.3% Li2O
- incl. 9m @
1.7% Li2O 32m @ 1.1% Li2O
- incl. 9m @
1.3% Li2O 22m @ 1.1% Li2O
- incl. 10m @
1.4% Li2O 11m @ 1.4% Li2O
- incl. 3m @
2.0% Li2O 14m @ 1.7% Li2O
- incl. 11m @
2.0% Li2O 10m @ 1.6% Li2O
- incl. 4m @
2.1% Li2O 30m @ 1.4% Li2O
- incl. 9m @
1.6% Li2O
17
Drilling E xte nds Mine ra lisa tio n At Anna T
- So uth E
a st – Syste m Re ma ins Ope n
Anna L
- ng Se c tion (L
- oking NE
) NW 39m @ 1.6% Li2O
- incl. 13m @
2.1% Li2O 29m @ 1.2% Li2O
- incl. 9m @
1.7% Li2O 10m @ 1.6% Li2O
- incl. 4m @
2.1% Li2O 32m @ 1.1% Li2O
- incl. 9m @
1.3% Li2O 58m @ 1.2% Li2O
- incl. 16m @
1.7% Li2O 25m @ 1.2% Li2O
- incl. 5m @
2.0% Li2O 13m @ 1.0% Li2O 30m @ 1.4% Li2O
- incl. 9m @
1.6% Li2O 14m @ 1.7% Li2O
- incl. 11m @
2.0% Li2O 11m @ 1.4% Li2O
- incl. 3m @
2.0% Li2O
200m
SE
18
Multiple undrille d spodume ne pe g ma tite s
Bulda nia is Pa rt o f a L a rg e (~600km2) L a nd Po sitio n Hig hly Pro spe c tive F
- r L
ithium
- 377km2 a re a lo c a te d 4km to the so uth
a nd a lo ng strike o f the Bulda nia Pro je c t
- Up to 1.8% L
i2O re c o rde d fro m re c o nna issa nc e ro c k c hip sa mpling
NORCOT TPROJE CT
- 163km2 a re a lo c a te d imme dia te ly
no rth we st o f the Bulda nia Pro je c t – c o ve rs strike e xte nsio n o f Anna tre nd
- ~20km strike le ng th o f pro spe c tive
stra tig ra phy
- Multiple spodume ne - be a ring
pe g ma tite s up to 800m long a nd 20m wide ma ppe d
- Assa y va lue s up to 3.0% L
i2O
KIL L AL OE PROJE CT
19
- +35 ye a rs
e xpe rie nc e
- Disc o ve re d multi-
millio n o unc e Ve ra Na nc y Go ld De po sits ASX CODE L T R SHARE S ON ISSUE ~1,528M MARK E T CAPIT AL I SAT I ON $33.6M (AT ~2.2CPS) MAJOR SHARE HOL DE R T IM GOYDE R ~18% T OP 20 SHARE HOL DE RS ~50% CASH ~A$7.5M
A Pro ve n, E xpe rie nc e d Bo a rd
T IM GOYDE R Cha irma n DAVID RICHARDS Ma na g ing Dire c tor CRAIG WIL L IAMS Non- E xe c utive Dire c tor ANT HONY CIPRIANO Non- E xe c utive Dire c tor ST E VE CHADWICK Non- E xe c utive Dire c tor
Co rpo ra te Sna psho t
(Pe nding c o mple tio n o f Ca pita l Ra ising a nno unc e d 14-F e b -2019)
- +40 ye a rs
e xpe rie nc e
- F
- unde r a nd CE
O
- f E
q uino x Mine ra ls
- +30 ye a rs
e xpe rie nc e
- F
- rme r Se nio r
Pa rtne r a t De lo itte s
- +40 ye a rs
e xpe rie nc e
- E
xe c utive Cha irma n Cha lic e Go ld Mine s
- +40 ye a rs
e xpe rie nc e
- Dire c to r o f
L yc o po dium Mine ra ls
20
Ca ta lysts fo r Re -Ra ting
Str
- ng ne ws flow
Ma ide n Mine r a l Re sour c e : Q2/ Q3 2019 Re sour c e Upg r a de : Q1/ Q2 2019 Re g iona l e xplor a tion a nd disc ove r y dr illing Ka thle e n Va lle y L ithium Pr
- je c t
Bulda nia L ithium Pr
- je c t
04
05 06
Pr
- g r
e ssing towa r ds Sc oping Study Me ta llur g ic a l studie s foc use d on optimising g r a de a nd r e c ove r ie s
21
APPE NDI X
K a thle e n Va lle y Pro je c t Additio na l I nfo rma tio n
22
Sc o ping Study – K e y Pa ra me te rs And Assumptio ns
Pa r a me te r Ge ne r a l a nd E c onomic
Disc o unt ra te (re a l, po st ta x) 8% Spo dume ne c o nc e ntra te pric e US$650 pe r to nne F OB T a nta lum c o nc e ntra te pric e (c o nta ine d T a 2O 5) US$71 pe r po und F OB
E xc ha ng e r a te – AUD/ USD
0.72
Mining a nd Pr
- duc tion
Ave ra g e L ife -o f-Mine strip ra tio 8.24:1 Pro c e ssing ra te 2Mtpa L ife -o f-Mine Pro duc tio n T a rg e t 15.7Mt o re Ave ra g e L i2O g ra de (dilute d) 1.26% Ave ra g e T a 2O 5 g ra de (dilute d) 154ppm L i2O re c o ve rie s 79% T a 2O 5 re c o ve rie s 50% Spo dume ne c o nc e ntra te g ra de 5.6% T a nta lite c o nc e ntra te g ra de 30% Mo isture c o nte nt o f c o nc e ntra te 13%
Pa r a me te r Cost Assumptions
L OM a ve ra g e o pe n pit mining c o sts ($/ t o re mine d) A$37.72 L OM a ve ra g e pro c e ssing c o st ($/ t o re mille d) A$19.32 L
- g istic s a nd tra nspo rt
($/ t c o nc e ntra te ) A$75.65 Ge ne ra l a nd a dmin ($/ t o re mille d) A$6.01 We ste rn Austra lia Sta te ro ya lty 5% Othe r ro ya ltie s 3% g ro ss sa le s a nd $0.5/ t o re mine d Co rpo ra te ta x ra te 30% E stima te d o pe ning ta x lo sse s a va ila b le A$25M
23
A$M $M
Re ve nue s
2,802
Ope rating c osts
(1,236)
Capital e xpe nditure
- pre -produc tion
- sustaining
(232) (25)
Royaltie s
(232)
Corporate tax
(315)
L ife of Mine Proje c t F re e Cash flow
762
Main Are a Capital (A$M) T re atme nt Plant
82.8
Re age nts & Plant Se rvic e s
9.5
Infrastruc ture – ge ne ral
39.9
Mining
6.1
Contrac tor and Construc tion Indire c ts
18.6
Subtotal
156.9
Manage me nt Costs
20.6
Owne rs Costs
14.4
Subtotal
35.0
Continge nc y
40.3
Proje c t T
- tal
232.2
L ife o f Mine F ina nc ia ls Ca pita l Co sts Summa ry
Sc o ping Study – L
- M F
ina nc ia ls And Ca pita l E xpe nditure
24
Sc o ping Study – Pro duc tio n And Co sts
169 348 351 357 356 372 355 356 149 616 468 552 434 433 377 438 310 191 701 570 660 537 520 468 525 391 293
- 100
200 300 400 500 600 700 800
- 50
100 150 200 250 300 350 400
Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10
Opex (A$t/conc)
- Conc. Production (kt)
Production and Costs
Spodumene Concentrate Production FOB Opex net of Tantalum credits (A$/t) FOB Opex no Tantalum (A$/t)
25
Sc o ping Study – Gra de Pro file s
- 1.20%
1.23% 1.24% 1.26% 1.26% 1.32% 1.26% 1.26% 1.42%
- 133
163 174 169 142 156 142 133 189
- 20
40 60 80 100 120 140 160 180 200
- 0.20%
0.40% 0.60% 0.80% 1.00% 1.20% 1.40% 1.60% Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Tantalum Grade (ppm Ta2O5) Lithium Grade (%Li2O)
LOM Lithium and Tantalum Grade Profile
26
Sc o ping Study – Pro duc tio n Cla ssific a tio n
0% 5% 10% 15% 20% 25% 30% 35% 40% 45% 50% 0.5 1 1.5 2 2.5 Y1 Y2 Y3 Y4 Y5 Y6 Y7 Y8 Y9 Y10 Tonnes (Mt)
Production Classification by Year
Unclassified Inferred Indicated Measured Percentage Inferred
27
E xplo ra tio n T a rg e t Pa ra me te rs a nd Assumptio ns
T he g ra de a nd to nna g e ra ng e s re fe rre d to a b o ve a re c o nc e ptua l in na ture a nd the re ha s b e e n insuffic ie nt e xplo ra tio n to e stima te a Mine ra l Re so urc e . It is unc e rta in if furthe r e xplo ra tio n will re sult in the e stima tio n o f a Mine ral Re so urc e .
Par ame te r Mt Mann Kathle e n’s Cor ne r (NW) Kathle e n’s Cor ne r (SE ) Rationale
Combine d strike le ng th of pe g ma tite s
700 – 800m 300 200
Ba se d o n pre vio us drilling a nd e xtra po la tio n o f b lo c k mo de l use d in pre pa ra tio n o f ma ide n Mine ra l Re so urc e E stima te (re le a se d 4th Se pte mb e r 2018) Ave ra g e c umula tive true width
12 – 20m 12 -18m 10 - 15m
Down Dip e xte nt
100 – 125m 250 – 350m 500 - 600m
Spe c ific g ra vity
2.75 2.75 2.75
Me a sure d fro m dia mo nd c o re drilling T
- ta l tonna g e
2.3 – 5.5Mt 2.5 – 5.2Mt 4.1 – 5.0Mt
Strike x width x dip x S.G Ave ra g e g ra de
1.2 – 1.5% 1.2 – 1.5% 1.2 – 1.5%
Ba se d o n ma ide n Mine ra l Re so urc e E stima te
28 OF F ICE
L e ve l 2, 1292 Ha y St We st Pe rth WA 6005
PHONE NUMBE R
08 9322 7431
E MAIL
info @ ltre so urc e s.c o m.a u
WE BSIT E:
www.ltre so urc e s.c o m.a u
https:/ / twitte r.c o m/ L io nto wnRe s https:/ / a u.linke din.c o m/ c o mpa ny/ lio nto wn-re so urc e s-limite d