Current Status of the I nterlock System of KSTAR

Jaesic Hong, I n-Sik Wooa, Woongryol Leea, Taegu Leea, Sang-I l Leea, Kaprai Parka, KSTAR Operation team, I ntegrated Control Team

Nat at ional al Fusion Resear arch I nst it ut e ( NFRI ), 113 113 Gw aha hang ngno no, Yus usung ung-Gu Gu, Daej ej eo eon, 305 305-333, 333, KOREA e-m ail: il:hj aesic ic@nfri. i.re.kr

slide-2
SLIDE 2

KSTAR Conference 2014 2014.2.19 KSTAR Conference 2014

Abstract

After 5th campaign of the KSTAR, the interlock functions of the Motor Generator System, the Seismic Detection System, the Machine Sound Listening System and the Lithium Beam Injection System was integrated and coded in the Interlock System of the KSTAR [1]. The fast interlock functions to protect for the PMS (Plasma Facing Component (PFC) Monitoring System) and heating devices was built in CCS (Central Control System) and PCS (Plasma Control System) before the plasma experiments. On the 6th campaign, interlock system carried out the mission of the interlocking without significant abnormalities generally. The events were recorded and analyzed to the impact and the result at the standpoint of the interlock on the 6th campaign. This post presents the

  • peration results and the definitions of the interlock and the fast interlock functions. The

figure shows the configuration of the current status of Interlock System. References: Jaesic Hong et al, “The Operation Result of Supervisory Interlock System for the KSTAR 1st Campaign”, Fusion Engineering and Design 85 (2010) 500–504

slide-3
SLIDE 3

KSTAR Conference 2014

  • I ntroduction
  • Mission, Constitutions
  • Software and Operation I nterface
  • Events and Actions
  • Schematics od KSTAR I nterlock
  • New events in 2013
  • Operation and Checking Procedure
  • I nterlock for Heating Devices
  • Conditions and interlock flow of PMS events
  • Plan for the 7th Campaign
  • I nterlock events in 2013
  • Result of the fast interlock modules
  • Result in 2013

I ndex

2014.2.19

slide-4
SLIDE 4

KSTAR Conference 2014

 Mission : Protect the devices and prevent an accident and the logging  Constitutions : 4 Systems

  • Machine I nterlock System
  • 1 main and 12 sub- interlock cubicles , 1 computer
  • 233 events from 35(16 local I&C group) controllers
  • 238 interlock event and status send to 19 controllers
  • Fast I nterlock I nterface System
  • 4 Interlock conditions: Plasma Current, Time Window, PFC eventss, PCS events
  • 5 action signal to heating devices (21 outputs)
  • SMS I nterface
  • Sending shot messages of the machine interlock events
  • 93 Messages, 25 Groups
  • No limit for Users and Messages
  • Operations & Events Logging
  • Mediawiki, SMS IOC, SIS, IOC, SIS OPI ( Linux )
  • SIS Information and Operation Logs, SCS Operation Logs, Brief Shot informations
  • Event and accident logging form with log

I ntroduction

2014.2.19

slide-5
SLIDE 5

KSTAR Conference 2014 Local I &C Local I &C

SI S PLC Logic Program

Interlock Logic SMS Logics

검출기 Logic I nterlock Events (KI L 1, 2, 3, 4) Local I nterlock Event I OCs …. EPI CS Fault Server OS: Linux with EPI CS

SMS & SI S IOC EPICS + freeTDS

SMS Bypassing Control apache2 media Wiki mySQL PHP SI S HMI & Logic Server

OS: Windows XP Monitoring & Control (HMI) Logic coding/changing eSMS DB access

SMS User/event table on Windows HMI on the W_XP OPI on the Linux 2014.2.19

Software and Operation I nterface

slide-6
SLIDE 6

KSTAR Conference 2014

Systems Events & Status Actions & Status Systems Event & Status Actions & Status

VMS CR 8 8 GEP/(MG) 14 +2 VMS VV(Baking) 8 + 2 ECH 5 6 HDS Helium 3 8 LHCD 4 3 HDS Vacuum 3 8 NBI1 8 8 Fuel & GDC 5 2 NBI PS 4 4 QDS 10+2 ECCD 6 4 TMS 9 8 ICRH 5 8 CLS Helium 7 8 PSI 13 + 6 15 CLS Vacuum 8 8 CCS 10 (PV:14) 11(PV +288) TF PS 4 2 PCS From CCS PV

  • PF PS (CS, PF)

36 52 PMS 3(PV) HRS 3 + 2 8 Tritium P . 4 CWF 6 + 2 8 O2/H2… >31 >57

Events and Actions of I nterlock System

2014.2.19

slide-7
SLIDE 7

KSTAR Conference 2014

Schematics of KSTAR I nterlock

Monitoring Actuator/ Monitoring

Sub-Interlock Cubicles

Reflected Memory

Optical Link

Optical Fiber Copper Wire

2014.2.19

slide-8
SLIDE 8

KSTAR Conference 2014

New events in 2013

Seismic Alarm Magnitute 1 50Gal

4

2 80Gal

5

3 150Gal

5

4 250Gal

6

New events

  • SEI SMI C events: 4 events
  • Events & Reset Functions
  • Motor Generator: 4 Events
  • Lithium Beam (Fast & interlock)
  • Sound Listening System
  • Fixed HMI (Lost by HDD Failure)
  • Seismic alarm list

KSTAR Sound

2014.2.19

slide-9
SLIDE 9

KSTAR Conference 2014

Operation and Checking Procedure

2014.2.19

slide-10
SLIDE 10

KSTAR Conference 2014

I nterlock for Heating Devices

Fast I nterlock I nterface

Heating SI S

Fast I nterlock

CCS PCS

 Ip error  Ip minimum fault  PF Error  PF overcurrent fault  PS Fault  IVC overcurrent  External fault

Machine (Slow) I nterlock

PF PS

Safety Interlocks: Action as Interlock Level 3

 Open main gate of Exp. Hall  Alarm of entering to the Exp. hall  Fault of access control program  Alarm of the assistant movable dosimeters positions

L1, 2, L3, L4, W L1, L2, L3 L1, 2, L3, L4, W L3, L4, W

PMS

 More than 200°C: PFC or NB Armor  More than 300°C: PFC  More than 300°C: NB Armor  More than 80°C IVCC Coil or more than 60°C of IVCC cable

I p Error … PFC Fault, PCS Ext. Fault Control

Fast I nterlock

PSI TSS

Timing( Clock and Triggers) 2014.2.19

slide-11
SLIDE 11

KSTAR Conference 2014

Conditions and interlock flow of PMS events

2014.2.19

slide-12
SLIDE 12

KSTAR Conference 2014

Plan for the 7th Campaign New events

  • Fire Alarms
  • NBI I PS3 event

Upgrade Sound Listening Prepare Test Station

Upgrade Sound Listening System

2014.2.19

slide-13
SLIDE 13

KSTAR Conference 2014

I nterlock Event in 2013

Description 7월 8월 Total CCS_Level3 1 1 CCS_Level4 1 1 CLS_He_Level_4 1 2 3 CLS_He_Warning 8 6 14 CWF_Level4 CWF_Warning ECH_Level_4 1 1 ECH_Warning HDS_He_Level_4 HDS_He_Warning 3 3 6 HRS_Level2 1 1 HRS_Level3 1 1 HRS_Level4 5 2 7 HRS_Warning 1 1 I CH_Level_4 MPS_Level3 12 3 15 MPS_Level4 12 7 19 MPS_Warning 7 6 13 PSI _Level4 27 190 217 Description 7월 8월 Total QDS_Level_4 1 2 3 QDS_Warning 1 2 3 TMS_Level3 2 2 TMS_Level4 2 11 13 TMS_Warning 1 1 Level_1 1 1 Level_2 Warning 2 Total 84 239 13 Level 1 1 1 Level 2 1 1 Level 3 16 3 19 Level_4 48 216 264 Warning 20 18 38 Level 1 & Level 2 Event: 1 time

By FDS accident

Level 19 Events: 13 times

15 times By the PF PS Fault ( by Many Causes )

Level 4 Events 514 times

217 times by the PSI Interlock Level 4 ( by the accessing experimental hall during the shot interval )

2014.2.19

slide-14
SLIDE 14

KSTAR Conference 2014

Fast I nterlock Operation Result

2014.2.19

slide-15
SLIDE 15

KSTAR Conference 2014

Conclusions

In 2013, the control and the alarm monitoring of the seismic sensing system, events monitoring of the Motor Generator and the infra of the fast and machine interlock for Lithium Beam have been implemented in the interlock system. In the case of earthquake detection system, the monitoring and the control function to remote control, have checked the signal of the system, have completed the commissioning test. If the shot disrupted from the plasma current higher than 500kA then the seismic monitoring system had measured the 50 GAL(magnitude 4) alarm event. For Motor Generator, programed the interlock program for the monitoring, signals checked, but did not perform the commissioning test. The sound listening system was possible to monitor the noise of machines in main experimental hall. Managing major interlock logic of the fast interlock system is carried out in CCS, but a system for transmitting the interlock and reinforcing the protecting algorism between CCS and heating devices it is fast interlock interface module. After performance test of this module in 2012, it needs to improve the protection logic. The one is reinforcing the protection logic of this module when PCS failed an operation and plasma discharging failed a startup. The function assured by testing with testing equipment before the

  • campaign. Lastly the function confirmed by the plasma discharging experiment with low plasma current.

The other is complementing the temperature interlock logic of IVCC and PFC. The function approved and implemented in CCS with new plasma control scheme in PCS. The 6th campaign is interrupted because of the FDS combustion accident. The cooperative functions of the SIS are properly operating after the accident while supplied the uninterruptable electric power. But 6 sub-interlock panels were interrupted and stopped with local I&Cs by the effect of this incident. The 7 cubicles polluted by fire ash and soot, but there was no damage to the equipment, and after washing, recovered to a normal operation state. Without significant changing compared to the current configuration in 2014, it is expected to several events adds, in particular, the one is interlocking with the central fire monitoring system , the other is upgrading of sound listening system.

2014.2.19