current status of the i nterlock system of kstar
play

Current Status of the I nterlock System of KSTAR Jaesic Hong, I n-Sik - PowerPoint PPT Presentation

Current Status of the I nterlock System of KSTAR Jaesic Hong, I n-Sik Woo a , Woongryol Lee a , Taegu Lee a , Sang-I l Lee a , Kaprai Park a , KSTAR Operation team, I ntegrated Control Team Nat at ional al Fusion Resear arch I nst it ut e (


  1. Current Status of the I nterlock System of KSTAR Jaesic Hong, I n-Sik Woo a , Woongryol Lee a , Taegu Lee a , Sang-I l Lee a , Kaprai Park a , KSTAR Operation team, I ntegrated Control Team Nat at ional al Fusion Resear arch I nst it ut e ( NFRI ), 113 113 Gw aha hang ngno no, Yus usung ung-Gu Gu, Daej ej eo eon, 305 305-333, 333, KOREA e-m ail: il:hj aesic ic@nfri. i.re.kr

  2. Abstract After 5th campaign of the KSTAR, the interlock functions of the Motor Generator System, the Seismic Detection System, the Machine Sound Listening System and the Lithium Beam Injection System was integrated and coded in the Interlock System of the KSTAR [1]. The fast interlock functions to protect for the PMS (Plasma Facing Component (PFC) Monitoring System) and heating devices was built in CCS (Central Control System) and PCS (Plasma Control System) before the plasma experiments. On the 6th campaign, interlock system carried out the mission of the interlocking without significant abnormalities generally. The events were recorded and analyzed to the impact and the result at the standpoint of the interlock on the 6th campaign. This post presents the operation results and the definitions of the interlock and the fast interlock functions. The figure shows the configuration of the current status of Interlock System. References: Jaesic Hong et al, “The Operation Result of Supervisory Interlock System for the KSTAR 1 st Campaign”, Fusion Engineering and Design 85 (2010) 500–504 KSTAR Conference 2014 KSTAR Conference 2014 2014.2.19

  3. I ndex • I ntroduction - Mission, Constitutions - Software and Operation I nterface • Events and Actions • Schematics od KSTAR I nterlock • New events in 2013 • Operation and Checking Procedure • I nterlock for Heating Devices • Conditions and interlock flow of PMS events • Plan for the 7 th Campaign • I nterlock events in 2013 • Result of the fast interlock modules • Result in 2013 KSTAR Conference 2014 2014.2.19

  4. I ntroduction  Mission : Protect the devices and prevent an accident and the logging  Constitutions : 4 Systems  Machine I nterlock System - 1 main and 12 sub- interlock cubicles , 1 computer - 233 events from 35(16 local I&C group) controllers - 238 interlock event and status send to 19 controllers  Fast I nterlock I nterface System - 4 Interlock conditions: Plasma Current, Time Window, PFC eventss, PCS events - 5 action signal to heating devices (21 outputs)  SMS I nterface - Sending shot messages of the machine interlock events - 93 Messages, 25 Groups - No limit for Users and Messages  Operations & Events Logging - Mediawiki, SMS IOC, SIS, IOC, SIS OPI ( Linux ) - SIS Information and Operation Logs, SCS Operation Logs, Brief Shot informations - Event and accident logging form with log KSTAR Conference 2014 2014.2.19

  5. Software and Operation I nterface Local I &C Local I &C I nterlock Events Local I nterlock (KI L 1, 2, 3, 4) Event SI S PLC SI S HMI & Logic Server Logic Program OS: Windows XP Interlock Logic Monitoring & Control (HMI) SMS Logics Logic coding/changing 검출기 Logic eSMS DB access I OCs …. EPI CS Fault Server OS: Linux with EPI CS SMS & SI S IOC HMI on the W_XP EPICS + freeTDS SMS Bypassing Control apache2 media Wiki mySQL PHP SMS User/event table on Windows OPI on the Linux KSTAR Conference 2014 2014.2.19

  6. Events and Actions of I nterlock System Events & Actions & Event & Actions & Systems Systems Status Status Status Status VMS CR 8 8 GEP/(MG) 14 +2 0 VMS VV(Baking) 8 + 2 0 ECH 5 6 HDS Helium 3 8 LHCD 4 3 HDS Vacuum 3 8 NBI1 8 8 Fuel & GDC 5 2 NBI PS 4 4 QDS 10+2 0 ECCD 6 4 TMS 9 8 ICRH 5 8 CLS Helium 7 8 PSI 13 + 6 15 CLS Vacuum 8 8 CCS 10 (PV:14) 11(PV +288) TF PS 4 2 PCS From CCS PV - PF PS (CS, PF) 36 52 PMS 3(PV) 0 HRS 3 + 2 8 Tritium P . 4 0 CWF 6 + 2 8 O2/H2… >31 >57 KSTAR Conference 2014 2014.2.19

  7. Schematics of KSTAR I nterlock Monitoring Actuator/ Monitoring Sub-Interlock Cubicles Reflected Memory Optical Link Optical Fiber Copper Wire KSTAR Conference 2014 2014.2.19

  8. New events in 2013 New events - SEI SMI C events: 4 events - Events & Reset Functions - Motor Generator: 4 Events - Lithium Beam (Fast & interlock) - Sound Listening System - Fixed HMI (Lost by HDD Failure) - Seismic Alarm Magnitute 1 4 50Gal 2 5 80Gal 3 5 150Gal 4 6 250Gal KSTAR Sound Seismic alarm list KSTAR Conference 2014 2014.2.19

  9. Operation and Checking Procedure KSTAR Conference 2014 2014.2.19

  10. I nterlock for Heating Devices PSI Safety Interlocks: Action as Interlock Level 3  Open main gate of Exp. Hall  Alarm of entering to the Exp. hall  Fault of access control program  Alarm of the assistant movable dosimeters positions L1, 2, L3, L4, W SI S PF PS L1, L2, L3  Ip error L3, L4, W L1, 2, L3, L4, W Control  Ip minimum fault Heating TSS  PF Error  PF overcurrent fault Fast I nterlock  PS Fault Fast I nterlock  IVC overcurrent I nterface  External fault PFC Fault, PCS Ext. Fault CCS PCS I p Error …  More than 200 ° C: PFC or NB Armor Timing( Clock and Triggers)  More than 300 ° C: PFC Fast I nterlock  More than 300 ° C: NB Armor Machine (Slow) I nterlock  More than 80 ° C IVCC Coil or more than 60 ° C of IVCC cable PMS KSTAR Conference 2014 2014.2.19

  11. Conditions and interlock flow of PMS events KSTAR Conference 2014 2014.2.19

  12. Plan for the 7 th Campaign New events - Fire Alarms - NBI I PS3 event Upgrade Sound Listening Prepare Test Station Upgrade Sound Listening System KSTAR Conference 2014 2014.2.19

  13. I nterlock Event in 2013 7 월 8 월 7 월 8 월 Description Total Description Total QDS_Level_4 1 2 3 CCS_Level3 1 0 1 QDS_Warning 1 2 3 CCS_Level4 0 1 1 TMS_Level3 2 0 2 CLS_He_Level_4 1 2 3 TMS_Level4 2 11 13 CLS_He_Warning 8 6 14 TMS_Warning 1 0 1 CWF_Level4 0 0 0 Level_1 0 1 1 CWF_Warning 0 0 0 Level_2 0 0 0 ECH_Level_4 0 1 1 Warning 0 0 2 ECH_Warning 0 0 0 Total 84 239 13 HDS_He_Level_4 0 0 0 Level 1 0 1 1 HDS_He_Warning 3 3 6 Level 2 0 1 1 HRS_Level2 0 1 1 Level 3 16 3 19 HRS_Level3 1 0 1 Level_4 48 216 264 HRS_Level4 5 2 7 Warning 20 18 38 HRS_Warning 0 1 1 I CH_Level_4 0 0 0 Level 1 & Level 2 Event: 1 time MPS_Level3 12 3 15 By FDS accident MPS_Level4 12 7 19 Level 19 Events: 13 times MPS_Warning 7 6 13 15 times By the PF PS Fault ( by Many Causes ) PSI _Level4 27 190 217 Level 4 Events 514 times 217 times by the PSI Interlock Level 4 ( by the accessing experimental hall during the shot interval ) KSTAR Conference 2014 2014.2.19

  14. Fast I nterlock Operation Result KSTAR Conference 2014 2014.2.19

  15. Conclusions In 2013, the control and the alarm monitoring of the seismic sensing system, events monitoring of the Motor Generator and the infra of the fast and machine interlock for Lithium Beam have been implemented in the interlock system. In the case of earthquake detection system, the monitoring and the control function to remote control, have checked the signal of the system, have completed the commissioning test. If the shot disrupted from the plasma current higher than 500kA then the seismic monitoring system had measured the 50 GAL(magnitude 4) alarm event. For Motor Generator, programed the interlock program for the monitoring, signals checked, but did not perform the commissioning test. The sound listening system was possible to monitor the noise of machines in main experimental hall. Managing major interlock logic of the fast interlock system is carried out in CCS, but a system for transmitting the interlock and reinforcing the protecting algorism between CCS and heating devices it is fast interlock interface module. After performance test of this module in 2012, it needs to improve the protection logic. The one is reinforcing the protection logic of this module when PCS failed an operation and plasma discharging failed a startup. The function assured by testing with testing equipment before the campaign. Lastly the function confirmed by the plasma discharging experiment with low plasma current. The other is complementing the temperature interlock logic of IVCC and PFC. The function approved and implemented in CCS with new plasma control scheme in PCS. The 6 th campaign is interrupted because of the FDS combustion accident. The cooperative functions of the SIS are properly operating after the accident while supplied the uninterruptable electric power. But 6 sub-interlock panels were interrupted and stopped with local I&Cs by the effect of this incident. The 7 cubicles polluted by fire ash and soot, but there was no damage to the equipment, and after washing, recovered to a normal operation state. Without significant changing compared to the current configuration in 2014, it is expected to several events adds, in particular, the one is interlocking with the central fire monitoring system , the other is upgrading of sound listening system. KSTAR Conference 2014 2014.2.19

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.

Recommend


More recommend