slide-1
SLIDE 1

COSGRAY ROAD E XT E NSI ON

City o f Hillia rd Ohio De pa rtme nt o f T ra nspo rta tio n F RA-COSGRAY ROAD, PI D 90989

Aug ust 12, 2014

slide-2
SLIDE 2
  • Lack of north‐south connectivity
  • Long queues at intersections today
  • Contributes to rear‐end collisions
  • Congestion predicted to worsen
  • Lack of bicycle/pedestrian facilities

EXISTING CONDITIONS

slide-3
SLIDE 3
  • Improve north‐south connectivity
  • Reduce congestion
  • Improve safety
  • Enhance alternative travel modes

PROJECT PURPOSE

slide-4
SLIDE 4

ZONING

  • Includes Jerman Tract
  • Retail, office, and

recreational land uses

  • Zoning approved in

2010 by City and Big Darby Accord

slide-5
SLIDE 5

ZONING

  • Includes Jerman Tract
  • Retail, office, and

recreational land uses

  • Zoning approved in

2010 by City and Big Darby Accord

2008/2010: Willoway Wholesale/MJC Holdings LLC (Campus at Alton Darby) 2013: Planned Development Company of Ohio (Heritage Preserve)

slide-6
SLIDE 6
  • Project focuses on transportation network
  • Considers stormwater & future development
  • Project will not focus on zoning &/or land uses
slide-7
SLIDE 7

RECOMMENDED ALTERNATIVE

  • “Green” median with

bioswales

  • Multi‐use paths on both sides

and on‐street bike accommodations

  • Enhanced pedestrian crossing

for regional bike trail

  • Roundabout with access to

public soccer fields & Jerman site

  • Roundabout at Alton & Darby

Creek Road intersection

  • 35‐mph speed limit
slide-8
SLIDE 8

COSGRAY ROAD EXTENSION TYPICAL ROADWAY ELEVATION VIEW

slide-9
SLIDE 9
  • Roundabout at Soccer Field/Main Site Drive Intersection
  • Allows for safe bike/ped crossing of Cosgray Extension
  • Maximizes median/bioswale length
  • Slower speeds (20‐25 mph design speed)
slide-10
SLIDE 10
  • Roundabout at Alton & Darby Creek intersection
  • Slower speeds (20‐25 mph design speed)
  • Traditional (4‐leg) intersection on curve not desirable
slide-11
SLIDE 11
  • Multi‐use path
  • Future regional trail

connection

  • On‐street bicycle facilities
  • Split median pedestrian

crossings

  • Future extensions to Municipal

Park & Prairie Oaks Metro Park

PEDESTRIANS & BICYCLES

slide-12
SLIDE 12

TYPICAL SPLIT MEDIAN CROSSING ELEVATION VIEW

slide-13
SLIDE 13

28 34 79

City of Hilliard Big Darby Creek Watershed Zero Runoff in 2‐Year Rain Storm Runoff Storage Volume (acre‐feet)

Cosgray Road Extension Will Exceed Stormwater Requirements

COSGRAY ROAD EXTENSION PROJECT

slide-14
SLIDE 14
  • 2014/2015: Finish

environmental studies & preliminary design

  • 2015/2016: Final Design
  • 2016: Right‐of‐Way Acquisition
  • 2017: Construction

*All dates are subject to funding availability.

NEXT STEPS

slide-15
SLIDE 15
  • Comments must be received by August 26, 2014
  • Comments can be provided:
  • Comment form (dropped off at meeting or mailed)
  • Email: lschamp@hilliardohio.gov
  • Project website: www.hilliardohio.gov/

PUBLIC COMMENTS

slide-16
SLIDE 16