- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay/North Bend Transportation System Plan Updates PAC Meeting - - PowerPoint PPT Presentation
Coos Bay/North Bend Transportation System Plan Updates PAC Meeting - - PowerPoint PPT Presentation
Edit Master text styles Second level Third level Fourth level Fifth level Coos Bay/North Bend Transportation System Plan Updates PAC Meeting #2 June 4, 2019 1:00 PM 4:00 PM Overview Agenda Review Edit Master
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Overview
Agenda Review
- Meeting objectives (15 min)
- Project status update (15 min)
- Transportation project list (60 min)
- Priorities exercise (45 min)
- Small group discussion (30 min)
- Next steps (15 min)
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Overview
Meeting Objectives Review and discuss key elements of work completed by project team
- Plan goals, objectives, and evaluation criteria
- Transportation system inventory and existing
conditions
- Future transportation needs
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Task 2018 2019 2020
Review of Plans and Policies Goals and Objectives Funding Forecast Existing Future System Alternatives Development Preferred Alternative Code and Ordinances, Policy/Standards Draft/Revised TSPs Planning Commission/City Council Final TSPs
Project Update
Project Schedule
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Policy Background
TSP Goals, Objectives, and Evaluation Criteria
North Bend & Coos Bay TSP Goals
- Goal #1: Continue development of an
interconnected, multimodal transportation network that connects all members of the community to destinations within and beyond the city.
- Goal #2: Provide a transportation
system that enhances the safety and security of all transportation modes.
- Goal #3: Optimize the performance of
the transportation system for the efficient movement of people and goods.
- Goal #4: Provide an equitable, balanced
and connected multi-modal transportation system.
North Bend & Coos Bay TSP Goals
- Goal #5: Provide a transportation
system that supports existing industry and encourages economic development in the city.
- Goal #6: Develop and maintain a
Transportation System Plan that is consistent with the goals and objectives
- f the city, Coos County, and the state.
- Goal #7: Provide a sustainable
transportation system through responsible stewardship of financial resources.
- Goal #8: Provide a transportation
system that enhances the health of residents and users and that minimizes impacts to the environment.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
PAC #1 Recap: Existing/Future Opportunities
Pedestrian
- North Bend highest needs west of Broadway and on OR 540
- Coos Bay highest needs on US 101, Front St and near medical facilities
- Lacking or wide crossings of US 101 and OR 540
- Safe Routes to School priority list
Bicycle
- Need for parallel routes to OR 540 and US 101
- Limited to no formal bicycle facilities on arterials/collectors
- Oregon Coast Bicycle Route update
Transit
- Lacking weekend fixed-route service
- Mostly “fair” stops and service options
Safety
- Most collisions related to yielding right of way, inattention/driver error
- A few hotspots in each City
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
PAC #1 Recap: Existing/Future Opportunities
Roadway
- Need to streamline functional classification for consistency with ODOT/FHWA
- Traffic operations are not expected to worsen considerably – just a few hot spot locations
(Newmark/Broadway and US 101 major intersections)
- Maintenance (pavement condition)
Rail/Truck Freight
- At-grade multimodal improvements to access key community destinations
- Highway Over-Dimension load pinch points (Mill Casino/Lewis St and Curtis Ave at US 101)
Marine/Airport
- Lacking regional commercial passenger airline service
- Improved multimodal connectivity to airport
- Marine improvements to support industry
Planned Projects
- 3 STIP Projects: Broadway/Newmark, US 101/Johnson, Bunker Hill
- ADA Ramps on State facilities
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
PAC #1 Recap: Priorities
- Identify funding sources
- Refine the bike/ped to a targeted list
- Maintenance of existing system (resiliency)
- Safe Routes to School
- Neighborhood traffic calming
- Mobility (ADA)
- Capture ALL needs in the TSP, even if they are unlikely to have
funding
- CCAT: Support Cities’ priorities and collaborate on funding
- pportunities to improve transit
- Tribes: Support Cities’ priorities and identify potential for teaming
to capitalize on available funding
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
PAC #1 Recap: Funding Forecast
City of North Bend
Revenue (Case A) FY19-FY40 St Hwy Fund - Allocated to City $17,695,000 Total $17,695,000 Revenue (Case B) FY19-FY40 St Hwy Fund - Allocated to City $19,010,000 Total $19,010,000 Expense FY19-FY40 Operations and Maintenance $9,020,000 Capital $2,200,000 Total $11,220,000
Revenue less Expenses: $6.48 M – $7.79M
City of Coos Bay
Revenue (Case A) FY19-FY40 St Hwy Fund - Allocated to City $30,001,000 Franchise Fees $8,800,000 Total $38,801,000 Revenue (Case B) FY19-FY40 St Hwy Fund - Allocated to City $32,230,000 Franchise Fees $8,800,000 Total $41,030,000 Expense FY19-FY40 Operations and Maintenance $22,000,000 Capital $4,400,000 Total $26,400,000
Revenue less Expenses: $12.4 M – $14.6M
Roughly $12 to $14 Million available for capital projects
- ver the next 20 years
All Figures in 2018 dollars Alternatively, each City could increase its level of maintenance spending and dedicate the remaining revenues to capital projects.
Roughly $6 to $8 Million available for capital projects
- ver the next 20 years
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Status Update: Deliverables
Tech Memo #8: Draft System Alternatives
Section 1: Transportation Tools and Guidelines
- Transportation System Management (TSM)
& TSM Toolbox
- Transportation Demand Management (TDM)
- Street Functional Classification
Section 2: Transportation System Alternatives
- Alternatives Development Process
- Solutions Evaluation and Refinement
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Draft System Alternatives
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Planned Projects
ID Project Name Location Cost Estimate Primary Funding Source Source
NB-1
STIP: Broadway St/Newmark Ave Intersection Realignment Broadway St at Newmark Ave N/A ODOT STIP
- Upgrade signal poles and hardware
- Convert the 4-Lane roadway to 3-lane roadway on Newmark St/Ave with
center turn lane
- Dual eastbound left-turn lanes
- Bicycle lanes
- Curb extensions and advance warning signs to improve pedestrian safety
- Access control in SW quadrant
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Planned Projects
ID Project Name Location Cost Estimate Primary Funding Source Source
CB-1
Millicoma Middle School Safe Routes to School D St/Coos River Hwy: 6th Ave to Ross Inlet Rd $2M grant Safe Routes to School SRTS Add sidewalks to both sides of roadway (safe routes to school).
CB-2
Johnson Ave Signal Timing Johnson Ave at US 101 North N/A ODOT STIP STIP project planned to adjust timing (signal phasing and coordination)
CB-3
Bunker Hill Sidewalks and Flanagan Signal Newport Ln: Flanagan Rd to Mullen Rd N/A ODOT STIP STIP project planned to provide sidewalk from Flanagan Rd to Mullen Rd and provide static pedestrian crossings.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Plans
ID Project Name Location Cost Estimate Primary Funding Source
NB-2
North Bend Trail Map City Wide N/A North Bend Develop formalized trail map and continue to connect sidewalk system to trails or shared-use paths
NB-3
Safe Routes to School Plan North Bend Schools N/A North Bend Develop a Safe Routes to School Project List (Assess all connections to school, draft plan to connect safe routes to school)
NB-4
Functional Classification Updates City Wide N/A North Bend Change "Collector" term into "Major Collector" and the “Neighborhood Route” into "Minor Collector" to align with State Classification
NB-5
Colorado Ave Functional Class. Colorado Ave: Arthur St to West End N/A North Bend Update functional classification from “Local” to “Major Collector”
NB-6
Arthur St Functional Class. Arthur St N/A North Bend Update functional classification from collector to "Minor Collector"
NB-7
Capital Improvement Plan City Wide N/A North Bend Establish Capital Improvement Plan (CIP) and plan for annual/bi-annual update
NB-8
Evacuation Routes City Wide N/A North Bend Include evacuation routes in TSP (DOGAMI Beat the Wave)
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Plans
ID Project Name Location Cost Estimate Primary Funding Source
CB-4
Coos Bay Trail Map City Wide N/A Coos Bay Develop formalized trail map and continue to connect sidewalk system to trails or shared-use paths
CB-5
Safe Routes to School Plan Coos Bay Schools N/A Coos Bay Develop a Safe Routes to School Project List (Assess all connections to school, draft plan to connect safe routes to school)
CB-6
Functional Classification Updates City Wide N/A Coos Bay Change "Collector" term into "Major Collector" and the “Neighborhood Route” into "Minor Collector" to align with State Classification
CB-7
Koosbay Blvd Functional Class. Koosbay Blvd: 10th St to US 101 N/A Coos Bay Update functional classifications - Classification between 10th Street and US 101 (arterial) differs from the State's classification as an urban collector.
CB-8
Evacuation Routes City Wide N/A Coos Bay Include evacuation routes in TSP (DOGAMI Beat the Wave)
CB-9
Front St Traffic Safety Plan Front St N/A Coos Bay Traffic Safety Plan in support of future development of Front St
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Pedestrian Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB-9
Sheridan Ave Pedestrian Improvements Sheridan Ave: Florida Ave to Bayview Ave $1.4M North Bend Add sidewalk on Sheridan Ave and upgrade RR crossing to connect Simpson Heights to downtown
NB- 10
16th St/17th St Sidewalks 16th St/17th St: Broadway Ave to Oak St $2.1M North Bend Add sidewalk to provide connectivity to schools east of Broadway Ave via 16th St
NB- 11
Oak St Neighborhood Greenway Oak St: Colorado Ave to Newmark Ave TBD North Bend Establish Neighborhood Greenway (traffic calming measures and wayfinding) to improve pedestrian environment
NB- 12
Pacific St Pedestrian Improvements Pacific St: Crowell Ln to 16th St $730k North Bend Sidewalk on west side and enhanced crossings (visibility)
NB- 13
Virginia Ave Pedestrian Improvements Virginia Ave: US 101 to Broadway Ave TBD ODOT Identify opportunities for access consolidation (with redevelopment/change of use); traffic calming (landscaping, street furniture)
NB- 14
Newmark Ave Access Management Newmark Ave: Broadway Ave to West City Limits $175k ODOT Consolidate driveway accesses and construct a median on Broadway Ave
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Pedestrian Alternatives (cont’d)
ID Project Name Location Cost Estimate Primary Funding Source
NB- 15
Newmark St Half Street Improvement Newmark St: US 101 to Sherman Ave $1M North Bend Half street improvement on Newmark St from Sherman Ave to US 101 to provide bicycle (westbound bicycle lane) and pedestrian facilities (sidewalk, curb and gutter)
NB- 16
North Bend Senior Activity Center Pedestrian Improvements Colorado Avenue near North Bend Senior Activity Center $375k North Bend Marked crossing of Colorado Avenue and sidewalks from transit stop to North Bend Senior Activity Center
NB- 17
Boynton Park Pedestrian Crossing Sherman Ave/Exchange St Transit Stop $65k North Bend Marked crossing of Sherman Avenue at Exchange Street transit stop
NB- 18
Airport Heights Market Pedestrian Crossing Lincoln St/Virginia Ave TBD North Bend Improve pedestrian crossing visibility of Virginia Ave at Lincoln St
NB- 19
North US 101 Pedestrian Crossing US 101 north of Florida Ave TBD ODOT Identify preferred location for pedestrian crossing of US 101 north of Florida Ave
NB- 20
Connect the Boardwalks North Bend, Mill Casino and Coos Bay Boardwalks TBD North Bend; Coos Bay; Private Connect the area boardwalks to create a five mile uninterrupted boardwalk.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Pedestrian Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 10
Morrison St Sidewalks Morrison St: Newmark Ave to Pacific Ave $2.5M Coos Bay Provide sidewalks on both sides of Morrison St (pedestrian connectivity near Madison Elementary School)
CB- 11
Koosbay Blvd Traffic Calming Koos Bay Blvd: North City Limits to US 101 TBD Coos Bay Infill sidewalk to provide pedestrian access on at least one side of street. Establish Neighborhood Greenway (traffic calming measures and wayfinding).
CB- 12
Mingus Park Wayfinding Mingus Park $20-50k Coos Bay Wayfinding signs to park
CB- 13
Newmark Ave Pedestrian Improvements Newmark Ave: Empire Blvd to Fir St TBD Coos Bay Improve pedestrian comfort (PLTS score) through access consolidation, median islands, mid-block ped crossing
CB- 14
Woodland Dr Pedestrian Improvements Woodland Dr: North City Limits to Ocean Blvd $3.2M Coos Bay Add sidewalks on Woodland Dr and a marked pedestrian crossing to access to Hospital/Medical Park.
CB- 15
Thompson Rd Pedestrian Crossing Thompson Road near Bay Area Hospital $50k Coos Bay Add marked crossing and mid-block crossing of Thompson Road to access hospital transit stop.
CB- 16
Hospital Way Sidewalk Hospital Way near Medical Center (Immediate Care Clinic) $560k Coos Bay Add sidewalk on north side of Hospital Way to connect to medical facilities.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Pedestrian Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 17
Wallace St Pedestrian Improvements Wallace St at Ocean Blvd $400k Coos Bay
Construct sidewalk along Wallace St and add RRFB crossing of Ocean Blvd at Wallace St to connect to transit.
CB- 18
Coos Bay Boardwalk RR Crossing Pedestrian Improvements Coos Bay Boardwalk (near Anderson Ave and Market Ave) $500k Coos Bay; Coos Bay Rail Construct at-grade multimodal improvements (pavement)
CB- 19
US 101 Downtown Pedestrian Crossings US 101: Commercial Ave and Alder Ave $100k ODOT Improved bike/pedestrian crossings across US 101 to be consistent with Front Street Action Plan
CB- 20
LaClair St Pedestrian Crossing Ocean Blvd at LaClair St $200k Coos Bay Construct a pedestrian crossing of Ocean Blvd at LaClair St with RRFB and median refuge.
CB- 21
Front Street Multi-Use Path Front St near Coos History Museum and Maritime Collection N/A Coos Bay; Private North-south pedestrian pathway along the eastern side of Front St
CB- 22
Connect the Boardwalks North Bend, Mill Casino and Coos Bay Boardwalks TBD North Bend; Coos Bay; Private Connect the area boardwalks to create a five mile uninterrupted boardwalk.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Bicycle Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 21
Bicycle Transportation Plan City Wide TBD North Bend Create a Bicycle Transportation Plan that connects Arterials, Collectors (neighborhood calming, parallel routes, signing, formal striping)
NB- 22
Broadway Ave Bicycle Facilities Broadway Ave (Cape Arago Hwy) TBD North Bend Provide bicycle facilities through coordination with the Oregon Coast Bicycle Route (Priority Virginia Ave to 16th St)
NB- 23
NW North Bend Bicycle Facilities Maple Leaf St/Colorado Ave $1.6M North Bend Stripe bicycle facilities (with repaving project) between Virginia Ave and the western terminus of Colorado Ave
NB- 24
Sheridan Ave Bicycle Facilities Sheridan Ave: Florida Ave to Bayview Ave $25k North Bend Provide bicycle facilities through signing/striping (Could be paired with NB-9 for more substantial improvements)
NB- 25
Neighborhood Greenway Plan Varies TBD North Bend Establish Neighborhood Greenway (traffic calming measures and wayfinding): Harrison, Pony Creek, Crowell, 16th, Myrtle, 17th, Oak, Lakeshore, Virginia Ave
NB- 26
Newmark Ave Bicycle Facilities Newmark Ave (Cape Arago Hwy) $32k ODOT Provide bicycle facilities (OCBR) through lane diet or parallel routes/wayfinding. Parallel route options: Oak St, 16th/17th, Myrtle St, Commercial St.
NB- 27
Newmark St Road Diet Newmark St: Sherman Ave to Broadway Ave $6.1M North Bend Provide bicycle facilities through restriping (with repaving project)
NB- 28
US 101 Bicycle Facilities Varies TBD ODOT Provide bicycle facilities (OCBR priority) through parallel routes
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Bicycle Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 23
Bicycle Transportation Plan City Wide TBD Coos Bay Create a Bicycle Transportation Plan that connects Arterials, Collectors (neighborhood calming, parallel routes, signing, formal striping)
CB- 24
Ocean Blvd Road Diet (Phase II) Ocean Blvd: Newmark Blvd to Woodland Dr $115-300k Coos Bay Extend road diet west from Woodland Dr to Newmark Blvd and provide mid-block ped crossing at Wallace St and LaClair St.
CB- 25
Newmark Ave Road Diet Newmark Ave: Ackerman Ave to Cammann St $25k Coos Bay Restripe road from 5-lanes to 3-lanes to provide bicycle facilities on Newmark Ave.
CB- 26
Woodland Dr Bicycle Facilities Woodland Dr: North City Limits to Ocean Blvd $40k Coos Bay Add bicycle facilities to Woodland Dr (add sharrows if ROW acquisition not feasible).
CB- 27
Newport Ln Bicycle Signage/Wayfinding Newport Ln Between Coos Bay UGB TBD Coos County Improve bicycle comfort (BLTS) through enhanced signage & wayfinding to connect Coos Bay UGB.
CB- 28
D St/Coos River Rd Shoulder Widening D St/Coos River Rd: 6th Ave to East City Limits $690k Coos Bay Widen paved shoulder and provide enhanced signage & wayfinding.
CB- 29
US 101 Southern Bicycle Lanes US 101: South couplet to Coalbank Slough Bridge $20-75k ODOT Restripe to accommodate bicycle lane (options for additional signing/striping/ramp at bridge)
CB- 30
US 101 Bicycle Facilities Varies TBD ODOT Provide bicycle facilities (OCBR priority) through parallel routes
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Transit Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 29
Bay Area Loop Weekend Service Bay Area Loop N/A CCAT Add weekend service
NB- 30
Transit Service Hours All Transit Routes N/A CCAT Extend service hours
NB- 31
Transit Frequency All routes and US 101/Sherman Ave N/A CCAT Increase frequency & add additional route along US 101 and Sherman Ave
NB- 32
Shelters and Stops Community Destinations N/A CCAT Add shelters and stops near community destinations
NB- 33
Bike/Ped Transit Connectivity All Transit Stops N/A CCAT Improve bicycle and pedestrian connectivity to transit stops
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Transit Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 31
Bay Area Loop Weekend Service Bay Area Loop N/A CCAT Add weekend service
CB- 32
Transit Service Hours All Transit Routes N/A CCAT Extend service hours
CB- 33
Transit Frequency All routes and US 101/Ocean Blvd N/A CCAT Increase frequency & add additional route along US 101 and Ocean Blvd
CB- 34
Shelters and Stops Community Destinations N/A CCAT Add shelters and stops near community destinations
CB- 35
Bike/Ped Transit Connectivity All Transit Stops N/A CCAT Improve bicycle and pedestrian connectivity to transit stops
CB- 36
Regional Transit Hub Bay Area N/A CCAT Support CCAT in their pursuit of a regional transit hub.
CB- 37
Bike/Ped Transit Connectivity TBD N/A CCAT Work with CCAT to identify locations for transit pull outs on busier streets.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Safety Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 34
Virginia Ave/Meade Ave Traffic Calming Virginia Ave at Meade Ave TBD North Bend (Urban Renewal) Traffic calming along Meade and Connecticut: Narrow up street feeling (bulb outs, speed humps, formalize on street parking) -- Mimic aspects of Downtown Streetscape.
NB- 35
Newmark Ave/Oak St Visibility Newmark Ave at Oak St N/A ODOT Enhance visibility of signal and pavement paint/crossings -- recent improvements may improve conditions.
NB- 36
US 101/Florida Ave Safety Improvements US 101 at Florida Ave N/A ODOT Monitor crash history in future -- recent improvements may improve conditions. Note: 2015 pedestrian fatality was north of Florida on US 101.
NB- 37
US 101 South/Virginia Ave Safety Improvements US 101 South at Virginia Ave N/A ODOT Monitor crash history in future -- recent improvements may improve conditions.
NB- 38
Washington Ave/US 101 Pedestrian Crossing Enhancements Washington Ave at US 101 South/Sherman Ave $5-30k ODOT Explore options to provide safer pedestrian crossing of highway (curb bulb outs, RRFB, median refuge, lighting, signage). Pedestrian signage is most viable option.
NB- 39
Pony Creek Rd/Crowell Ln Intersection Modification Pony Creek Rd at Crowell Ln $50k North Bend Tighten radius of western curbs, pavement markings, formalize striping on Pony Creek Rd and consider all-way stop control.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Safety Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 40
US 101/Newmark St Safety Improvements US 101 at Newmark St N/A ODOT Monitor crash history in future -- recent timing improvements may improve conditions.
NB- 41
US 101/California Safety Enhancements US 101 at California Ave N/A ODOT Monitor crash history in future -- recent improvements may improve conditions.
NB- 42
State St Visibility Broadway Ave (OR 540) at State St N/A ODOT Explore enhanced striping/channelization/overhead signage to improve sight distance and driver expectancy.
NB- 43
Newmark St/Brussels St Visibility Newmark St at Brussels St $850k North Bend Improve visibility by repaving and restriping.
NB- 44
Newmark St/Sherman Ave Visibility Newmark St at Sherman Ave $850k North Bend Improve visibility by repaving and restriping.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Safety Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 38
Ocean Blvd/19th St Access Management Ocean Blvd at 19th St TBD Coos Bay Enhanced channelization of side street to improve safety.
CB- 39
Thompson Ave/Woodland Dr Safety Enhancements Thompson Ave at Woodland Dr $300k Coos Bay Evaluate safety improvements: Signalization or advanced warning signage
CB- 40
Koosbay Blvd/10th St Realignment Koosbay Blvd at 10th St TBD Coos Bay Realign intersection to "T" to improve visibility and safety.
CB- 41
US 101/Kruse Ave Access Management US 101: near Kruse Ave $100k ODOT Limit access into 1st St from Kruse and upgrade S Front Street and W Lockart Ave to standard.
CB- 42
S 10th St Curb Extensions S 10th St: near Central Ave $40k Coos Bay Curb bump outs (consistent through downtown)
CB- 43
Ingersoll St Curb Extensions Ingersoll St: near S 2nd St $40k Coos Bay Curb bump outs (consistent through downtown)
CB- 44
7th St Curb Extensions 7th St at Ingersoll Ave $40k Coos Bay Curb bump outs at 7th St/Ingersoll Ave.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Roadway Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 45
Local Street Connectivity Varies TBD North Bend Identify future connections in functional classification plan of Clark St, State St, Wall St, Lombard St for local street connectivity Pony Creek Estuary Plan preserves space.
NB- 46
Pavement Maintenance City Wide $16.5M (2014 $) North Bend Maintain/fix/strengthen existing pavement system, account for maintenance in funding plan. Critical: Arterials and collectors with fair or worse pavement conditions
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Roadway Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 45
Schoneman Ave Street Upgrade Schoneman Ave: Lakeshore Dr to Newmark Ave $1.4M Coos Bay Upgrade to collector standard (storm/curb/gutter/sidewalk) and connect to trail system in John Topits Park
CB- 46
Newmark Ave/Ocean Blvd Realignment Newmark Ave at Ocean Blvd TBD Coos Bay Realign Ocean Blvd at Newmark Ave to "T", shorten ped crossing, improve connectivity to Transit
CB- 47
Newmark Ave/Morrison St Upgrades Newmark Ave at Morrison St N/A Coos Bay Operations expected to exceed City mobility target (LOS F) but low volumes do not warrant traffic control. No alternative identified; continue to monitor intersection as volumes do not warrant traffic control
CB- 48
7th St/Anderson Ave Access Management 7th St at Anderson Ave TBD Coos Bay Channelization/access management of local streets.
CB- 49
Hall Ave/US 101 N Upgrades Hall Ave at US 101 N N/A Coos Bay No alternative identified; continue to monitor intersection as expected to meet ODOT mobility targets.
CB- 50
South Coos Bay Pavement US 101 South: Johnson Ave to Kruse Ave $25k ODOT; Coos Bay Provide landscaping or pedestrian buffer to reduce large, underutilized pavement area on east side of US 101 Southbound.
CB- 51
S Front St Street Upgrade US 101 South: Kruse Ave to S Front St $1-2M Coos Bay Upgrade S Front St to its arterial standard cross-section and limit access to right-in/right out at Kruse Ave/S 1st St.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Roadway Alternatives (cont’d)
ID Project Name Location Cost Estimate Primary Funding Source
CB- 52
Pavement Maintenance City wide $66M (2015 $) Coos Bay Maintain/fix/strengthen existing pavement system, account for maintenance in funding plan. Critical: Central Ave, Southwest Blvd, Koosbay Blvd, Blanco Ave, Radar Rd, Schoneman St, LaClair St, F St, Butler Rd, Juniper Ave and Fulton Ave
CB- 53
Newport Ln/Isthmus Slough Bridge Widening Newport Ln/Isthmus Slough Bridge N/A
ODOT
Replace Newport Ln/Isthmus Slough Bridge with modernized structure. Include connections for
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Rail/Truck Freight Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 47
Infrastructure improvements Coos Bay Rail Line N/A ODOT; Coos Bay Rail Make improvements to bridges, spurs, tracks, transload sidings, at grade crossings and tunnels as identified in the OFP to create
- r improve multimodal business opportunities.
NB- 48
Lewis Street/Mill Casino Signal Head US 101 at Lewis Street/Mill Casino $250k ODOT Address Highway Over-Dimension Load Pinch Point by raising signal head
NB- 49
California Ave Upgrades California Ave between Sherman Ave, US 101 and the Dock Facility/North Bend Boardwalk $2M ODOT; North Bend (pavement) Address poor pavement condition (2015) data, widen roadway, improve safety at rail crossing, improve turning movements for
- ne-way portion per OFP
NB- 50
US 101 at Florida Ave Pavement Upgrade US 101 at Florida Ave N/A ODOT Make modifications to accommodate high heavy vehicle volumes per OFP. Information provided by ODOT suggested this is no longer a deficiency.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Rail/Truck Freight Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 54
Infrastructure improvements Coos Bay Rail Line N/A ODOT; Coos Bay Rail Make improvements to bridges, spurs, tracks, transload sidings, at grade crossings and tunnels as identified in the OFP to create
- r improve multimodal business opportunities.
CB- 55
Market Ave/Front St RR Crossing Upgrade Market Ave at Front St See CB-18 Coos Bay Rail Install at-grade rail active warning device
CB- 56
Market Ave/Front St RR Crossing Upgrade US 101 at US plywood-Central Dock Rd $500k Coos Bay Rail Install at-grade rail active warning device
CB- 57
US 101/Curtis Ave Signal Head Upgrade US 101 at Curtis Ave $50-100k ODOT Address Highway Over-Dimension Load Pinch Point by raising signal head
CB- 58
US 101/Koosbay Blvd Upgrades US 101 at Koosbay Blvd TBD ODOT Make modifications to accommodate high heavy vehicle volumes per OFP
CB- 59
US 101/Commercial Ave Upgrades US 101 South at Commercial Ave TBD ODOT Make modifications to accommodate high heavy vehicle volumes per OFP
CB- 60
US 101 North/Johnson Ave Upgrades US 101 North at Johnson Ave TBD ODOT Make modifications to accommodate high heavy vehicle volumes per OFP
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
North Bend Marine/Airport Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
NB- 51
North Bend City Dock City Dock: Virginia Ave/Harbor Ave TBD North Bend Construct a new city dock at the eastern terminus of Virginia Ave (per Downtown Waterfront District Master Plan)
NB- 52
Marine Ways Enhancements Charleston boatyard TBD Port of Coos Bay Improvements that include the Marine Ways
NB- 53
North Spit Improvements North Spit (Oregon Gateway) TBD Port of Coos Bay North Spit improvements to accommodate a multi-modal marine facility to handle bulk cargo, containers and an LNG export facility
NB- 54
Channel Widening/Deepening Coos Bay TBD Port of Coos Bay Federal channel widening and deepening to accommodate larger ships and ensure safer operations
NB- 55
Charleston Boatyard Dock Replacements Charleston Boatyard TBD Port of Coos Bay Dock replacements
NB- 56
Expanded Passenger Service Airport TBD Coos County Airport District Add direct commercial passenger service between Southwest Regional Airport and northwest hubs (Portland)
NB- 57
Airport Transit Service Airport TBD CCAT Provide transit service to airport if air passenger service increases
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Coos Bay Marine/Airport Alternatives
ID Project Name Location Cost Estimate Primary Funding Source
CB- 61
Marine Ways Enhancements Charleston boatyard TBD Port of Coos Bay Improvements that include the Marine Ways
CB- 62
North Spit Improvements North Spit (Oregon Gateway) TBD Port of Coos Bay North Spit improvements to accommodate a multi-modal marine facility to handle bulk cargo, containers and an LNG export facility
CB- 63
Channel Widening/Deepening Coos Bay TBD Port of Coos Bay Federal channel widening and deepening to accommodate larger ships and ensure safer operations
CB- 64
Charleston Boatyard Dock Replacements Charleston Boatyard TBD Port of Coos Bay Dock replacements
CB- 65
Expanded Passenger Service Airport TBD Coos County Airport District Add direct commercial passenger service between Southwest Regional Airport and northwest hubs (Portland)
CB- 66
Expanded Passenger Service Airport TBD Coos County Airport District Add direct commercial passenger service between Southwest Regional Airport and northwest hubs (Portland)
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Priorities Exercise
Project List Prioritization
- Distribute your stickers to 3 high priority projects
within each category
- Limited funding means that we must make trade-
- ffs in deciding which project types get funding.
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Group Discussion Q&A
- Break into two discussion groups: one for North
Bend and one for Coos Bay
- Which needs should be prioritized given the goals
and objectives of the TSPs and constrained funding levels? (20 mins)
- Did any of the results surprise you?
- Report back (10 mins)
- Edit Master text styles
- Second level
- Third level
- Fourth level
- Fifth level
Closing Next Steps
- Schedule PAC #3
- Schedule Public Workshop #2
- Draft TSPs
- Policies and Standards Memorandum
- Code Provisions and Ordinance Amendments