Consume r s E ne r gy Non-Wir e s Solutions May 13, 2020 Age - PowerPoint PPT Presentation

Consume r s E ne r gy Non-Wir e s Solutions May 13, 2020 Age nda Bac kgr ound Pilot #1: Swar tz Cr e e k Substation Sub statio n Summary F ie ld te st o f c o nc e pts T ime line and Appro ac h T ime limite d


  1. Consume r s E ne r gy Non-Wir e s Solutions May 13, 2020

  2. Age nda Bac kgr ound Pilot #1: Swar tz Cr e e k Substation • Sub statio n Summary • F ie ld te st o f c o nc e pts • T ime line and Appro ac h • T ime limite d • L e sso ns L e arne d Pilot #2: 4 Mile Substation • Sub statio n Summary • T ime line • Multi-ye ar • Se le c tio n Pro c e ss • De sig ne d fo r de fe rral • Quic k L aunc h Pro g rams • De e p Dive Analysis • Appro ac h Wor king Gr oup 2

  3. Non-Wir e s Solutions (NWS) Pilots • Pilo t starte d in 2015 as c o llabo ratio n be twe e n NRDC and Co nsume rs E ne rg y, be fo re the c o nc e pt o f NWS g aine d mo me ntum natio nally • Co nsume rs E ne rg y launc he d its first NWS pilo t lo c atio n at Swartz Cre e k in 2017 • I n 2018 and be yo nd, NWS are be ing intro duc e d into utility planning pro c e sse s • Pilo ts are fo c use d o n inc re ase d partic ipatio n in e xisting E ne rg y Waste Re duc tio n (E WR) and De mand Re spo nse (DR) pro g rams to de te rmine if NWS are a viable lo we r c o st o ptio n to infrastruc ture upg rade s • Pilo ts are c urre ntly funde d and manag e d within the DR and E WR po rtfo lio s, but that may e vo lve o ve r time 3

  4. Pilot #1: Swar tz Cr e e k 4

  5. Swar tz Cr e e k Ove r vie w ~4500 R e side ntial Ac c ounts Whe r e is Swar tz • 63% o f to tal kWh Cr e e k? • ~6200 ave rag e kWh/ ye ar • L o we r than ave rag e inc o me ~300 C&I Ac c ounts • 37% o f to tal kWh • ~50,000 ave rag e kWh/ ye ar • No industrial lo ad • 2 larg e st c usto me rs ~50% o f kWh L oad R e duc tion • T arg e t (2018) - 1.5MW • Ac hie ve d (2018)– 560kW (me asure saving s) 5

  6. Swar tz Cr e e k T ime line / Appr oac h Community Based • Community Events • Community Challenge Planning and Analysis • School Program • Door to Door Campaign Pro g ram May 2017- July 2017 Bonus Incentives (July-Sept.) De ve lo pme nt Aug 2017- Oct 2017 Pro g ram L aunc h Oct 2017- Dec 2018 Pro g ram E valuatio n Oct 2018- Feb 2019 560 kW load reduction 6

  7. L e ssons L e ar ne d • Data drive n Distribute d E ne rg y Re so urc e (DE R) analysis alo ne may no t paint a full pic ture Use o f fie ld visits c ro ss re fe re nc e d with site analysis are ne e de d to e stablish o re alistic g o als, strate g ie s, and tac tic s • Hype r marke ting and appro ac h may no t be e no ug h E nable bo nus inc e ntive s e arly o n o • A “dive rse ” c o mmunity will allo w fo r be tte r Pilo t le arning Rang e o f c usto me rs fo r bo th re side ntial and C&I o • Dire c t inte rac tio ns with C&I c usto me rs are o ptimal Use asse ssme nt te am to e duc ate C&I c usto me rs o One -o n-o ne inte rac tio ns with C&I c usto me rs are mo st e ffe c tive o Co ve r all in first inte rac tio n o • Syste m pe aks may o c c ur o utside o f DR pro g ram windo ws 7

  8. Pilot #2: F our Mile 8

  9. F our Mile Ove r vie w ~4250 Ac c ounts • Dive rse Co mmunity ~3500 R e side ntial Ac c ounts • 18% o f to tal kWh ~750 C&I Ac c ounts • 82% o f to tal kWh • ~250 Me dium and L arg e ac c o unts • ~500 Small ac c o unts L oad R e duc tion • T arg e t (2024) - .34MW 9

  10. F our Mile T ime line Pha se 0 Pha se 1 Pha se 2 I nitial Planning Site Se le c tio n and Analysis Analysis Oct 2018- May 2019 June 2019- July 2019 Quic k L aunc h Aug 2019- Dec 2019 De e p Dive Pro g ram I mple me ntatio n Analysis Sept 2019- Dec 2019 Dec 2019- May 2021 E va lua tio n Oct 2020 - Dec 2021 10

  11. Site Se le c tion Pr oc e ss and Cr ite r ia 12 Candidate s Pr imar y Cr ite r ia • 5-20% e stimate d lo ad re lie f (base d o n primary ne e de d c rite ria) • $1 to $3 millio n pro je c t c o st • 3 to 5 ye ars until pro je c t ne e de d T o p 5 Se c ondar y Cr ite r ia • Supe rviso ry c o ntro l and data (base d o n primary & ac quisitio n (DSCADA) data fo r se c o ndary c rite ria) substatio n available • Mix o f c usto me rs • At le ast 60% busine ss lo ad T o p Cho ic e • No t do minate d by lo we r inc o me (base d o n additio nal, de e pe r analysis) 11

  12. F our Mile Quic k L aunc h T ac tic s 1. Sig nific antly inc re ase d se ve ral C&I E WR inc e ntive s up to $1,000 2. Sig nific antly inc re ase d Re side ntial E WR inc e ntive s fo r AC Re plac e me nts, DR and Applianc e Re c yc ling 3. E ng ag e d T rade Allie s and CE Ac c o unt Manag e me nt T e am 12

  13. De e p Dive Analysis T hre e part analysis c o nduc te d fall o f 2019 T ask 1 - Constr uc t c ombine d utility and c ustome r data se t for c ompr e he nsive analysis. Ide ntify c ustome r se gme nts most influe ntial to timing and magnitude of substation ne e d. T ask 2 - Apply c ombinations of De mand Side Manage me nt (DSM) me asur e s to unde r stand pote ntial c ontr ibutions to load r e duc tion at pe ak. E stimate par tic ipation le ve ls and de te r mine c ost-e ffe c tive inc e ntive s. T ask 3 - F inalize full por tfolio of DSM me asur e s and de sign NWS pr ogr am for de ployme nt E xpe c te d Saving s fo r 2020 – 270kW bo o ste d by inc luding me asur e s, bonus inc e ntive s, and ge ne r al NWS imple me ntation/ mar ke ting appr oac h. 13

  14. 2020 Custome r Ac quisition Appr oac h • Mo re dire c t me ssag ing –“Why are we do ing this? ” • Utilizing c usto me r se g me nts and pro pe nsity sc o re s to info rm c usto me r ac quisitio n plan • T rade Ally E ng ag e me nt • C&I F o c us • Spe c ific targ e ting o f multifamily pro pe rty manag e me nt and re side nts • Cro ss pro mo tio n o f E WR and DR • Pilo ting C&I E c o no mic DR 14

  15. L o o king Ahe ad - NWS Wo rking Gro up De ve lo ping a c ro ss-func tio nal inte rnal wo rking g ro up to suppo rt NWS planning and imple me ntatio n Vision – Plan and de plo y NWS pose – De ve lo p a c o mpre he nsive NWS strate g y inte g rating e ffo rts Pur into an e ffic ie nt and sc alable pro c e ss - What do e s NWS maturity lo o k like ? What ro le s Que stions to Answe r and c apabilitie s are re quire d in e ac h busine ss func tio n (e ng ine e ring , o pe ratio ns, c usto me r, re g ulato ry) to suc c e ssfully de plo y NWS? 15

  16. Que stions ? 16

  17. Mar k L uoma Sr . Pr ogr am Manage r mar k.luoma@c mse ne r gy.c om 17

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.