construction contractors briefing
play

Construction Contractors Briefing March 11,2020 Jacobs & AACPS - PowerPoint PPT Presentation

Construction Contractors Briefing March 11,2020 Jacobs & AACPS Jacobs is a global architectural, engineering & construction management services company Working with AACPS continuously since 1996 Assisted AACPS on 17 major


  1. Construction Contractors’ Briefing March 11,2020

  2. Jacobs & AACPS • Jacobs is a global architectural, engineering & construction management services company • Working with AACPS continuously since 1996 • Assisted AACPS on 17 major school projects worth over $600M • Current AACPS Projects ❖ Post-construction Phase – Arnold ES ❖ Construction Phase – Crofton HS ❖ Design Phase – Meade HS & Old Mill West HS

  3. AACPS Large Project Procurement CM – Multiple Prime Delivery Method • No single general contractor • CM splits work up into bid packages • Project has 9-12 general contractors with direct or “prime” contracts with AACPS • Each bid package publicly bid to prime bidders, lowest responsible bid awarded • Subs submit proposals to prime bidders before bid day

  4. AACPS Large Project Procurement Typical Jacobs HS Bid Package Breakout • 2A Sitework • 3A Concrete • 4A Masonry • 5A Structural Steel & Miscellaneous Metals • 6A General Works • 7A Roofing • 8A Windows, Storefront & Curtainwall • 9A Drywall, Ceilings & Painting • 9C Ceramic Tile & Resilient Flooring • 15A Mechanical, Plumbing & Fire Sprinkler • 16A Electrical

  5. CM Prime Contractor Bidder Lists • In addition to eMaryland Marketplace Advantage & AACPS’ internal bid list • Jacobs’ Master Bid List • How to get on that list • MBE considerations • Jacobs’ Notice of Pending Bid & Notice of Available Documents • Other CM’s

  6. Jacobs General Conditions Vendors • CM’s general conditions direct vendor procurement process • MBE considerations • Timing of GC Vendor RFP’s • Jacobs GCs Vendor Bid List

  7. Jacobs General Conditions Vendors Typical Jacobs GC Vendors Categories • Portable Sanitation • Construction Dumpsters & Hauling • Temporary Electric • Final Construction Cleaning • Moving Services • Temporary Labor (Site Housekeeping) • Miscellaneous Carpentry • Portable Site Office & Storage Cans • Roofing/Waterproofing Testing & Inspection • Seismic/Vibration Monitoring • Miscellaneous Carpentry • Temp Site Signage

  8. Jacobs Upcoming AACPS Projects • Old Mill West High School Project – new, $125M, 3-story, 320,000 GSF building on 48 acres at the Papa Johns site in Severn, MD • Meade High School Modernization – phased, fully occupied, $100M renovation/addition, 2-story, 385,000 GSF (265,000 reno / 120,000 addition) on 27 acres in Fort Meade, MD • If funding approved, probable bidding for both projects is fall or early winter 2020 • Probable construction start on both projects is spring 2021

  9. Questions?

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.