CONCEPTUAL STATION EXTERIOR REHABILITATION PRESENTATION BOARDS - - PDF document

conceptual station exterior rehabilitation
SMART_READER_LITE
LIVE PREVIEW

CONCEPTUAL STATION EXTERIOR REHABILITATION PRESENTATION BOARDS - - PDF document

Plaza Space Building Entrance CONCEPTUAL STATION EXTERIOR REHABILITATION PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016 Concourse Waiting Room CONCEPTUAL


slide-1
SLIDE 1

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

CONCEPTUAL STATION EXTERIOR REHABILITATION

Plaza Space Building Entrance

slide-2
SLIDE 2

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

CONCEPTUAL STATION INTERIOR REHABILITATION

Waiting Room Concourse

slide-3
SLIDE 3

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

PAXTON CREEK

CURRENT CONDITIONS

Warehouse Adjacent to Paxton Creek View of Paxton Creek from Mather Alley View of Paxton Creek on Market Street

slide-4
SLIDE 4

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

CARROLL CREEK LINEAR PARK FREDERICK, MD

CASE STUDY - PAXTON CREEK FLOOD CONTROL PROJECT

slide-5
SLIDE 5

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

PAXTON CREEK STUDY

Plan View of the Paxton Creek Revitalization Concept Cameron Street M a r k e t S t r e e t PAXTON CREEK FLOW CONTROL STUDY Identify short and long-term fmow reduction strategies along the length of Paxton Creek to mitigate fmooding in the TOD area. The study includes tasks to:

  • Identify similar projects around the country

and highlight successes and failures

  • Develop a hydraulic fmow model for all of

Paxton Creek

  • Test impacts of specifjc design concepts on

Paxton Creek fmow

  • Identify the most cost-efgective alternatives

to mitigate the fmood risk Rendering of Pedestrian Bridge Study is scheduled to be completed by April 2017. 10th Street

slide-6
SLIDE 6

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

CONNECTIVITY

MARKET STREET IMPROVEMENTS

Existing Market Street Conditions Proposed Market Street Concepts Rendering of the Proposed Market Street Concepts

10th Street Market Street

slide-7
SLIDE 7

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

CONNECTIVITY

SAFETY IMPROVEMENTS

Cameron Street Existing Conditions Cameron Street Proposed Improvements Market Street Underpass Improvements

slide-8
SLIDE 8

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

POST OFFICE BUILDING

ADAPTIVE REUSE CONCEPT C

Context Map Site Plan Bird’s Eye View

slide-9
SLIDE 9

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View Site Plan

POST OFFICE BUILDING

ADAPTIVE REUSE CONCEPT B

Context Map

slide-10
SLIDE 10

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View

POST OFFICE BUILDING

ADAPTIVE REUSE CONCEPT A

Site Plan Context Map

slide-11
SLIDE 11

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View Site Plan

PATRIOT NEWS SITE

ADAPTIVE REUSE CONCEPT

Context Map

slide-12
SLIDE 12

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View

PATRIOT NEWS SITE

BUILDING REPLACEMENT CONCEPT

Context Map Site Plan

slide-13
SLIDE 13

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View Site Plan

BUS TRANSFER FACILITY

STATION PASSTHROUGH CONCEPT

Context Map

slide-14
SLIDE 14

PRESENTATION BOARDS Harrisburg Transportation Center Transit-Oriented Development Study Design Concepts Open House December 6, 2016

Bird’s Eye View

BUS TRANSFER FACILITY

DEWBERRY LOOP CONCEPT

Site Plan Context Map