PUBLIC PORTS, JSC COMPANY PROFILE *Verejn prstavy, a.s = (Public Ports, JSC) *100% state-owned company (Ministry of Transport and Construction of the Slovak Republic) *Act No. 500/2007 Coll. amending the Act No. 338/2000 Coll. on Inland


  1. PUBLIC PORTS, JSC COMPANY PROFILE *Verejné prístavy, a.s = (Public Ports, JSC) *100% state-owned company (Ministry of Transport and Construction of the Slovak Republic) *Act No. 500/2007 Coll. amending the Act No. 338/2000 Coll. on Inland Navigation adopted in January 2008 *management and operation of public ports in Slovakia: Bratislava, Komárno and Štúrovo *development and modernization of the ports *building of the new ports *creating conditions for the integration of the waterways into the wider transport system

  2. PUBLIC PORT BRATISLAVA *the most important port in Slovakia *location of the cargo port: left bank of Danube between river kilometers 1.867,290 – 1.862,00 *location of the passenger port: left bank of Danube between river kilometers 1.870,00 – 1.867,00 *overall area: 1 581 300 m²; number of pools: 3; railway connection; road connection *commodities: petroleum products (20%), iron products (50%) *utilization rate is 30% of the total capacity of 4.000.000 tons per year. *fulfillment of EU requirements for the green operation of an effective and efficient port

  3. PUBLIC PORT KOMÁRNO *second most important port in Slovakia *location: left bank of Danube between river kilometers 1.770,00 – 1.762,00 at the conjunctions with the river Váh (identified as national IWW of international importance) *overall area: 643.000 m²; number of pools: 2; length of the quay: 6.000 m (overall); railway connection; road connection (distance from the highway: 9 km) *capacity: 800.000 tons per year *commodities: petroleum products (36%), iron products (22%), solid mineral fuels and agricultural products (13%)

  4. PUBLIC PORT ŠTÚROVO *passenger port only *location: left bank of Danube between river kilometers 1.718,80 – 1.718,30 *overall area: 13.518 m² *3 floating pontoons *attractive tourist destination

  5. PROJECTS OVERVIEW * Feasibility study for modernization of the public port of Bratislava * Construction of the LNG terminal in public port of Bratislava * Protection of ports * Construction of the background for vessels in public port Bratislava * CEF – Master plan and Feasibility study for the public port of Komárno

  6. FEASIBILITY STUDY FOR MODERNIZATION OF THE PUBLIC PORT OF BRATISLAVA Expected project duration: 2019 – 2020 ▪ The aim of the project – elaborate the feasibility study ▪ including EIA and CBA ▪ The feasibility study will assess the needs to modernize or build the following elements: ➢ Ports and nautical equipment in the basin Pálenisko, Winter port and Passenger port Ground slope with equipment (bollards, stairs, engineering facilities – water, ➢ electricity, sewerage) Depths in port basins ➢

  7. CONSTRUCTION OF THE LNG TERMINAL IN PUBLIC PORT BRATISLAVA: PRE-PROJECT PREPARATION Expected project duration: 2018 Environment impacts: *Roadmap to a Single European Transport Area Call for a reduction in oil dependency Reduce greenhouse gas emissions in transport by 60% until 2050 compared to 1990 levels *EU strategic documents – natural gas in the form of CNG, LNG is the best-prepared alternative fuel for transport The main activity of the project is the development of a feasibility study for the construction of the LNG terminal in the Bratislava public port: Technical study, Safety documentation for selected technology, CBA, EIA The feasibility study identifies the most suitable technologyfor the production and distribution of LNG - environmental, economic and safety point of view - distribution chain relationships

  8. CONSTRUCTION OF THE LNG TERMINAL IN PUBLIC PORT BRATISLAVA: CONSTRUCTION * Expected project duration: 2019 *Implementation of the project – environmentally friendly port *Outputs from the feasibility study ➢ The project documentation will be processed ➢ The implementation of the proposed terminal will be carried out *All activities – carried out by an external contractor based on the results of the public procurement

  9. PROTECTION OF PORTS: PRE-PROJECT PREPARATION Expected project duration: 2018 – 2019 Environmental impact: ➢ Dangerous substances and hazardous substances are permanently occured Pre-project preparation consists of two parts ➢ Port monitoring system ➢ Port emergency measures The elaboration of technical and economic studies: ➢ strengthening the monitoring of the Bratislava and Komárno public port areas ➢ identifying the security measures that can be applied in this specific area ➢ the distribution of navigation conditions information as well as the situation in the cargo port, navigating to the port and exchanging information about safety The technical and economic study will be processed with the following extent: ➢ Identifying and designing a monitoring system for ports in the TEN-T core network ➢ Design of parameters of the monitoring system ➢ Setting up a monitoring system co-operation ➢ Defining the requirements

  10. PROTECTION OF PORTS: CONSTRUCTION PART Two main activities: Construction of port monitoring system- design a comprehensive system for port monitoring of the port in TEN-T core network. Implementation of port emergency measures- design the implementation of emergency measures for the most frequently occurring emergency scenarios Port monitoring system: - Project documentation will be developed - Construction of port monitoring system Emergency port measures: - Project documentation - Purchase - Instalation - construction of Emergency Port measures

  11. CONSTRUCTION OF THE BACKGROUND FOR VESSELS IN PUBLIC PORT BRATISLAVA: PRE-PROJECT PREPARATION Expected project duration: 2018 – 2019 Technical and Economic Study - construction of background for vessels in order to provide the services for vessels The aim of the project ➢ elaborate technical and economic study ➢ the necessary capacity ➢ the most suitable localization ➢ the technology of stationary waste collection, ➢ drainage and refueling possibilities for vessels ➢ ecologize the public port and protect the environment The technical and economic study consist: ➢ Demand analysis ➢ Technical study ➢ Environmental Impact Assessment - EIA ➢ Cost-Benefit Analysis - CBA

  12. CONSTRUCTION OF THE BACKGROUND FOR VESSELS IN PUBLIC PORT BRATISLAVA: REALIZATION The construction and installation of the facility Project documentation Construct the background for vessels developed by technical and economic study for waste collection and treatment solution help to ecologize the public port and protect the environment

  13. CEF - MASTER PLAN AND FEASIBILITY STUDY FOR THE PUBLIC PORT OF KOMÁRNO Project duration: 09/2016 – 10/2019 ▪ Budget : 673 100,00 € ▪ ▪ Objectives of the Action: Delivery of a Master Plan to establish a strategic framework ➢ for the development of the Port of Komárno ➢ Delivery of a Feasibility study for the development of the Port of Komárno Part of a Global Project that aims to develop an integrated network ▪ of inland multimodal ports along the Danube River

  14. Thank you for your attention www.portslovakia.com

Download Presentation
Download Policy: The content available on the website is offered to you 'AS IS' for your personal information and use only. It cannot be commercialized, licensed, or distributed on other websites without prior consent from the author. To download a presentation, simply click this link. If you encounter any difficulties during the download process, it's possible that the publisher has removed the file from their server.