COMPANY PRESENTATION Leading Electrical and Instrumentation - - PowerPoint PPT Presentation

company presentation
SMART_READER_LITE
LIVE PREVIEW

COMPANY PRESENTATION Leading Electrical and Instrumentation - - PowerPoint PPT Presentation

COMPANY PRESENTATION Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company Agenda 1. Company Overview 2. Typical Installations 3. Contract Profiles 4. Typical Projects 5.


slide-1
SLIDE 1

Leading Electrical and Instrumentation Construction Company

COMPANY PRESENTATION

Leading Electrical and Instrumentation Construction Company

slide-2
SLIDE 2

Leading Electrical and Instrumentation Construction Company

Agenda

  • 1. Company Overview
  • 2. Typical Installations
  • 3. Contract Profiles
  • 4. Typical Projects
  • 5. Experience Schedule

Leading Electrical and Instrumentation Construction Company

slide-3
SLIDE 3

Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company

COMPANY OVERVIEW

slide-4
SLIDE 4

Leading Electrical and Instrumentation Construction Company

Overview

B&W have been established in the electrical and instrumentation (E&I) construction industry for 45 years. B&W are one of the largest specialist E&I contractors in South Africa. B&W has worked and gained valuable experience in mining, oil & gas, chemical, utilities, renewable energy, power generation, industrial process plants and infrastructure. The standard of electrical and instrumentation construction varies from industry to industry and B&W have developed highly qualified teams to cater for the needs of our clients. B&W hosts numerous complementary services ranging from field engineering, equipment procurement, material supply, testing and commissioning and maintenance services. B&W acquired Pontins in 2009, one of the largest specialist suppliers of earthing and lightning protection services and have been in business for 46 years. B&W’s commitment to providing a professional service, economically, timeously and with consistency is the key to our enviable growth record. B&W are a wholly owned subsidiary of the ELB Group.

slide-5
SLIDE 5

Leading Electrical and Instrumentation Construction Company

Company Structure

B&W Group

Mozambique Swaziland Kenya Registered Offices Namibia South Africa Company Services Health, safety and environment Marketing and proposals Financial Procurement Quality assurance Planning

HR skills development and training

Company Operations E&I installations process plants Regions Maintenance and shutdowns Special services Pontins

Earthing and Lightning Protection Specialists

Conductor Systems

Electrification Systems for Mobile Equipment B&W Instrumentation and Electrical SA (Pty) Ltd

39.27% Equity Level 4 B-BBEE Status Tanzania

slide-6
SLIDE 6

Leading Electrical and Instrumentation Construction Company

Group Structure

ELB Engineering Services (Pty) Ltd ELB Equipment Holdings (Pty) Ltd

B&W Instrumentation and Electrical (Pty) Ltd

ELB Group Ltd

ELB Educational Trust ELB International (Pty) Ltd Metquip (Pty) Ltd ELB Engineering (Pty) Ltd

B&W Instrumentation and Electrical Tanzania Ltd

B-Quip (Pty) Ltd Pontins (Pty) Ltd BWIE Properties (Pty) Ltd H&S Training Academy (Pty) Ltd

B&W Instrumentation and Electrical SA (Pty) Ltd

B&W Instrumentation and Electrical Kenya Ltd BWIE Instrumentation and Electrical Swaziland

B&W Electricidade Lda (Mozambique)

B&W Instrumentation and Electrical Namibia (Pty) Ltd

Conductor Systems

slide-7
SLIDE 7

Leading Electrical and Instrumentation Construction Company

Manpower Resources

Administration & Accounting 29 Construction Management 15 Quality Control 7 Planners 4 Junior Planners 3 HSE Personnel 15 Engineers & Technicians 22 Site Managers & Supervisors 38 Professional Project Managers 10 Foremen 21 Artisans 95 Learners 30 Semi-Skilled 250 – 400 Field Labour 600 - 1800

slide-8
SLIDE 8

Leading Electrical and Instrumentation Construction Company

Target Industries

Mining Renewable Energy Power Generation Transmission & Distribution Industrial & Utilities Chemical, Oil & Gas

slide-9
SLIDE 9

Leading Electrical and Instrumentation Construction Company

Project Footprint

slide-10
SLIDE 10

Leading Electrical and Instrumentation Construction Company

End User / Clients

slide-11
SLIDE 11

Leading Electrical and Instrumentation Construction Company

Health and Safety

5 Star NOSA graded NOSCAR Award for 7 consecutive years “Best performance E&I contractor in SA”

slide-12
SLIDE 12

Leading Electrical and Instrumentation Construction Company

HSE Statistics

Criteria 2014 2015 2016 2017 Total

Man-hours 1,812,100.00 2,088,867.00 1,303,206,25 663,459,58 5,867,632.83 Fatalities MTC’s and First Aid Cases Combined 10 6 2 1 19 LTI’s LTIFR per 200,000 hours Year to Date 0.00 0.00 0.00 0.00 0.00 LTIFR per 200,000 hours 12 Month Period 0.00 0.00 0.00 0.00 0.00

12 Months to Date – 2017

  • Lost Time Injury Rate (“LTIFR”) – 0.00 per 200,000 hours worked
  • Recordable Case Rate (“RCR”) – 0.00 per 200,000 hours worked
slide-13
SLIDE 13

Leading Electrical and Instrumentation Construction Company

Quality Statement

It is a prime management objective of B&W Instrumentation and Electrical to supply products and services with a high level of quality and reliability for the realisation of our clients requirements. It is the objective to effectively complete contracts with the following criteria as our primary requirements:

  • To minimise all Quality complaints
  • To maximise client confidence in our competence
  • The improvement of the profit objectives of the company by

adherence to the above

slide-14
SLIDE 14

Leading Electrical and Instrumentation Construction Company

ISO 9001:2008

B&W operates in accordance with procedures established to comply with the strenuous ISO 9001:2008 quality requirements. B&W are currently one

  • f the only ISO

9001:2008 accredited electrical and instrumentation contractors in Sub-Saharan Africa. This accreditation not only provides new clients with the comfort that our existing clients have come to expect from us, but affords us the opportunity of outside audits by the SABS to ensure that the standards set are not only maintained, but continually improved where possible.

slide-15
SLIDE 15

Leading Electrical and Instrumentation Construction Company

Level 4 Contributor 51% Black Ownership

BBBEE Status

slide-16
SLIDE 16

Leading Electrical and Instrumentation Construction Company

CIDB Certification

B&W has an 8EP and 8EB grading. This would include major public sector projects such as those for Eskom. Due to new regulations by the CIDB, certificates are no longer issued. B&W CIDB number: 149138

slide-17
SLIDE 17

Leading Electrical and Instrumentation Construction Company

Corporate Social Responsibility

In B&W Southern Africa Corporate Social Responsibility is an important business priority and integral to our

  • verall business strategy.

Corporate Social Responsibility (CSR) projects are selected on social need and the extent to which they are aligned with our business and can add value to our clients and our communities. Our policy is to identify worthy Social Economic Development (SED) projects in the areas in which we

  • work. Our projects have proved

highly successful, making a meaningful difference. CSR to us is about building relationships with our customers, attracting and retaining talented staff, managing risk and building reputation.

slide-18
SLIDE 18

Leading Electrical and Instrumentation Construction Company

Training

In response to the skills shortage in South Africa B&W has invested substantially in the training of field labour to increase its skills

  • pool. B&W has its own fully equipped in-house

training centre based in Alberton and is an accredited service provider through Construction SETA. B&W has implemented training programmes in line with accredited SAQA unit standards to advance employee skills and ensure trainees receive an accredited qualification. To determine the appropriate skills development required B&W provides ongoing on-the-job

  • assessments. In addition long-term incentives

ensure retention of core staff.

slide-19
SLIDE 19

Leading Electrical and Instrumentation Construction Company

Typical Training Courses

Approved Unit Standards

  • 229998

Explain and perform fall arrest techniques when working at heights

  • 9964

Apply health and safety to a work area

  • 12484

Perform basic fire fighting

  • 120344

Demonstrate knowledge and understanding of relevant current

  • ccupational health and safety legislation
  • 12878

Use and maintain power hand tools on a construction site

  • 116999

Apply accurate information about HIV & AIDS to everyday life Unit Standards Awaiting Approval

  • Hazard identification and risk assessment
  • First aid (Level 1–3)
  • Fire fighting
  • Occupational health and safety rep
slide-20
SLIDE 20

Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company

TYPICAL INSTALLATIONS

slide-21
SLIDE 21

Leading Electrical and Instrumentation Construction Company

Electrical

slide-22
SLIDE 22

Leading Electrical and Instrumentation Construction Company

Electrical

slide-23
SLIDE 23

Leading Electrical and Instrumentation Construction Company

Instrumentation

slide-24
SLIDE 24

Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company

CONTRACT PROFILES

slide-25
SLIDE 25

Leading Electrical and Instrumentation Construction Company

Contract Profile

Temane Pande Development Project

Client: Sasol Engineer: Foster Wheeler Location: Temane, Mozambique Value: R49,6 million Start Date: January 2003 Completion Date: March 2004 Site Man-hours Used: 256,000 Peak Manpower: 380 Number of Drives: 324 I/O Count: 2800 Field Instruments: 1120 Quantity of Cable: 314,000m Quantity of Cable Rack: 11,600m

slide-26
SLIDE 26

Leading Electrical and Instrumentation Construction Company

Contract Profile

Waste Water Recycle Facility Project

Client: Sasol Engineer: Foster Wheeler Location: Secunda Value: R35,0 million Start Date: June 2004 Completion Date: November 2005 Site Man-hours Used: 196,000 Peak Manpower: 200 Number of Drives: 158 I/O Count: 1630 Field Instruments: 879 Quantity of Cable: 182,000m Quantity of Cable Rack: 7,282m

slide-27
SLIDE 27

Leading Electrical and Instrumentation Construction Company

Contract Profile

Veolia Water Treatment Plant Project

Client: Sasol Engineer: Veolia Location: Secunda Value: R38,2 million Start Date: March 2005 Completion Date: April 2006 Site Man-hours Used: 218,000 Peak Manpower: 288 Number of Drives: 330 I/O Count: 2960 Field Instruments: 1230 Quantity of Cable: 233,000m Quantity of Cable Rack: 9,214m

slide-28
SLIDE 28

Leading Electrical and Instrumentation Construction Company

Contract Profile

Pprust 600KTPM Concentrator Project

Client: Amplats Engineer: DRA Location: Potgietersrust Value: R179,0 million Start Date: March 2007 Completion Date: April 2009 Site Man-hours Used: 802,000 (Accident free) Peak Manpower: 928 Number of Drives: 483 Field Instruments: 3700 Quantity of Cable: 450,000m Quantity of Cable Rack: 27,000m

slide-29
SLIDE 29

Leading Electrical and Instrumentation Construction Company

Contract Profile

Shondoni Mining Project

Client: Sasol Mining Engineer: Worley Parsons Location: Secunda Value: R86,0 million Start Date: May 2013 Completion Date: June 2015 Site Man-hours Used: 230,000 Peak Manpower: 94 Number of Substations: 8 Number of Mini Substations: 10 Number of 11kV Panels: 72 Number of 132kV Circuit Breakers: 4 Number of 20MVA 22kV / 11kV TRF: 2 Number of Street Lights: 54 Quantity of Cable: 32,000m

slide-30
SLIDE 30

Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company

TYPICAL PROJECTS

slide-31
SLIDE 31

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Project Overview

Project Name: Ambatovy (Process Plant) Location: Tamatave, Madagascar Project duration: 26 months (July 2009 – September 2011) B&W contract value: US$ 60 million

  • After the successful completion of the Early Works contract on the same project, B&W was appointed as the main Electrical &

Instrumentation installation contractor on one of the largest projects in the world at the time.

  • The plant is designed to produce 50t of nickel, 5t of cobalt and 130t of ammonium phosphate. Although the plant is constructed in

Tamatave, near the harbour, the mine is situated near the town of Muramanga, some 450km away.

  • The scope of work included the entire electrical and instrumentation installation, including calibration and cold commissioning, on the

plant site, with the exception of the Refinery, Power Generation Plant, Acid Plant and Lime handling sections, which were separate

  • packages. The enormous scope of work, and limited time for completion, make the project one of, if not the biggest E&I project

undertaken by a South African contractor.

  • The scope for included everything from the 11kV and 6.6kV distribution, plant wide, to the lighting and small power, calibration of

instruments, LV and instrumentation installations and cold commissioning, while the Early Works contract included the design, supply and installation of 11kV overhead lines, distribution and street lighting on the plant site and 6.6kV overhead lines, distribution and street lighting at the mine site.

slide-32
SLIDE 32

Leading Electrical and Instrumentation Construction Company

Project Reference

  • 900,000m of electrical cabling
  • 490,000m of instrument cabling
  • 49,000m of straight cable racking plus 4,950 fittings
  • 25,000m of stainless steel instrument tubing
  • 395t of sundry steelwork & angle droppers
  • 30,000m of single unistrut supports
  • 1,100 drives
  • 3,455 instruments
  • 1,950 luminaries
  • 4,880,785 man-hours – all without lost time injury (5,232,096 including the Early Works)
  • A peak of 1,656 personnel on site
  • The final value of the contract was roughly R430 million and being that the bulk of the materials, including the equipment, cable,

racking, luminaries, instruments and even the cable glands were free-issue by the client; this understates the magnitude of the work completed.

  • On site, B&W had a peak of 628 expatriates (mainly South African) and employed a peak of 1,028 local Malagasy workers. Due to local

content requirements, B&W established the subsidiary, B&W Madagascar SaRl, in Madagascar for the execution of the contract.

Ambatovy Project Statistics

slide-33
SLIDE 33

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Project Overview & Statistics

Project Name: Ambatovy (Early Works) Location: Tamatave, Madagascar Project duration: 8 months (November 2008 – June 2009) Contract value: US$ 16 million Project statistics (Early Works, Plant and Mine Site)

  • 25km 11kV overhead lines
  • 22,5km 6.6kV overhead lines
  • 28km fibre optic
  • 388 luminaries
  • 351,311 man-hours, all without lost time injury
slide-34
SLIDE 34

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Plant Site

slide-35
SLIDE 35

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Mine Site

slide-36
SLIDE 36

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Harbour

slide-37
SLIDE 37

Leading Electrical and Instrumentation Construction Company

Project Reference

Ambatovy Pipeline

slide-38
SLIDE 38

Leading Electrical and Instrumentation Construction Company

Coal Project

South Africa

  • Contracts awarded for two Coal Projects in South Africa, combined value of

R152.0 million

slide-39
SLIDE 39

Leading Electrical and Instrumentation Construction Company

Instrumentation

Madagascar

  • Completed Early Works Project and commenced E&I Installation on Main

Process Plant

  • Main Process Plant was initially delayed for ten months
slide-40
SLIDE 40

Leading Electrical and Instrumentation Construction Company

Coal Project

  • 66kV Overhead Line
  • Remote Northern Mozambique
  • 1.2km span with Lattice Structures

Mozambique

slide-41
SLIDE 41

Leading Electrical and Instrumentation Construction Company

Coal Project

  • Commenced construction on Moatize Coal Project in Northern Mozambique
  • Further opportunities in the region with other clients now starting with

project implementation

Mozambique

slide-42
SLIDE 42

Leading Electrical and Instrumentation Construction Company

Oil & Gas

  • Awarded E&I Installation Extension to Panda Gas Project
  • B&W awarded Phase 1 in 2002

Mozambique

slide-43
SLIDE 43

Leading Electrical and Instrumentation Construction Company

Sands Project

  • 22kV Supporting Infrastructure
  • Substations & H.T cabling
  • Back up generators
  • Process Cabling & Instrumentation for:-
  • Wet Concentrator Plant
  • Ponds, Pontoons & Dredges
  • Mineral Separation Plant
  • Starter Ponds
  • Product Storage
  • Conveyors

Mozambique

slide-44
SLIDE 44

Leading Electrical and Instrumentation Construction Company

Solar Photovoltaic

  • Contract for the 64MWp Solar Photovoltaic ("PV") Project at Postmasburg in the

Northern Cape area of South Africa

  • The project is a key component of Phase 2 of the South African Department of Energy's

Renewable Energy IPP Procurement Program

  • Assistance with commissioning of the total plant

South Africa

slide-45
SLIDE 45

Leading Electrical and Instrumentation Construction Company Leading Electrical and Instrumentation Construction Company

EXPERIENCE SCHEDULE

slide-46
SLIDE 46

Leading Electrical and Instrumentation Construction Company

Current Projects

OWNER EPCM CONTRACTOR PROCESS LOCATION CURRENT VALUE MONTH OF COMPLETION Sibanye Platinum Sibanye Platinum E&I Installation Rustenburg RSA R31,5 million / year Annuity Sasol Petrochem Sasol E&I Installation Secunda RSA R8 million / year Annuity Vedanta Resources Black Mountain Mine Black Mountain Pre-start Electrical Works Aggeneys RSA R1,8 million April 2018 Sasol MegChem SCC Cyclone and Riser Replacement E&I Installation Secunda RSA R1,3 million April 2018 Vedanta Resources ELB Gamsberg 66kV OHL and 66kV Sub-station Aggeneys RSA R110 million April 2018 Vedanta Resources ELB Gamsberg Water Works Electrical Installation Aggeneys RSA R14 million April 2018 Sasol Sasol Sasol Shondoni Underground Electrical Installation Secunda RSA R25,9 million April 2018 SENER Eltherm SA Eltherm Electrical Heat Tracing Installation Upington RSA R2,8 million May 2018 Vale ABB Moatize Electrical Upgrade Mozambique R2,8 million June 2018 Vedanta Resources ELB Gamsberg Concentrator & Process Plant Aggeneys RSA R213 million July 2018 Eskom ABB Kendal Power Station VSD Upgrade Middelburg RSA R6,6 million July 2018

slide-47
SLIDE 47

Leading Electrical and Instrumentation Construction Company

Current Projects

OWNER EPCM CONTRACTOR PROCESS LOCATION CURRENT VALUE MONTH OF COMPLETION Sasol Khewija Engineering & Construction (Pty) Ltd Sasol Alrode Expansion II E&I Installation Alberton RSA R5,5 million November 2018 Sasol WBHO Sasol Fine Ash Dame 6 E&I Installation Secunda RSA R41 million February 2019 Eskom ELB Medupi Power Station E&I Installation & Material Handling Ellisras RSA R49,6 million February 2019

slide-48
SLIDE 48

Leading Electrical and Instrumentation Construction Company

Oil & Gas

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Fina Fluor Daniel Fina Petroleos Refinery Crude Unit Revamp Instrumentation Installation Angola R8 million 6 months Mosgas / Petrosa Foster Wheeler Low Aromatic Distillation Unit E&I Installation Mossel Bay RSA R12,7 million 7 months Sasol Foster Wheeler Temane Panda Processing Facility E&I Installation Mozambique R49,6 million 15 months Sasol Foster Wheeler Waste Water Recycle Facility E&I Installation Secunda RSA R35 million 18 months Sasol Veolia Veolia Water Treatment Plant E&I Installation Secunda RSA R38,2 million 14 months Sasol Foster Wheeler Gas Engine Power Plant E&I Installation Sasolburg RSA R22,4 million 7 months Sasol VGI Consulting Inc. Sasol Wholesale Logistics Depot E&I Installation Alberton RSA R60 million 13 months Sasol Foster Wheeler Sasol Utilities Expansion E&I Installation Sasolburg RSA R29 million 8 months Sasol Sastech New Pre-Coat Tank Unit 219 E&I Installation Secunda RSA R6,4 million 6 months Sasol Thyssenkrupp Uhde Temane Expansion E&I Installation Mozambique R58 million 19 months Sasol Sasol Unit 243 Upgrade E&I Installation Secunda RSA R7,5 million 3 months

slide-49
SLIDE 49

Leading Electrical and Instrumentation Construction Company

Chemical

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Bayer Chemicals Foster Wheeler Chrome Chemical Plant E&I Installation Newcastle RSA R23,4 million 9 months Indian Ocean Fertilizers Sulphos (EMS / SNC Lavalin) IOF Sulphuric & Phosphoric Acid Plant E&I Installation Richards Bay RSA R22 million 8 months Lafarge ICER Cement Plant Electrical Upgrade (Labour only) Lichtenberg RSA R10,1 million 5 months Amplats (ACP) Stein Muller Acid Plant E&I Installation Rustenburg RSA R15,5 million 10 months PPC Krupp UHDE Slagment Plant Electrical Installation Saldanha RSA R14 million 14 months PPC Kentz / TWP PPC Hercules Expansion E&I Installation Pretoria RSA R27 million 8 months Air Products Air Products G-Oxygen Plant E&I Installation Vanderbijlpark RSA R14,5 Million 6 months

slide-50
SLIDE 50

Leading Electrical and Instrumentation Construction Company

Industrial Plants

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION PFG Glass PFG PFG Glass E&I Installation Springs RSA R21,4 million 5 months Transnet Hatch Coega Infrastructure Port Elizabeth RSA R68 million 14 months Transnet Transnet Port Link Line & Salkor Yard Electrical Services Saldanha RSA R11 million 7 months Ubombo Sugar Bosch Ubombo Sugar Mill Factory Expansion E&I Installation Swaziland R44 million 5 months Sappi AMEC Sappi GoCell Upgrade E&I Installation Nelspruit RSA R58 million 14 months Nestle ELB Nestle Process Plant E&I Installation Estcourt RSA R32 million 10 months

slide-51
SLIDE 51

Leading Electrical and Instrumentation Construction Company

Renewable Energy

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Lesedi Energy Comycento Lesedi Photovoltaic Solar Kathu RSA R40 million 10 months

slide-52
SLIDE 52

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Aquarius DRA Everest South Platinum Concentrator E&I Installation Lydenburg RSA R13,4 million 3 months Amplats Waterval Smelter Hatch ACP Stage B E&I Installation Rustenburg RSA R16,5 million 7 months Xstrata J.V DRA Mototolo Concentrator & Spiral Plant E&I Installation Lydenburg RSA R23,1 million 7 months Nkomati DRA Nkomati Concentrator E&I Installation Machadadorp RSA R16,4 million 6 months De Beers Bateman Finsch Mine Treatment Plant Upgrade E&I Installation Lime Acres RSA R46.3 million 20 months Aflease Bateman Aflease Uranium Plant E&I Installation Klerksdorp RSA R68 million 9 months Amplats DRA Pprust 600KTPM Concentrator E&I Installation Potgietersrus RSA R179 million 27 months Amplats Vhumbanani Amandelbult Concentrator E&I Installation Northem RSA R48 million 6 months ARM / Assmang DRA Iron Ore Plant E&I Installation & Infrastructure Sishen RSA R105 million 14 months Amplats Vhumbanani Pilanesberg Concentrator E&I Installation Rustenburg RSA R34 million 7 months

slide-53
SLIDE 53

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Anglo Coal / BHP Billiton DRA Phola Coal E&I Installation Ogies RSA R32 million 6 months BHP Billiton DRA DMO Washing Plant E&I Installation Middelburg RSA R88 million 14 months Amplats Hatch PMR Effluent Treatment Plant E&I Installation Rustenburg RSA R26 million 7 months BHP Billiton Bateman ET DMO Materials Handling E&I Installation Middelburg RSA R156 million 16 months Nkomati DRA Nkomati Phase 11B E&I Installation Machadadorp RSA R26 million 6 months Sasol RSV 11kV Power Lines Installation Secunda RSA R13 million 7 months Douglas Colliery Bateman Water Purification E&I Installation Witbank RSA R17 million 5 months Kumba Iron Ore Hatch Sishen South E&I Installation Postmasburg RSA R84 million 16 months Assmang DRA KEP E&I Installation Kathu RSA R148 million 22 months Assmang Chrome NAC Furnace Process Upgrade E&I Installation Machadodorp RSA R11,5 million 7 months Sasol RSV Thubelisha Mine Electrical Installation, Termination for Plant Wide & OHL Secunda RSA R34 million 15 months

slide-54
SLIDE 54

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Whims BKM DRA WHIMS Iron Ore Upgrade E&I Installation Sishen RSA R64 million 8 months Kasese Bateman Kasese Cobalt E&I Installation Uganda R14,6 million 5 months Namdeb Bateman DMS Plant – Elizabeth Bay E&I Installation Namibia R28 million 7 months Kenmare Resources Bateman Moma Mineral Sands OHL and E&I Installation Mozambique R34 million 20 months Letseng Diamonds Bateman Diamonds Process Plant E&I Installation Lesotho R16 million 6 months African Mining Sennet / Logichem Copper Mine E&I Installation Botswana R22,4 million 6 months Albidon Zambia Limited GRC Minproc Munali Process Plant E&I Installation Zambia R16 million 4 months Equinox Ausenco / Bateman Lumwana Copper Mine E&I Installation Zambia R14,9 million 9 months Dynatec SNC Lavalin Ambatovy OHL & Infrastructure Madagascar R96 million 18 months Hulletts PGBI Xinavane 380 TCH Factory Expansion Electrical Installation Mozambique R33 million 6 months Amplats Vhumbanani Unki Platinum Mine Concentrator E&I Installation Zimbabwe R67 million 13 months

slide-55
SLIDE 55

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Vale ABB Moatize Coal Infrastructure, OHL & Substations E&CI Installation Mozambique R233 million 30 months Dynatec SNC Lavalin Ambatovy Process Plant E&I Installation Madagascar R414 million 30 months Rio Tinto Rio Tinto LV & MV Reticulation Mozambique R6,8 million 7 months Riversdale Sedgman Benga Coal Handling & Preparation Plant E&I Installation Mozambique R53 million 12 months Vale Vale 66kV OHL Repairs Mozambique R5,6 million 2 months Assmang DRA KOP E&I Installation Kathu RSA R44 million 16 months Base Minerals Ausenco Kwale Mineral Sands E&I Installation Kenya R94 million 9 months Rio Tinto Rio Tinto Various E&I Installation Mozambique R12 million 24 months Kumba ELB Sishen Iron Ore Mine - DMS Plants E&I Installation Kathu RSA R34,3 million 9 months Kumba ELB Kolomela Iron Ore Mine - DMS Plants E&I Installation Posmasburg RSA R24,7 million 9 months

slide-56
SLIDE 56

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION Xtrata DRA Tweefontein Collieries Coal Mine Infrastructure E&I Installation & Material Handling Tweefontein RSA R230 million 16 months Jindal S&P B&W Plant 33kV Reticulation Mozambique R13,5 million 11 months Sasol Sasol Coal Tweedraai Electrical Infrastructure Secunda RSA R14 million 4 months Sasol BET Tweedraai E&I Installation & Material Handling Secunda RSA R17 million 5 months PPM Worley Parsons Rados E&I Installation & Material Handling Pilanesberg RSA R8,2 million 6 months Sasol Mining ELB Impumelelo Mine E&I Installation & Material Handling Secunda RSA R10,6 million 12 months Anglo American Venn & Milford Zebulo Colliery Underground Mining Ogies RSA R11,7 million 5 months Sasol Mining Worley Parsons Shondoni Mine Phase I & II Sub-stations & Cabling Secunda RSA R117 million 34 Months Swakop Uranium Amec / Bateman Husab Uranium Mine E&I Installation Namibia R345 million 28 Months Vale ABB Moatize Expansion Electrical Reticulation Network & 220kv Outdoor Switchyards Mozambique R209 million 24 Months Assmang DRA Khumani Mine E&I Installation Upgrade Kathu RSA R10,1 million 7 Months

slide-57
SLIDE 57

Leading Electrical and Instrumentation Construction Company

Mining

OWNER EPCM CONTRACTOR PROCESS LOCATION VALUE DURATION PPM Hatch PPM Chromite E&I Installation Pilanesberg RSA R12,1 million 5 months Assmang ELB Black Rock Mine E&I Installation & Material Handling Hotazel RSA R21,5 million 8 months

slide-58
SLIDE 58

Leading Electrical and Instrumentation Construction Company Dean Nevay Project Director Tel: +27 11 907 1663 Fax: +27 11 907 1957 E-mail: deann@bwie.co.za

Contact Details

Ken Nel Business Development Manager Tel: +27 11 907 1663 Fax: +27 11 907 1957 E-mail: kenn@bwie.co.za Leading Electrical and Instrumentation Construction Company